GENERAL NOTES:

1. ALL SITE DIMENSIONS ARE MEASURED IN MILLIMETERS UNLESS STATED OTHERWISE.


2. INDIVIDUAL BUILDING DIMENSIONS & DETAILS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.

THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT WRITTEN AUTHORIZATION FROM THE CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT OF SAUDI READYMIX CONCRETE CO. LTD.
3. ALL ELEVATION DIMENSIONS AND LEVELS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
4. ALL MEASUREMENTS ARE SUBJECT FOR SITE VERIFICATION.

5. ALL FACILITIES SHOWN IN THIS PLAN ARE IN COMPLIANCE TO THE REQUIREMENT OF THE
PRODUCTION
DEPARTMENT. ANY CHANGES OR REVISIONS SHOULD BE DONE BY THE ISSUING DEPARTMENT WITH THE
APPROPRIATE
REMARKS AND NOTES FROM THE RESPECTIVE APPROVING COMMITTEE. REVISIONS ARE TO BE DONE
ONLY AFTER
REMARKS ARE RECEIVED.

KEY PLAN:
N

ADMIXTURE
14

BAY - 05
SILO FOUNDATION TANK W E

300T 300T S

SEPTIC

PLANT #02
TANK
TOTAL AREA = (+/-) 10,000.00 M2
7

150T
TOTAL PERIMETER FENCE = (+/-) 400.00 LM

BATCH
LEGEND:

10 01 - ENTRANCE AND EXIT GATE AND BOUNDARY FENCE

TOILET
LABOR
D

BAY - 04
6 02 - PORTABLE GUARD HOUSE
03 - PORTABLE OFFICE
04 - PORTABLE LABORATORY (OPTIONAL)

MUD SETTLING
BATCH 14 05 - CONCRETE WASTE AREA
A

TANK
CABIN
06 - LABOR TOILET

AGGREGATE STOCK BAY


SINK
OPEN SHELF STEEL UNDER CABINET

LABORATORY 07 - SEPTIC TANK


CURING TANK

CURING TANK

08 - WEIGHBRIDGE
CURING ROOM

PORTABLE
LABORATORY

BAY - 03
09 - BATCH PLANT #01
O

CONC. PAD

11
DIESEL TANK - SILO FOUNDATION #01
4 01
WATER TANK 04 - ADMIXTURE TANK #01
SAMPLE AREA

- MUD SETTLING TANK #01


OFFICE

DIESEL TANK
02
10 - BATCH PLANT #02
R

WATER TANK 03
CONCRETE

- SILO FOUNDATION #02


WASTE
AREA

GENERATOR
- ADMIXTURE TANK #02
5

CONTROL SERVICE AREA


13
01

- MUD SETTLING TANK #02

GROUND
HOOPER

BAY - 02
GENERATOR
02
11 - AGGREGATE STOCKBAY (5-BAY)
OFFICE PORTABLE

ICE PLANT
12 - TRUCK WASHING AND DUMPING AREA
GENERATOR 13 - CONTROL SERVICE AREA

GROUND
HOOPER
03
CHILLER PLANT
14 - SLAB ON GRADE
3 14 GENERATOR
S

04

BAY - 01
WATER TANK 02

EDS
ROOM 14
OFFICE PORTABLE
S

WATER TANK 01

3
E

MUD SETTLING

DOCUMENT DISCLAIMER:
TANK
PLANT #01

BATCH
CABIN
C

BATCH

3
9 2
C

1
14 REVISION NO.: REVISED BY.: REVISION DATE:

TRUCK WASHING
AND DUMPING AREA
REVISIONS

TRUCK WASHING
150T

AREA
A

300T 300T
SETTLING TANK

SILO FOUNDATION ADMIXTURE

D:\ARCHIE FILES; RM STANDARD PROJECT - SITE DEVELOPMENT PLAN


GUARD TANK
2 8

WASTE DUMPING
HOUSE/
MRR
MAIN ENTRANCE /

12

AREA
DRAWING TITLE:

14
EXIT GATE

WEIGHBRIDGE RM
1 ON-SITE PROJECT
LOCATION: DAMMAM, KINGDON OF SAUDI ARABIA
DRAWING TITLE:

SITE DEVELOPMENT PLAN


SCALE: 1 : 100 UNIT: METERS
CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT
ARCHITECTURAL & INTERIOR DESIGN WORKS:
DESIGNED BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023

REFERENCE FILE LINK:


AUTOCAD BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023
CHECKED BY: ENGR. MOHAMMAD ZAYED DATE: 11-JUN-2023

S I T E D E VE L O P M E N T P L AN
CHECKED BY: ENGR. ASHRAF YOUSEF DATE: 11-JUN-2023
DRAWING NO.: PAGE NO.: FINAL APPROVAL:

RM__-AD-SDP
01 CHIEF OPERATION OFFICER
DATE:
LEFT CORNER RIGHT CORNER

BOUNDARY FENCE AND GATE PLAN


SCALE 1:100 METERS

GATE ELEVATION
SCALE 1:100 METERS
GATE AND BOUNDARY
FENCE
DATE
CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 1 OF 3 02
DETAIL OF GATE
SCALE 1:100 METERS

500 50
300
200

300 GATE AND BOUNDARY


FENCE
DATE
CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

DETAIL OF FENCE (CORNER)


SCALE 1:100 METERS
APPROVED BY
ENGR. MOHAMMAD ZAYED
SHEET NO
2 OF 3
PAGE NO
03
20
630
100100
80 80 300

210
80

80
80
50

SPOT DETAIL - A SPOT DETAIL - B

PLAN

DETAIL OF HINGE
GATE AND BOUNDARY

SPOT DETAIL - C CONTENTS AS SHOWN


FENCE
DATE
JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 3 OF 3 04
A
SECTION

150T

300T
C C
SECTION SECTION

D
SECTION
300T D
SECTION

F
B B SECTION
SECTION SECTION

E E
SECTION SECTION

BATCH PLANT #1
FOUNDATION PLAN
SCALE 1:100
F
SECTION BATCH PLANT #1
DATE
CONTENTS AS SHOWN JUNE 12, 2023

A DRAWING BY CHECKED BY CHECKED BY


SECTION JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 1 OF 5 05
BATCH PLANT FOUNDATION
LOADING AREA

SECTION THRU A-A


SCALE 1:100

BATCH PLANT #1
DATE
CONTENTS AS SHOWN JUNE 12, 2023

SECTION THRU B-B DRAWING BY


JOHN KARL R. DELA HOSTRIA
CHECKED BY
ENGR. ARCHIE DELA CRUZ
CHECKED BY

SCALE 1:100 APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 2 OF 5 06
SECTION THRU C-C
SCALE 1:100

BATCH PLANT #1

SECTION THRU D-D CONTENTS AS SHOWN


DATE
JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


SCALE 1:100 JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 3 OF 5 07
SECTION THRU E-E
SCALE 1:100

BATCH PLANT #1
SECTION THRU F-F CONTENTS AS SHOWN
DATE
JUNE 12, 2023

SCALE 1:100 DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 4 OF 5 08
150T PLAN
500
85 330 85

105
300T

700
100

D
SECTION
300T D
SECTION SECTION

DETAIL OF ANCHOR BOLT


SCALE 1:25 METERS

SILO FOUNDATION PLAN


SCALE 1:100
DETAIL OF TRENCH
SCALE 1:25 METERS
BATCH PLANT #1
DATE
CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 5 OF 5 09
A
SECTION

150T

300T
C C
SECTION SECTION

D
SECTION
300T D
SECTION

F
SECTION
B B
SECTION SECTION

E E
SECTION SECTION

BATCH PLANT #2
FOUNDATION PLAN BATCH PLANT #2
SCALE 1:100 F DATE
SECTION CONTENTS AS SHOWN JUNE 12, 2023

A DRAWING BY CHECKED BY CHECKED BY


SECTION JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 1 OF 5 10
BATCH PLANT FOUNDATION
LOADING AREA

SECTION THRU A-A


SCALE 1:100

BATCH PLANT #2
DATE
CONTENTS AS SHOWN JUNE 12, 2023

SECTION THRU B-B DRAWING BY


JOHN KARL R. DELA HOSTRIA
CHECKED BY
ENGR. ARCHIE DELA CRUZ
CHECKED BY

SCALE 1:100 APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 2 OF 5 11
SECTION THRU C-C
SCALE 1:100

BATCH PLANT #2

SECTION THRU D-D


DATE
CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ
SCALE 1:100 APPROVED BY SHEET NO PAGE NO
ENGR. MOHAMMAD ZAYED 3 OF 5 12
SECTION THRU E-E
SCALE 1:100

BATCH PLANT #2

SECTION THRU F-F CONTENTS

DRAWING BY
AS SHOWN
CHECKED BY
DATE
JUNE 12, 2023

CHECKED BY

SCALE 1:100
JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 4 OF 5 13
PLAN
150T
500
85 330 85
105

300T
700

100

SECTION D
SECTION
300T D
SECTION

DETAIL OF ANCHOR BOLT


SCALE 1:25 METERS

SILO FOUNDATION PLAN


SCALE 1:100
DETAIL OF TRENCH
SCALE 1:25 METERS

BATCH PLANT #2
DATE
CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 5 OF 5 14
1 3
2 3
ELEV. ELEV.

A
4 2 4 2
ELEV. ELEV.
ELEV. ELEV.

DRIVERS ROOM PORTABLE BATCH


A A A A
SECTION SECTION SECTION CABIN SECTION

1 1
ELEV. ELEV.

DRIVERS ROOM AND BATCH CABIN DRIVERS ROOM AND BATCH CABIN
GROUND FLOOR PLAN SECOND FLOOR PLAN
SCALE 1:100 SCALE 1:100

DRIVERS ROOM
PLAN
DATE
CONTENTS AS SHOWN

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE S. DE LA CRUZ __________________

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 1 of 6 15
1 2 B A

DRIVERS ROOM AND BATCH CABIN DRIVERS ROOM AND BATCH CABIN

FRONT ELEVATION RIGHT SIDE ELVCATION


SCALE 1:100 SCALE 1:100

DRIVERS ROOM
PLAN
DATE
CONTENTS AS SHOWN

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE S. DE LA CRUZ __________________

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 2 0F 6 16
A B 2 1

DRIVERS ROOM AND BATCH CABIN


DRIVERS ROOM AND BATCH CABIN

LEFT SIDE ELEVATION REAR ELEVATION


SCALE 1:100
SCALE 1:100

DRIVERS ROOM
PLAN
DATE
CONTENTS AS SHOWN

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE S. DE LA CRUZ __________________

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 3 0F 6 17
1 2

PORTABLE BATCH
CABIN

DRIVERS ROOM

DRIVERS ROOM AND BATCH CABIN

LONGITUDINAL SECTION
SCALE 1:100

1 2
1 2

A A

B B
DRIVERS ROOM
DRIVERS ROOM AND BATCH CABIN
DRIVERS ROOM AND BATCH CABIN
PLAN
ROOF PLAN REFLECTED CEILING PLAN DATE
SCALE 1:100 CONTENTS AS SHOWN
SCALE 1:100

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE S. DE LA CRUZ __________________

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 4 0F 6 18
1 2

F.F.L

NGL

DRIVERS ROOM AND BATCH CABIN

FOUNDATION PLAN
SCALE 1:100
SECTION

F.F.L
NGL PLAN

DRIVERS ROOM
PLAN
DATE
CONTENTS AS SHOWN

TYPICAL DETAIL OF WF-1


SCALE 1:30 METERS
C-1 DRAWING BY
JOHN KARL R. DELA HOSTRIA
CHECKED BY
ENGR. ARCHIE S. DE LA CRUZ
CHECKED BY
__________________

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 5 0F 6 19
1 2

TOP BARS CONTINUOUS BARS

A
STIRRUPS BOTTOM BARS

B 2 - 16 MM Ø TOP BARS
2 - 12 MM Ø CONT. BARS
2 - 16 MM Ø TOP BARS
2 - 12 MM Ø CONT. BARS
2 - 16 MM Ø BOT. BARS 2 - 16 MM Ø BOT. BARS

@ SUPPORT @ MID-SPAN
DRIVERS ROOM AND BATCH CABIN

ROOF FRAMING PLAN


SCALE 1:100

TYPICAL DETAIL OF RB-1


SCALE 1:30 METERS

DRIVERS ROOM
PLAN
DATE
CONTENTS AS SHOWN

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE S. DE LA CRUZ __________________

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 6 0F 6 20
Trench for Electrical 400mm (W) x 600mm (D)
Covered with Steel Plate and filled with sand
after completely installation of Cable Wires

ICE PLANT FOUNDATION -


RC CONCRETE 600mm THK. WITH 14mm Ø RC CONCRETE WITH 10mmØ WIRE MESH
150mmSPACING BARS BOTHWAYS ON TOP SPACED @ 200mm O.C.
MIDDLE AND BOTTOM
C
TOP FOUNDATION ELVE. + 0.15 TOP FOUNDATION ELVE. + 0.15

SEE EDS ROOM DETAIL

Diesel Tank
Diesel Tank
Gen. #2
Gen. #4

Gen. #1
Gen. #3
Compacted Selected Earthfill 100mm THK . BLINDING

EDS SECTION THRU “A”


ROOM Not To Scale

ELECTRICAL TRENCH 400mm (W) x 600mm (D)


WITH STEEL PALATE COVER AFTER
INSTALLATION OF ELECTRICAL WIRES

ICE PLANT FOUNDATION -


RC CONCRETE WITH 10mmØ WIRE MESH RC CONCRETE WITH 10mmØ WIRE MESH
RC CONCRETE 600mm THK. WITH 14mm Ø

Ice Plant
SPACED @ 200mm O.C. SPACED @ 200mm O.C.
150mmSPACING BARS BOTHWAYS ON TOP
MIDDLE AND BOTTOM

TOP FOUNDATION ELVE. + 0.15


WATER TANK 04

WATER TANK 04
WATER TANK 03

WATER TANK 03
Chiller Plant

B Compacted Selected Earthfill

100mm THK . BLINDING

SECTION THRU “B”


Not To Scale

TRENCH FOR ELECTRICAL 500mm


(W) x 600mm (D) WITH STEEL PLATE
COVER AFTER INSTALLATION OF
CABLE WIRES

A
10mmØ BARS

CONTROL SERVICE FOUNDATION PLAN ELECTRICAL TRENCH DETAIL


Scale 1: 200 m Not To Scale N.T.S.

NOTES: PROJECT TITLE

Concrete Pedestal Base


1) All backfill materials must be compacted
1.0 (H) x 0.60 (W) x 2.40 (L) RM
DIESEL TANK
not less than 95% density or approved by client. Parapet wall blocks DAMMAM PORT PROJECT
plastered both sides Engineering Division
2) Two coats of epoxy bituminous coating material DRAWING TITLE LOCATION
shall be applied to the external surface of concrete CONTROL SERVICE AREA FOUNDATION DAMMAM

contacting soil, excluding bottom surfaces and surfaces DESIGNED BY : ENGR. ARCHIE S. DE LA CRUZ DRAWN BY : ENGR. ALI AL-SAUIB
Elev. + 0.15 CHECKED BY : ENGR. MOHAMMAD ZAYED
REVISION :
of leveling. (Blinding) APPROVED BY :
DATE : 08.12.2022 SCALE: As Shown
3) All bottom surfaces of concrete cast against and CONTENTS
PLAN, DETAILS AND SECTIONS
permanently in contact with ground shall be under laid by
SECTION “C” DRAWING NO. PAGE NO.
polyethylene sheets (Vapour Barrier) as indicate on drawings.
Not To Scale CSF – ST - 01 21
SEE BEAM DETAIL

CHB wall 20x20x40cm


With fair face & proper pointing finish
6 - 14 mm Ø VERTICAL BARS

RC Column (SEE DETAILl)

Corrugated Sheet with Roof 10 mmØ bars Stirrups 5 @ 80mm rest @


150mm O.C. Spacing

Insulation
150mm thk. Slab on grade with Rafter 5 nos. @ equal spacing

MPB

MPB
10mmx200x200 wire mesh EDS ROOM
I-Beam 100x50mm Finished Slab on Grade Final Level of Control Service

MPB COLUMN ELEVATION DETAIL


SCALE: N. T. S.
Purlins 100mm x 50mm
Rectangular Pipe

Roof Line
Cable Trench See Details
Fabricated Steel Plate
10mm Thick with Handle
FLOOR PLAN ROOF FRAMING PLAN
1 : 100 m SCALE 1 : 100 m
SCALE

Steel Louver Door (Double Swing)


TRENCH DETAIL
Corrugated Roof Sheet SCALE NTS
Corrugated Roof Sheet With roof insulation Lintel beam 200mm x 200mm
Lintel beams 200mm x 200mm
With roof insulation

CHB Wall 20x40x20 cm thk.


RC Columns 6 - 14mm DIA. MAIN REBAR WITH 10mm
Plastered both side
CHB wall 20x20x40cm DIA. STIRRUPS @ 200mm PACING
Plastered both side

TYPICAL COLUMN DETAIL


RC Columns SCALE N. T. S.

FFL FINAL LEVEL OF TOP OF CONTORL SERVICE FFL Final Level of Top of Control Service

FRONT ELEVATION RIGHT SIDE ELEVATION 4 - 14mm DIA. MAIN REBAR WITH 10mm
DIA. STIRRUPS @ 200mm PACING
SCALE N.T.S. N.T.S.
SCALE

TYPICAL BEAM DETAIL


SCALE N. T. S.

PROJECT TITLE
CORRUGATED ROOF SHEET CORRUGATED ROOF SHEET
WITH ROOF INSULATION WITH ROOF INSULATION LINTEL BEAMS 200mm x 200mm

LINTEL BEAMS 200mm x 200mm


WINDOW TYPE AIRCON UNIT
RM

DAMMAM PORT PROJECT


CHB WALL 20x20x40 cm
DOWN SPOUT 3"Ø PVC PIPE PLA STERED BOTH SIDE
Engineering Division
CHB WALL 20x20x40 cm
PLA STERED BOTH SIDE DRAWING TITLE LOCATION
CONTROL SERVICE AREA (EDS ROOM) DAMMAM
RC COLUMNS RC COLUMNS
RC Columns
DESIGNED BY : ENGR. ALI AL-SAUIB DRAWN BY : ENGR. ALI AL-SAUIB
CHECKED BY : ENGR. ARCHIE S. DE LA CRUZ
Final Level of Top of Control Service
FFL
APPROVED BY : ENGR. MOHAMMAD ZAYED REVISION :
FFL Final Level of Top of Control Service
DATE : 08.12.2022 SCALE: As Shown
CONTENTS
ELEVATION, SECTION AND DETAILS
DRAWING NO. PAGE NO.
REAR ELEVATION LEFT SIDE ELEVATION
N.T.S. CSF – ST - 02 22
SCALE SCALE N.T.S.
1 2 3

Y
XX-XXX

ADMIXTURE TANK CONFINEMENT 2


AREA FE-300

X
XX-XXX

1
FE-300 ADMIXTURE TANK

DATE
CONTENTS AS SHOWN JUNE 12, 2023

ADMIXTURE TANK CONFINEMENT PLAN DRAWING BY


JOHN KARL R. DELA HOSTRIA
CHECKED BY
ENGR. ARCHIE DELA CRUZ
CHECKED BY

SCALE 1:100 APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 1 of 6 23
1 2 3 A B

APEX OF ROOF APEX OF ROOF


EL+6.57 M EL+6.57 M

BOT. OF STEEL BEAM BOT. OF STEEL BEAM


EL+5.42 M EL+5.42 M

TOP OF PEDESTAL WALL TOP OF PEDESTAL WALL


EL+1.65M EL+1.65M

FINISH FLOOR LINE FINISH FLOOR LINE


EL+0.65 M EL+0.65 M

NATURAL GRADE LINE NATURAL GRADE LINE


EL+0.00 M EL+0.00 M

ELEVATION - 01 ELEVATION - 02
SCALE 1:100 SCALE 1:100

1 2 3 A B

APEX OF ROOF APEX OF ROOF


EL+6.57 M EL+6.57 M

BOT. OF STEEL BEAM BOT. OF STEEL BEAM


EL+5.42 M EL+5.42 M

TOP OF PEDESTAL WALL TOP OF PEDESTAL WALL


EL+1.65M EL+1.65M

FINISH FLOOR LINE FINISH FLOOR LINE


EL+0.65 M EL+0.65 M

NATURAL GRADE LINE NATURAL GRADE LINE


EL+0.00 M EL+0.00 M

ADMIXTURE TANK

DATE
SECTION THRU - Y CONTENTS AS SHOWN JUNE 12, 2023
SECTION THRU - X SCALE 1:100
SCALE 1:100 DRAWING BY CHECKED BY CHECKED BY
JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 2 of 6 24
1 2 3 1 2 3

A A

B B

ROOF PLAN ROOF FRAMING PLAN


SCALE 1:100 SCALE 1:100

ADMIXTURE TANK

DATE
CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 3 of 6 25
0 0 100
1 100
0 309
3 095 100 0 5
0 100
100 0
850
850

880
1365

420 1420 1420


5850

ADMIXTURE TANK

DETAIL OF ROOF TRUSS


DATE
CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


SCALE: NTS JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 4 of 6 26
1 2 3

170

200

B B

FOUNDATION PLAN DETAIL CONNECTION OF PLATE AND POST


SCALE 1:100
200

100

35 130 35
200
100
30 140 30
SECTION THRU - B

PLAN ADMIXTURE TANK


SECTION THRU - A
DATE
CONTENTS AS SHOWN
DETAIL OF C.HB AND FOOTING
JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


SCALE: NTS JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 5 of 6 27
PLAN

SECTION
SECTION

DETAIL OF WALL FOOTING AND COLUMN ADMIXTURE TANK

DATE
SCALE: NTS CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 6 of 6 28
Y
XX-XXX

X SECTION THRU - X
XX-XXX

PLAN
MUD SETTLING TANK
SECTION THRU - Y
DATE
CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 1 of 1 29
Y1'
FX-400

SETTLING TANK
X1' X1
FX-400 FX-400

WASTE DUMPING
AREA

A
A/300

TRUCKWASHING AND WASTE DUMPING AREA PLAN TRUCKWASHING AND


SCALE 1:100
WASTE DUMPING AREA
DATE
CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 1 of 3 30
WASTE DUMPING AREA

SETTLING TANK

TRUCKWASHING AND DUMPING AREA

SECTION THRU A - A
SCALE 1:100

TRUCK WASHING AREA

SETTLING TANK SETTLING TANK

TRUCKWASHING AND
WASTE DUMPING AREA
DATE
CONTENTS AS SHOWN JUNE 12, 2023
TRUCKWASHING AND DUMPING AREA

SECTION THRU B - B DRAWING BY


JOHN KARL R. DELA HOSTRIA
CHECKED BY
ENGR. ARCHIE DELA CRUZ
CHECKED BY

SCALE 1:100
APPROVED BY SHEET NO PAGE NO
ENGR. MOHAMMAD ZAYED 2 of 3 31
300

300

2500

3000

3000

3000
3150
4500
WASTE DUMPING AREA
WASTE DUMPING AREA

250

100
2000

150
300 500 250

500100
1250
SETTLING TANK

1600
1500

600
500 350 350

900
800

300
250
1000
1200

15300

11000 4000 300

2000 6000 300 4700 4000


150 500
650

700

100
2000
SETTLING TANK

1250
1600

1600
1000

1500
500
11085

250
4800

TRUCKWASHING AND
WASTE DUMPING AREA
DETAIL OF TRUCKWASHING AREA AND WASTE DUMPING AREA
SCALE: NTS DATE
CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 3 of 3 32
STEEL RAILINGS
4.0000 1.0000 18.0500 1.0000 4.0000

4.0000 4.0000

WEIGHBRIDGE PLAN
SCALE NTS

5.0000 18.0520 5.0000

4.0000 1.0000 0.1000 5.9500 5.9500 5.9500 0.1000 1.0000 4.0000


WEIGHBRIDGE STRUCTURE
R.C. RAMP (SEE DETAIL) WITH 10mmØ bars STEEL RAILINGS 2- / PIPE WITH
1
2 R.C. RAMP (SEE DETAIL) WITH 10mmØ bars
INSTALLED BY WEIGHBRIDGE R.C. FOUNDATION (SEE DETAIL) R.C. SLAB ON GRADE 0.15m
2-layer spaced @200mm O.C. COLOR YELLOW AND BLACK 2-layer spaced @200mm O.C.
SUPPLIER 4m (L) x 1.5m (W) x 0.60m (H) THICK WITH STEEL WIRE MESH
NOTE : TO BE CONCRETED AFTER NOTE : TO BE CONCRETED AFTER
ISTALLATION OF WEIGHBRIDGE ISTALLATION OF WEIGHBRIDGE
STRUCTURE STRUCTURE

0.6000 0.4500
SLAB ON GRADE ELEVATION SLAB ON GRADE ELEVATION
0.1500
0.3500 0.6000
Concrete Blinding 50mm thick.
COMPACTED SOIL
1.5000 1.5000 1.5000 1.5000
COMPACTED SOIL COMPACTED SOIL

SECTION THRU - A
SCALE NTS

4.0000
4.0000 1.0000 A
10mm Ø BARS 2-LAYER SPACED @ 200mm 100 x 100 x 5mm THICK ANGLE BAR AT
O.C. BOTH WAYS CORNER EDGE

RC FOUNDATION 1.5000

SLAB ON GRADE EL. +0.15


0.7000
PLAN DRAWING TITLE

NOTE : TO BE CONCRETED AFTER 10mm Ø


ISTALLATION OF WEIGHBRIDGE STIRRUPS 14 - 16mm Ø
SPACED @ HORIZONTAL
STRUCTURE 200mm BARS WEIGHBRIDGE FOUNDATION AND RAMP
O.C
SLAB GRADE ELEVATION

DATE

RC RAMP DETAIL PLAN & SECTION & DETAILS


CONTENTS
15/01/2023

DRAWING BY CHECKED BY CHECKED BY

SCALE NTS SECTION - B ENGR. ARCHIE S. DE LA CRUZ ENGR. MOHAMMAD ZAYED __________________

RC FOUNDATION DETAIL APPROVED BY SCALE PAGE NO


SCALE NTS 1:100 33
1 2 3 4 5 6 7 8 9 10 11

3
FE-300

Y Y1
COL.SEC. WALL SEC

4 2
FE-300
BAY - 01 BAY - 02 BAY - 03 BAY - 04 BAY - 05 FE-300

B X
COL. SEC

A A
SEC. SEC.

X1
WALL SEC

1
FE-300

AGGREGATE STOCKBAY PLAN


SCALE 1:100 MTS.

AGGREGATE STOCKBAY

DATE
CONTENTS PLAN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 1 of 9 34
1 2 3 4 5 6 7 8 9 10 11
A B C

BAY - 01 BAY - 02 BAY - 03 BAY - 04 BAY - 05

AGGREGATE STOCKBAY PLAN AGGREGATE STOCKBAY PLAN


FRONT ELEVATION LEFT SIDE ELEVATION
SCALE 1:100 MTS. SCALE 1:100 MTS.

11 10 9 8 7 6 5 4 3 2 1
C B A

AGGREGATE STOCKBAY PLAN AGGREGATE STOCKBAY PLAN


REAR ELEVATION RIGHT SIDE ELEVATION
SCALE 1:100 MTS. SCALE 1:100 MTS.

AGGREGATE STOCKBAY

DATE
CONTENTS ELEVATIONS JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 2 of 9 35
1 2 3 4 5 6 7 8 9 10 11

BAY - 01 BAY - 02 BAY - 03 BAY - 04 BAY - 05

AGGREGATE STOCKBAY PLAN


SECTION THRU A - A
SCALE 1:100 MTS.

1 3 5 7 9 11

BAY - 01 BAY - 02 BAY - 03 BAY - 04 BAY - 05

AGGREGATE STOCKBAY PLAN


SECTION ALONG GRID - C
SCALE 1:100 MTS.

AGGREGATE STOCKBAY

DATE
CONTENTS SECTIONS JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 3 of 9 36
A B C A B C

SLAB ON GRADE SLOPE 1.5% SLAB ON GRADE SLOPE 1.5%

AGGREGATE STOCKBAY PLAN AGGREGATE STOCKBAY PLAN


TYPICAL SECTION ALONG GRID 3,5,7 & 9 TYPICAL SECTION ALONG GRID 1 AND 11
SCALE 1:100 MTS. SCALE 1:100 MTS.

A B C

SLAB ON GRADE SLOPE 1.5%

AGGREGATE STOCKBAY

DATE
AGGREGATE STOCKBAY PLAN CONTENTS SECTIONS JUNE 12, 2023

TYPICAL SECTION ALONG GRID 2,4,6,8 & 10 DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ
SCALE 1:100 MTS.

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 4 of 9 37
1 2 3 4 5 6 7 8 9 10 11

3
FE-300

4 2
FE-300 FE-300

SLOPE DOWN SLOPE DOWN

1
FE-300

AGGREGATE STOCKBAY ROOF PLAN


SCALE 1:100 MTS.

AGGREGATE STOCKBAY

DATE
CONTENTS ROOF PLAN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 5 of 9 38
1 2 3 4 5 6 7 8 9 10 11

RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1
A
PURLINS PURLINS PURLINS PURLINS PURLINS
RT-1

RT-1

RT-1

RT-1

RT-1

RT-1

RT-1

RT-1

RT-1

RT-1

RT-1
B PURLINS PURLINS PURLINS PURLINS PURLINS
RT-1

RT-1

RT-1

RT-1

RT-1

RT-1

RT-1

RT-1

RT-1

RT-1

RT-1
PURLINS PURLINS PURLINS PURLINS PURLINS

C RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1

AGGREGATE STOCKBAY
ROOF FRAMING PLAN
SCALE 1:100 MTS.

AGGREGATE STOCKBAY

CONTENTS ROOF FRAMING DATE


PLAN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 6 of 9 39
GRID GRID GRID GRID GRID

VARIES VARIES VARIES VARIES


( LENGTH/SPAN ) ( LENGTH/SPAN ) ( LENGTH/SPAN ) ( LENGTH/SPAN )

SECTION THRU - W
TYPICAL WALL FRAMING DETAILS
SCALE 1:50 METERS

GRID GRID GRID

12000
1000 1000
1000 1000
1000 1000
1000 1000
1000 1000
1000 1000

AGGREGATE STOCKBAY

DATE
CONTENTS AS SHOWN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 7 of 9 40
1 2 3 4 5 6 7 8 9 10 11

B BAY - 01 BAY - 02 BAY - 03 BAY - 04 BAY - 05

SLAB ON GRADE SLOPE 1.5% SLAB ON GRADE SLOPE 1.5% SLAB ON GRADE SLOPE 1.5% SLAB ON GRADE SLOPE 1.5% SLAB ON GRADE SLOPE 1.5%

AGGREGATE STOCKBAY
FOUNDATION PLAN
SCALE 1:100 MTS.

AGGREGATE STOCKBAY

DATE
CONTENTS FOUNDATION PLAN JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 8 of 9 41
300
(COLUMN)
400 300
400 300 (BASE PLATE)
300
150
150 (STEEL COLUMN)
U V

(STEEL COLUMN)
(BASE PLATE)

75 150 75
75 150 75

(COLUMN)
400
300
300

300

300

300
75 150 75
75 150 75

PLAN PLAN

4000
4000

4600
4600

400 300
300

100

100
400 200
400200

700

700
600

600
(HEIGHT VARIES)

(HEIGHT VARIES)
1200

0
0

10
10
1200

COLUMN SECTION THRU - Y COLUMN SECTION THRU - X

300
400

SECTION THRU-U SECTION THRU-V

ANCHOR BOLT DETAIL CONNECTION


300
4000
4000

4600
4600

150
300

150
400 200

600
400 200

1200
1200
WATER TRENCH DETAIL
SCALE 1:25 METERS

WALL SECTION THRU - Y1 WALL SECTION THRU - X1 AGGREGATE STOCKBAY

DATE
PLAN
DETAIL OF R.C WALL AND RCC COLUMN
CONTENTS
JUNE 12, 2023

DRAWING BY CHECKED BY CHECKED BY


JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ

APPROVED BY SHEET NO PAGE NO


ENGR. MOHAMMAD ZAYED 9 of 9 42
GENERAL NOTES:
1. ALL SITE DIMENSIONS ARE MEASURED IN MILLIMETERS UNLESS STATED OTHERWISE.
2. INDIVIDUAL BUILDING DIMENSIONS & DETAILS ARE MEASURED IN MILLIMETERS
UNLESS STATED
OTHERWISE.
3. ALL ELEVATION DIMENSIONS AND LEVELS ARE MEASURED IN MILLIMETERS UNLESS
STATED OTHERWISE.
4. ALL MEASUREMENTS ARE SUBJECT FOR SITE VERIFICATION.
5. ALL FACILITIES SHOWN IN THIS PLAN ARE IN COMPLIANCE TO THE REQUIREMENT OF
THE PRODUCTION
DEPARTMENT. ANY CHANGES OR REVISIONS SHOULD BE DONE BY THE ISSUING DEPARTMENT
WITH THE APPROPRIATE
REMARKS AND NOTES FROM THE RESPECTIVE APPROVING COMMITTEE. REVISIONS ARE TO
BE DONE ONLY AFTER
REMARKS ARE RECEIVED.

W E

A-A
SEC.

UNDERGROUND
SCALE
SEPTIC
1:100
TANK PLAN
METERS

DRAWING TITLE:
SEPTIC TANK
25000 LITERS

UNDERGROUND SEPTIC TANK

DATE
CONTENTS AS SHOWN DECEMBER 14, 2022

UNDERGROUND SEPTIC TANK TYP. SECTION DRAWING BY


JKRDH
CHECKED BY
ENGR. ARCHIE S. DE LA CRUZ
CHECKED BY
__________________
SCALE 1:100 METERS
APPROVED BY SHEET NO PAGE NO
ENGR. MOHAMMAD ZAYED 1 OF 1 43
4.10m.

3.50
0.30 0.30
0.30

Water Passage

300mm THK. CONCRETE SLAB


WITH 12mm DIA. @ 150mm
SPACING BOTHWAYS (2 LAYERS)
12mm dia. Horizontal bars @
A
1.70

RC Wall 300mm 150mm spacing

F.F.L. F.F.L.
14mm dia. Vertical bars
@ 150mm spacing
5.80m.

Plain concrete blinding 100mm thick 300mm thk. Concrete slab With12mm dia. @
150mm Spacing bothways (2 Layers)
3.80

SECTION THRU - A
SCALE 1:75 MTS

B
PLAN
SCALE 1: 75 MTS

10mm DIA.
HORIZONTAL BARS @
150mm SPACING
F.F.L. F.F.L.
N.G.L. N.G.L.

DRAWING TITLE

12mm DIA.
HORIZONTAL BARS @ CONCRETE WASTE TANK LAYOUT
150mm SPACING
DATE
PLAIN CONCRETE BLINDING CONTENTS PLAN, SECTION A & SECTION B
08/12/2022

DRAWING BY CHECKED BY CHECKED BY

SECTION THRU - B ENGR. ALI ALSAUIB ENGR. ARCHIE S. DE LA CRUZ __________________

SCALE 1:75 MTS APPROVED BY


ENGR. MOHAMMAD ZAYED
SHEET NO
1 OF 1
PAGE NO
44
GENERAL NOTES:
1. ALL SITE DIMENSIONS ARE MEASURED IN MILLIMETERS UNLESS STATED OTHERWISE.
2. INDIVIDUAL BUILDING DIMENSIONS & DETAILS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.

THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT WRITTEN AUTHORIZATION FROM THE CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT OF SAUDI READYMIX CONCRETE CO. LTD.
3. ALL ELEVATION DIMENSIONS AND LEVELS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
4. ALL MEASUREMENTS ARE SUBJECT FOR SITE VERIFICATION.

5. ALL FACILITIES SHOWN IN THIS PLAN ARE IN COMPLIANCE TO THE REQUIREMENT OF THE
PRODUCTION
DEPARTMENT. ANY CHANGES OR REVISIONS SHOULD BE DONE BY THE ISSUING DEPARTMENT WITH THE
APPROPRIATE
REMARKS AND NOTES FROM THE RESPECTIVE APPROVING COMMITTEE. REVISIONS ARE TO BE DONE
ONLY AFTER
REMARKS ARE RECEIVED.

KEY PLAN:
N

ADMIXTURE W E

BAY - 05
SILO FOUNDATION TANK

E
300T 300T S

SEPTIC

PLANT #02
TANK
TOTAL AREA = (+/-) 10,000.00 M2

150T
TOTAL PERIMETER FENCE = (+/-) 400.00 LM

BATCH
LEGEND:

TOILET
LABOR
MSB02
D

BAY - 04
E
PVC CONDUIT LINES

PVC CONDUIT LINES

MUD SETTLING
BATCH EXCAVATION AND BACKFILLING LINES
A

TANK
CABIN
FOR BP#02 Batch Control Panel

AGGREGATE STOCK BAY


SINK
OPEN SHELF STEEL UNDER CABINET

1 Set -3 x 70mm² + 35mm² MH01 E


LABORATORY FOR BP#02 Mixer Panel MP03 ELECTRICAL MANHOLE
1 Set -3 x 95mm² + 50mm²
CURING TANK

CURING TANK
CURING ROOM

PORTABLE
LABORATORY

Cu / PVC Sheathed / XLPE / STA

BAY - 03
O

PANEL BOARD
CONC. PAD

DIESEL TANK
01
WATER TANK 04 E
SAMPLE AREA

EARTHING
FOR LABORATORY
OFFICE

DIESEL TANK
1 Sets -3 x 25mm² + 16mm² 02
E Cu / PVC Sheathed / XLPE / STA
R

WATER TANK 03
CONCRETE

MH05
WASTE
AREA

GENERATOR

CONTROL SERVICE AREA


01 E
FOR GENERATOR 1, 2, 3, & 4
28 Sets - 1 x 300mm²

GROUND
HOOPER

BAY - 02
Cu / PVC Sheathed / XLPE / STA
GENERATOR
02 E
OFFICE PORTABLE

ICE PLANT
FOR ICE PLANT
2 Sets - 3 x 150mm² + 70mm²
GENERATOR E
Cu / PVC Sheathed / XLPE / STA

GROUND
HOOPER
03 E CHILLER PLANT

MP02
FOR CHILLER PLANT E
2 Sets -3 x 120mm² + 70mm² GENERATOR
S

Cu / PVC Sheathed / XLPE / STA 04 E

BAY - 01
WATER TANK 02
FOR LABORATORY AND OFFICE BUILDING
2 Sets -3 x 50mm² + 25mm² EDS
ROOM
OFFICE PORTABLE
S

Cu / PVC Sheathed / XLPE / STA E


WATER TANK 01 FOR AGGREGATE STOCK BAY
1 Sets -3 x 25mm² + 16mm²
FOR BP#01 Batch Control Panel Cu / PVC Sheathed / XLPE / STA
1 Set -3 x 70mm² + 35mm²
FOR BP#01 Mixer Panel
E

1 Set -3 x 95mm² + 50mm²

MUD SETTLING
E
Cu / PVC Sheathed / XLPE / STA

DOCUMENT DISCLAIMER:
TANK
PLANT #01

E BATCH
MP04
MH03 MH02 CABIN
C

MP01
MH04 E
BATCH

MH07
FOR TRUCK WASHING
1 Set -4 x 16mm²
MSB01 Cu / PVC Sheathed / XLPE / STA 3
2
C

E
1
REVISION NO.: REVISED BY.: REVISION DATE:

AND DUMPING AREA


FOR TRUCK WASHING
REVISIONS

TRUCK WASHING
1 Set -4 x 16mm²
150T

Cu / PVC Sheathed / XLPE / STA


A

300T 300T
SETTLING TANK
E

MH06 SILO FOUNDATION ADMIXTURE E


GUARD

D:\ARCHIE FILES; RM STANDARD PROJECT - SITE DEVELOPMENT PLAN


TANK

WASTE DUMPING
HOUSE/
MRR
MAIN ENTRANCE /

AREA
DRAWING TITLE:
EXIT GATE

WEIGHBRIDGE RM
ON-SITE PROJECT
LOCATION: DAMMAM, KINGDON OF SAUDI ARABIA
DRAWING TITLE:
MAIN ELECTRICAL
DISTRIBUTION LAYOUT
SCALE: 1 : 100 UNIT: METERS
CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT
ARCHITECTURAL & INTERIOR DESIGN WORKS:
DESIGNED BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023

REFERENCE FILE LINK:


AUTOCAD BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023

MAIN ELECTRICAL DISTRIBUTION LAYOUT


CHECKED BY: ENGR. MOHAMMAD ZAYED DATE: 11-JUN-2023
CHECKED BY: ENGR. ASHRAF YOUSEF DATE: 11-JUN-2023
DRAWING NO.: PAGE NO.: FINAL APPROVAL:

RM__-AD-SDP
45 DATE:
CHIEF OPERATION OFFICER
GENERAL NOTES:
1. ALL SITE DIMENSIONS ARE MEASURED IN MILLIMETERS UNLESS STATED OTHERWISE.
2. INDIVIDUAL BUILDING DIMENSIONS & DETAILS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.

THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT WRITTEN AUTHORIZATION FROM THE CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT OF SAUDI READYMIX CONCRETE CO. LTD.
3. ALL ELEVATION DIMENSIONS AND LEVELS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
4. ALL MEASUREMENTS ARE SUBJECT FOR SITE VERIFICATION.

5. ALL FACILITIES SHOWN IN THIS PLAN ARE IN COMPLIANCE TO THE REQUIREMENT OF THE
PRODUCTION
DEPARTMENT. ANY CHANGES OR REVISIONS SHOULD BE DONE BY THE ISSUING DEPARTMENT WITH THE
APPROPRIATE
REMARKS AND NOTES FROM THE RESPECTIVE APPROVING COMMITTEE. REVISIONS ARE TO BE DONE
ONLY AFTER
REMARKS ARE RECEIVED.

N
KEY PLAN:
E

W
S

ADMIXTURE

BAY - 05
SILO FOUNDATION TANK

E
300T 300T
TOTAL AREA = (+/-) 10,000.00 M2

SEPTIC

PLANT #02
TANK
TOTAL PERIMETER FENCE = (+/-) 400.00 LM

150T
BATCH
LEGEND:

PVC CONDUIT LINES

TOILET
LABOR
MSB02
D

BAY - 04
E

PVC CONDUIT LINES

EXCAVATION AND BACKFILLING LINES

MUD SETTLING
BATCH
A

TANK
CABIN

AGGREGATE STOCK BAY


SINK

ELECTRICAL MANHOLE
OPEN SHELF STEEL UNDER CABINET

MH01 E
MP03

LABORATORY
CURING TANK

CURING TANK
CURING ROOM

PORTABLE
LABORATORY

PANEL BOARD

BAY - 03
O

CONC. PAD

EXCAVATION AND
DIESEL TANK
01
BACKFILLING
WATER TANK 04 E
SAMPLE AREA

EARTHING
OFFICE

DIESEL TANK
02
E
R

WATER TANK 03
CONCRETE

MH05
WASTE
AREA

GENERATOR

CONTROL SERVICE AREA


01 E

GROUND
HOOPER

BAY - 02
1-SET - 4" SCH. 40 PVC CONDUIT PIPE
1-SET - 2" SCH. 40 PVC CONDUIT PIPE GENERATOR
02 E
OFFICE PORTABLE

ICE PLANT

GENERATOR E

GROUND
HOOPER
1-SET - 2" SCH. 40 PVC CONDUIT PIPE 03 E CHILLER PLANT

MP02
E
GENERATOR
S

04 E

BAY - 01
WATER TANK 02
1-SET - 4" SCH. 40 PVC CONDUIT PIPE
EDS
1-SET - 2" SCH. 40 PVC CONDUIT PIPE ROOM
OFFICE PORTABLE
S

E
WATER TANK 01
EXCAVATION AND
BACKFILLING
1-SET - 6" SCH. 40 PVC CONDUIT PIPE
1-SET - 4" SCH. 40 PVC CONDUIT PIPE
1-SET - 2" SCH. 40 PVC CONDUIT PIPE
E

MUD SETTLING
E

DOCUMENT DISCLAIMER:
TANK
PLANT #01

E BATCH
MP04
MH03 MH02 CABIN
C

MP01
MH04 E
BATCH

EXCAVATION AND
BACKFILLING
MSB01 3
C

E 2
1
REVISION NO.: REVISED BY.: REVISION DATE:

AND DUMPING AREA


REVISIONS

TRUCK WASHING
1-SET - 4" SCH. 40 PVC CONDUIT PIPE
150T

1-SET - 2" SCH. 40 PVC CONDUIT PIPE


A

300T 300T
SETTLING TANK
E
1-SET - 2" SCH. 40
MH06 PVC CONDUIT PIPE
SILO FOUNDATION ADMIXTURE E
GUARD TANK

D:\ARCHIE FILES; RM STANDARD PROJECT - SITE DEVELOPMENT PLAN


WASTE DUMPING
HOUSE/
MRR
MAIN ENTRANCE /

AREA
DRAWING TITLE:
EXIT GATE

WEIGHBRIDGE RM
ON-SITE PROJECT
LOCATION: DAMMAM, KINGDON OF SAUDI ARABIA
DRAWING TITLE:
MAIN ELECTRICAL AND
NETWORKING CONDUIT LAYOUT
SCALE: 1 : 100 UNIT: METERS
CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT
ARCHITECTURAL & INTERIOR DESIGN WORKS:
DESIGNED BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023

REFERENCE FILE LINK:


MAIN ELECTRICAL AND NETWORKING CONDUIT LAYOUT
AUTOCAD BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023
CHECKED BY: ENGR. MOHAMMAD ZAYED DATE: 11-JUN-2023
CHECKED BY: ENGR. ASHRAF YOUSEF DATE: 11-JUN-2023
DRAWING NO.: PAGE NO.: FINAL APPROVAL:

RM__-AD-SDP
46 CHIEF OPERATION OFFICER
DATE:
GENERAL NOTES:
1. ALL SITE DIMENSIONS ARE MEASURED IN MILLIMETERS UNLESS STATED OTHERWISE.
2. INDIVIDUAL BUILDING DIMENSIONS & DETAILS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.

THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT WRITTEN AUTHORIZATION FROM THE CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT OF SAUDI READYMIX CONCRETE CO. LTD.
3. ALL ELEVATION DIMENSIONS AND LEVELS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
4. ALL MEASUREMENTS ARE SUBJECT FOR SITE VERIFICATION.

5. ALL FACILITIES SHOWN IN THIS PLAN ARE IN COMPLIANCE TO THE REQUIREMENT OF THE
PRODUCTION
DEPARTMENT. ANY CHANGES OR REVISIONS SHOULD BE DONE BY THE ISSUING DEPARTMENT WITH THE
APPROPRIATE
REMARKS AND NOTES FROM THE RESPECTIVE APPROVING COMMITTEE. REVISIONS ARE TO BE DONE
ONLY AFTER
REMARKS ARE RECEIVED.

N
KEY PLAN:
E

W
ADMIXTURE

BAY - 05
S
SILO FOUNDATION TANK

300T 300T

SEPTIC

PLANT #02
TANK

150T
TOTAL AREA = (+/-) 10,000.00 M2

BATCH
TOTAL PERIMETER FENCE = (+/-) 400.00 LM

LEGEND:

TOILET
LABOR

BAY - 04
D

PVC CONDUIT LINES

PVC CONDUIT LINES

MUD SETTLING
BATCH
A

1-3" G.I. PIPE

TANK
CABIN EXCAVATION AND BACKFILLING LINES

AGGREGATE STOCK BAY


SINK
OPEN SHELF STEEL UNDER CABINET

LABORATORY
CURING TANK

CURING TANK
CURING ROOM

PORTABLE
ELECTRICAL MANHOLE
LABORATORY

BAY - 03
O

CONC. PAD

EXCAVATION AND
DIESEL TANK
01
BACKFILLING
WATER TANK 04
PANEL BOARD
SAMPLE AREA
OFFICE

DIESEL TANK
02 1-3" G.I. PIPE E EARTHING
R

WATER TANK 03
CONCRETE
WASTE
AREA

GENERATOR

CONTROL SERVICE AREA


01

GROUND
HOOPER

BAY - 02
1-2" G.I. PIPE
GENERATOR
02
OFFICE PORTABLE

ICE PLANT

GENERATOR

GROUND
HOOPER
1-3" G.I. PIPE 03
CHILLER PLANT
1-2" G.I. PIPE

GENERATOR
S

04

BAY - 01
WATER TANK 02 1-6" G.I. PIPE

EDS
ROOM
OFFICE PORTABLE
S

WATER TANK 01
1-3" G.I. PIPE

1-3" G.I. PIPE


E

MUD SETTLING
1-3" G.I. PIPE

DOCUMENT DISCLAIMER:
TANK
PLANT #01

BATCH
CABIN
C

BATCH

3
C

2
1
REVISION NO.: REVISED BY.: REVISION DATE:

AND DUMPING AREA


REVISIONS

TRUCK WASHING
150T
A

300T 300T
SETTLING TANK

SILO FOUNDATION ADMIXTURE


GUARD

D:\ARCHIE FILES; RM STANDARD PROJECT - SITE DEVELOPMENT PLAN


TANK

WASTE DUMPING
HOUSE/
MRR
MAIN ENTRANCE /

AREA
DRAWING TITLE:
EXIT GATE

WEIGHBRIDGE RM
ON-SITE PROJECT
LOCATION: DAMMAM, KINGDON OF SAUDI ARABIA
DRAWING TITLE:

MAIN PLUMBING LINE LAYOUT


SCALE: 1 : 100 UNIT: METERS
CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT
ARCHITECTURAL & INTERIOR DESIGN WORKS:
DESIGNED BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023

REFERENCE FILE LINK:


AUTOCAD BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023
CHECKED BY: ENGR. MOHAMMAD ZAYED DATE: 11-JUN-2023

MAIN PLUMBING LINE LAYOUT


CHECKED BY: ENGR. ASHRAF YOUSEF DATE: 11-JUN-2023
DRAWING NO.: PAGE NO.: FINAL APPROVAL:

RM__-AD-SDP
47 CHIEF OPERATION OFFICER
DATE:
GENERAL NOTES:
1. ALL SITE DIMENSIONS ARE MEASURED IN MILLIMETERS UNLESS STATED OTHERWISE.
2. INDIVIDUAL BUILDING DIMENSIONS & DETAILS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.

THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT WRITTEN AUTHORIZATION FROM THE CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT OF SAUDI READYMIX CONCRETE CO. LTD.
3. ALL ELEVATION DIMENSIONS AND LEVELS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
4. ALL MEASUREMENTS ARE SUBJECT FOR SITE VERIFICATION.

5. ALL FACILITIES SHOWN IN THIS PLAN ARE IN COMPLIANCE TO THE REQUIREMENT OF THE
PRODUCTION
DEPARTMENT. ANY CHANGES OR REVISIONS SHOULD BE DONE BY THE ISSUING DEPARTMENT WITH THE
APPROPRIATE
REMARKS AND NOTES FROM THE RESPECTIVE APPROVING COMMITTEE. REVISIONS ARE TO BE DONE
ONLY AFTER
REMARKS ARE RECEIVED.

N
KEY PLAN:
E

W
Heavy duty
Manhole Cover S

Finished Slab on
Grade level

TOTAL AREA = (+/-) 10,000.00 M2


PVC Conduit pipe TOTAL PERIMETER FENCE = (+/-) 400.00 LM
sleeve
LEGEND:
Concrete Hollow Blocks
200mm thk., filled with
PVC CONDUIT LINES
A mortar, with 10mm dia. vert.
dowel and 10mm dia. Ring
and Plastered Inside Wall PVC CONDUIT LINES

EXCAVATION AND BACKFILLING LINES

PVC Conduit pipe


Concrete
Base
sleeve ELECTRICAL MANHOLE

Heavy duty PANEL BOARD


Manhole cover
Filled with fined
Sand
Concrete Manhole E EARTHING
Wall

MANHOLE DETAIL (MH) SECTION "A"


SCALE NTS NTS

Trench for Electrical 400mm (W) x 600mm (D)


Covered by 6mm thick Steel Plate with Angle Bar Framing

DOCUMENT DISCLAIMER:
F.F.L.
10mmØ Bars

F.F.L.
Underground Electrical 3
2
Wires Or Water Lines 1
EL 0.00 REVISION NO.: REVISED BY.: REVISION DATE:
REVISIONS

D:\ARCHIE FILES; RM STANDARD PROJECT - SITE DEVELOPMENT PLAN


SECTION
NTS DRAWING TITLE:

RM
ELICTRICAL LINE DETAIL(EXCAVATION AND BACKFILL) ELECTRICAL TRENCHES
SCALE NTS SCALE 1:25
ON-SITE PROJECT
LOCATION: DAMMAM, KINGDON OF SAUDI ARABIA
DRAWING TITLE:

AS SHOWN
SCALE: 1 : 100 UNIT: METERS
CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT
ARCHITECTURAL & INTERIOR DESIGN WORKS:
DESIGNED BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023

REFERENCE FILE LINK:


AUTOCAD BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023
CHECKED BY: ENGR. MOHAMMAD ZAYED DATE: 11-JUN-2023
CHECKED BY: ENGR. ASHRAF YOUSEF DATE: 11-JUN-2023
DRAWING NO.: PAGE NO.: FINAL APPROVAL:

RM__-AD-SDP
48 CHIEF OPERATION OFFICER