Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

GM Solar Design Basis OFF Site GM Solar(Bokaro)

S.No Design Basis Description DCBL Requiement Bidder Confirmation Remarks


A Design Basis
1 All sites string inverters are mandatory, with requisite spares for uptime of 99.5%. Bidder to confirm Yes
2 Bidder will be to go East-West facing of the Modules Bidder to confirm Depending on PV Syst and Design Basis Report DCBL Comments would be taken into consideration
All HT panels will be Prefered from OEM, in case of Panel Builder vendor has to provide CPRI Type Test certificates
3 Bidder to confirm NA
for client approval prior to ordering.
No cloud based SCADA, historian with web client to be considered. DCB to share specifications for the same.
4 (Industrial grade SCADA PC to be shared with EWS and OWS with 40”screen for OWS with 21” for EWS, with web Bidder to confirm NA
client, DCB will provide static IP for internet access).
UPS on line redundancy will be there for MCR with 1 hrs back up with common battery bank. VRLA battery (preferred
makes: Amaraja and exide). The ACDB should have two bus bars one for RAW power and other for UPS power, the
5 Bidder to confirm NA
UPS power busbar should also be providing power to DCDB for batteries in HT panel, emergency lights, fire alarm
panels and SCADA panels.
6 String inverters station shall be out door type and installed with Canopy as per statutory . Bidder to confirm Yes
The main HT panel before the HT side of the IDT transformer will be an outdoor type. To be mounted on a skid
7 foundation with shed cover with cantilever of 500mm protruding outside from all 4 directions with shed height at Bidder to confirm NA
800mm above the panel height in centre.
8 Inverter combiner box will be an outdoor type with a canopy on top of it. Bidder to confirm Yes
DCBL will provide land clear of vegetation and land cleaning will be done, but site will be levelled as per contour no
9 Bidder to confirm NA
flat land will be provided. ( +/- 200mm undulation Land will handover to EPC Developer)
10 Modules proveness - BIS and already installed base in India for the minimum 530 Wp & Above wattage of modules. Bidder to confirm Yes

Installation of MMS should be shadow free but contour hugging is allowed but not for the same table in seasonal
tilt. Column post should be 3 mm minimum with HDG structure of 80 um. Rafters and bracing to be minimum 2 mm
11 Bidder to confirm NA
and and purlins can be 1.6 mm minimum. The UR in staad for all the nodes should be kept at a maximum of 0.8 only.
Wind zones of the region to be considered for wind uplift and downlift calculation in Staad pro.
IDT losses cap to be freezed at load loss at 0.1% and no load at 1.0%. Without -Ve IS Tolerance (IS 2026 design criteria
12 Bidder to confirm NA
to be followed for Trafo Design)
IDT Temperature Rise shall be Limited to 35DegC (Oil) & 40 Deg C ( Winding) over an Ambient of 50 Deg C (IS 2026
13 Bidder to confirm NA
design criteria to be followed for Trafo Design)
Bidder to share organo chart, project implementation schedule and list of enlisted vendors/contractors in each state
14 Bidder to confirm Yes
with team members. .
15 M25 grade concrete throughout the project for all foundations. Bidder to confirm NA
16 ESE LA has been considered as per CEIG approval statewise. Bidder to confirm NA
17 Fault level for HT panels to be 40KA for 1 sec. ( CPRI type tested) Bidder to confirm NA
18 HT panel spaces and bus bar and connectivity to be checked by bidder. Bidder to confirm NA
Combined cable losses till IDT input shall be 1.5% maximum at full load at STC and AC cable from IDT to main control
19 Bidder to confirm NA
room at 0.5% maximum at full load at STC. (Measured from Inverter to IDT Input)
60 cycles for water cleaning has been considered. DCBL will provide a point for raw water within the plant premise to
20 Bidder to confirm NA
be cleared latter.
- Peripheral road should be constructed in WBM along the boundary having a width of 4 Mtr (3m carriage width +
0.5m shoulder + 0.5m shoulder). Elevation should be 300mm above natural ground level. Camber slope should be one-
21 sided towards drain (opposite to the fencing side) Bidder to confirm NA
- Internal roads should be constructed in WBM along the boundary having a width of 3 Mtr. Elevation should be
300mm above natural ground level.
22 UN Earthed XLPE Cables to be considered Bidder to confirm Yes
23 DC for cables between string inverters to LT ACDB Bidder to confirm Yes
Fencing to be considered as per the below mentioned specifications -
'- Mesh size of 2"x2", PVC coated mesh along with a concentrica coil along with a Y angle. Base of the mesh should be
supported with a welded L angular of 65x65x6 mm (with two coats of approved primer and paint). All angules shall be
24 of minimum 65x65x6 mm. Bidder to confirm NA
- Height of the mesh should be considered at 2mtrs and concentrica of 0.5Mtr, distance between successive
supporting posts should not be more than 3 meters. Bracings should be provided with the fencing in the
turning/corner points. Stay posts shall be created at every 30 m distance
MMS pile at to be considered at 1800mm depth with 300mm Dia. The volume of the concrete needed throughout the
25 Bidder to confirm NA
project will be calculated on the soil test report of each site.
26 DCB to share radiation corrected generation numbers for plant acceptance. Bidder to confirm Yes
27 DLP to be shared by DCB to bidder Bidder to confirm NA
30 W LED Street lights with 80AH Backup Battery and 8 Feet Pole + 1 Feet Wall from FGL design to maintain out
28 Bidder to confirm NA
Boundry Area Street Light at Every 50 Mtr Distance
29 Chemical earthing to be checked for all the plants Bidder to confirm NA
30 DC grid to be considered minimum 25 x 3 mm Bidder to confirm NA
CCTV description to be shared,1 No PTZ/ MW IP Base Camera with night vision to cover all the boundary of the plant,
31 Bidder to confirm NA
dome shaped in control room and bullet type at main gate near security room to monitor movements.
32 Fire fighting in line with CEIG requirement, strategic locations of sand buckets at strategic location for pv module area. Bidder to confirm As per industry standards
33 Module earthing will be as per OEM to ensure warranty terms. Bidder to confirm Yes
34 Inverter Max 20% overloading to be confirmed. Bidder to confirm Yes
Existing gantries to be utilised within Cement Plant Area, maximum one cable tray to be supplied and installed for
35 Bidder to confirm NA
cable routing.
B PV System Solar Assumptions
B-1 Pv Syst Assumption Yes
Pv Syst to be run on Solar GIS (latest Update) Radiation
1 Global Radiation References to be followed Yes
ref only
GM Solar Design Basis OFF Site GM Solar(Bokaro)
S.No Design Basis Description DCBL Requiement Bidder Confirmation Remarks
Bidder to specify his guaranteed PR above 75% only.
2 Net Min Perfromance ratio - Minimum 75% Yes
PR Test shall be conducted on the guaranteed PR.
3 Global Horizontal Irradiance Bidder to confirm Yes
4 Soiling Losses Bidder to confirm Yes
5 Thermal Loss Bidder to confirm Yes
6 Module Array Mismatch loss Bidder to confirm Yes
7 Inverter Loss Bidder to confirm NA
8 Transformer Loss Bidder to confirm Yes
9 DC Cable Loss ( Cu Cable) Bidder to confirm Yes
10 AC Cable Loss ( Al Cable) Bidder to confirm Yes
11 Inverter Selection Bidder to confirm Yes
12 PV Solar Module Bidder to confirm Yes
13 Global Irradiation Ref (GTI) to be considered for calculation of PR and generation reference Bidder to confirm Yes
14 Generation on P-50 Bidder to Guarentee Generation on P-50 2190047 kwh
15 Generation on P-75 Bidder to Guarentee Generation on P-75 2111569 kwh
16 Generation on P-90 Bidder to Guarentee Generation on P-90 2040779 kwh
17 Module Mounting Structure GI Structure for GM Design Design accoridng to Industry Standard
18 Weather Monitoring Bidder to confirm As per industry standards

You might also like