Professional Documents
Culture Documents
RM Dammam Port - PDF Drawings
RM Dammam Port - PDF Drawings
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT WRITTEN AUTHORIZATION FROM THE CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT OF SAUDI READYMIX CONCRETE CO. LTD.
3. ALL ELEVATION DIMENSIONS AND LEVELS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
4. ALL MEASUREMENTS ARE SUBJECT FOR SITE VERIFICATION.
5. ALL FACILITIES SHOWN IN THIS PLAN ARE IN COMPLIANCE TO THE REQUIREMENT OF THE
PRODUCTION
DEPARTMENT. ANY CHANGES OR REVISIONS SHOULD BE DONE BY THE ISSUING DEPARTMENT WITH THE
APPROPRIATE
REMARKS AND NOTES FROM THE RESPECTIVE APPROVING COMMITTEE. REVISIONS ARE TO BE DONE
ONLY AFTER
REMARKS ARE RECEIVED.
KEY PLAN:
N
ADMIXTURE
14
BAY - 05
SILO FOUNDATION TANK W E
300T 300T S
SEPTIC
PLANT #02
TANK
TOTAL AREA = (+/-) 10,000.00 M2
7
150T
TOTAL PERIMETER FENCE = (+/-) 400.00 LM
BATCH
LEGEND:
TOILET
LABOR
D
BAY - 04
6 02 - PORTABLE GUARD HOUSE
03 - PORTABLE OFFICE
04 - PORTABLE LABORATORY (OPTIONAL)
MUD SETTLING
BATCH 14 05 - CONCRETE WASTE AREA
A
TANK
CABIN
06 - LABOR TOILET
CURING TANK
08 - WEIGHBRIDGE
CURING ROOM
PORTABLE
LABORATORY
BAY - 03
09 - BATCH PLANT #01
O
CONC. PAD
11
DIESEL TANK - SILO FOUNDATION #01
4 01
WATER TANK 04 - ADMIXTURE TANK #01
SAMPLE AREA
DIESEL TANK
02
10 - BATCH PLANT #02
R
WATER TANK 03
CONCRETE
GENERATOR
- ADMIXTURE TANK #02
5
GROUND
HOOPER
BAY - 02
GENERATOR
02
11 - AGGREGATE STOCKBAY (5-BAY)
OFFICE PORTABLE
ICE PLANT
12 - TRUCK WASHING AND DUMPING AREA
GENERATOR 13 - CONTROL SERVICE AREA
GROUND
HOOPER
03
CHILLER PLANT
14 - SLAB ON GRADE
3 14 GENERATOR
S
04
BAY - 01
WATER TANK 02
EDS
ROOM 14
OFFICE PORTABLE
S
WATER TANK 01
3
E
MUD SETTLING
DOCUMENT DISCLAIMER:
TANK
PLANT #01
BATCH
CABIN
C
BATCH
3
9 2
C
1
14 REVISION NO.: REVISED BY.: REVISION DATE:
TRUCK WASHING
AND DUMPING AREA
REVISIONS
TRUCK WASHING
150T
AREA
A
300T 300T
SETTLING TANK
WASTE DUMPING
HOUSE/
MRR
MAIN ENTRANCE /
12
AREA
DRAWING TITLE:
14
EXIT GATE
WEIGHBRIDGE RM
1 ON-SITE PROJECT
LOCATION: DAMMAM, KINGDON OF SAUDI ARABIA
DRAWING TITLE:
S I T E D E VE L O P M E N T P L AN
CHECKED BY: ENGR. ASHRAF YOUSEF DATE: 11-JUN-2023
DRAWING NO.: PAGE NO.: FINAL APPROVAL:
RM__-AD-SDP
01 CHIEF OPERATION OFFICER
DATE:
LEFT CORNER RIGHT CORNER
GATE ELEVATION
SCALE 1:100 METERS
GATE AND BOUNDARY
FENCE
DATE
CONTENTS AS SHOWN JUNE 12, 2023
500 50
300
200
210
80
80
80
50
PLAN
DETAIL OF HINGE
GATE AND BOUNDARY
150T
300T
C C
SECTION SECTION
D
SECTION
300T D
SECTION
F
B B SECTION
SECTION SECTION
E E
SECTION SECTION
BATCH PLANT #1
FOUNDATION PLAN
SCALE 1:100
F
SECTION BATCH PLANT #1
DATE
CONTENTS AS SHOWN JUNE 12, 2023
BATCH PLANT #1
DATE
CONTENTS AS SHOWN JUNE 12, 2023
BATCH PLANT #1
BATCH PLANT #1
SECTION THRU F-F CONTENTS AS SHOWN
DATE
JUNE 12, 2023
105
300T
700
100
D
SECTION
300T D
SECTION SECTION
150T
300T
C C
SECTION SECTION
D
SECTION
300T D
SECTION
F
SECTION
B B
SECTION SECTION
E E
SECTION SECTION
BATCH PLANT #2
FOUNDATION PLAN BATCH PLANT #2
SCALE 1:100 F DATE
SECTION CONTENTS AS SHOWN JUNE 12, 2023
BATCH PLANT #2
DATE
CONTENTS AS SHOWN JUNE 12, 2023
BATCH PLANT #2
BATCH PLANT #2
DRAWING BY
AS SHOWN
CHECKED BY
DATE
JUNE 12, 2023
CHECKED BY
SCALE 1:100
JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ
300T
700
100
SECTION D
SECTION
300T D
SECTION
BATCH PLANT #2
DATE
CONTENTS AS SHOWN JUNE 12, 2023
A
4 2 4 2
ELEV. ELEV.
ELEV. ELEV.
1 1
ELEV. ELEV.
DRIVERS ROOM AND BATCH CABIN DRIVERS ROOM AND BATCH CABIN
GROUND FLOOR PLAN SECOND FLOOR PLAN
SCALE 1:100 SCALE 1:100
DRIVERS ROOM
PLAN
DATE
CONTENTS AS SHOWN
DRIVERS ROOM AND BATCH CABIN DRIVERS ROOM AND BATCH CABIN
DRIVERS ROOM
PLAN
DATE
CONTENTS AS SHOWN
DRIVERS ROOM
PLAN
DATE
CONTENTS AS SHOWN
PORTABLE BATCH
CABIN
DRIVERS ROOM
LONGITUDINAL SECTION
SCALE 1:100
1 2
1 2
A A
B B
DRIVERS ROOM
DRIVERS ROOM AND BATCH CABIN
DRIVERS ROOM AND BATCH CABIN
PLAN
ROOF PLAN REFLECTED CEILING PLAN DATE
SCALE 1:100 CONTENTS AS SHOWN
SCALE 1:100
F.F.L
NGL
FOUNDATION PLAN
SCALE 1:100
SECTION
F.F.L
NGL PLAN
DRIVERS ROOM
PLAN
DATE
CONTENTS AS SHOWN
A
STIRRUPS BOTTOM BARS
B 2 - 16 MM Ø TOP BARS
2 - 12 MM Ø CONT. BARS
2 - 16 MM Ø TOP BARS
2 - 12 MM Ø CONT. BARS
2 - 16 MM Ø BOT. BARS 2 - 16 MM Ø BOT. BARS
@ SUPPORT @ MID-SPAN
DRIVERS ROOM AND BATCH CABIN
DRIVERS ROOM
PLAN
DATE
CONTENTS AS SHOWN
Diesel Tank
Diesel Tank
Gen. #2
Gen. #4
Gen. #1
Gen. #3
Compacted Selected Earthfill 100mm THK . BLINDING
Ice Plant
SPACED @ 200mm O.C. SPACED @ 200mm O.C.
150mmSPACING BARS BOTHWAYS ON TOP
MIDDLE AND BOTTOM
WATER TANK 04
WATER TANK 03
WATER TANK 03
Chiller Plant
A
10mmØ BARS
contacting soil, excluding bottom surfaces and surfaces DESIGNED BY : ENGR. ARCHIE S. DE LA CRUZ DRAWN BY : ENGR. ALI AL-SAUIB
Elev. + 0.15 CHECKED BY : ENGR. MOHAMMAD ZAYED
REVISION :
of leveling. (Blinding) APPROVED BY :
DATE : 08.12.2022 SCALE: As Shown
3) All bottom surfaces of concrete cast against and CONTENTS
PLAN, DETAILS AND SECTIONS
permanently in contact with ground shall be under laid by
SECTION “C” DRAWING NO. PAGE NO.
polyethylene sheets (Vapour Barrier) as indicate on drawings.
Not To Scale CSF – ST - 01 21
SEE BEAM DETAIL
Insulation
150mm thk. Slab on grade with Rafter 5 nos. @ equal spacing
MPB
MPB
10mmx200x200 wire mesh EDS ROOM
I-Beam 100x50mm Finished Slab on Grade Final Level of Control Service
Roof Line
Cable Trench See Details
Fabricated Steel Plate
10mm Thick with Handle
FLOOR PLAN ROOF FRAMING PLAN
1 : 100 m SCALE 1 : 100 m
SCALE
FFL FINAL LEVEL OF TOP OF CONTORL SERVICE FFL Final Level of Top of Control Service
FRONT ELEVATION RIGHT SIDE ELEVATION 4 - 14mm DIA. MAIN REBAR WITH 10mm
DIA. STIRRUPS @ 200mm PACING
SCALE N.T.S. N.T.S.
SCALE
PROJECT TITLE
CORRUGATED ROOF SHEET CORRUGATED ROOF SHEET
WITH ROOF INSULATION WITH ROOF INSULATION LINTEL BEAMS 200mm x 200mm
Y
XX-XXX
X
XX-XXX
1
FE-300 ADMIXTURE TANK
DATE
CONTENTS AS SHOWN JUNE 12, 2023
ELEVATION - 01 ELEVATION - 02
SCALE 1:100 SCALE 1:100
1 2 3 A B
ADMIXTURE TANK
DATE
SECTION THRU - Y CONTENTS AS SHOWN JUNE 12, 2023
SECTION THRU - X SCALE 1:100
SCALE 1:100 DRAWING BY CHECKED BY CHECKED BY
JOHN KARL R. DELA HOSTRIA ENGR. ARCHIE DELA CRUZ
A A
B B
ADMIXTURE TANK
DATE
CONTENTS AS SHOWN JUNE 12, 2023
880
1365
ADMIXTURE TANK
170
200
B B
100
35 130 35
200
100
30 140 30
SECTION THRU - B
SECTION
SECTION
DATE
SCALE: NTS CONTENTS AS SHOWN JUNE 12, 2023
X SECTION THRU - X
XX-XXX
PLAN
MUD SETTLING TANK
SECTION THRU - Y
DATE
CONTENTS AS SHOWN JUNE 12, 2023
SETTLING TANK
X1' X1
FX-400 FX-400
WASTE DUMPING
AREA
A
A/300
SETTLING TANK
SECTION THRU A - A
SCALE 1:100
TRUCKWASHING AND
WASTE DUMPING AREA
DATE
CONTENTS AS SHOWN JUNE 12, 2023
TRUCKWASHING AND DUMPING AREA
SCALE 1:100
APPROVED BY SHEET NO PAGE NO
ENGR. MOHAMMAD ZAYED 2 of 3 31
300
300
2500
3000
3000
3000
3150
4500
WASTE DUMPING AREA
WASTE DUMPING AREA
250
100
2000
150
300 500 250
500100
1250
SETTLING TANK
1600
1500
600
500 350 350
900
800
300
250
1000
1200
15300
700
100
2000
SETTLING TANK
1250
1600
1600
1000
1500
500
11085
250
4800
TRUCKWASHING AND
WASTE DUMPING AREA
DETAIL OF TRUCKWASHING AREA AND WASTE DUMPING AREA
SCALE: NTS DATE
CONTENTS AS SHOWN JUNE 12, 2023
4.0000 4.0000
WEIGHBRIDGE PLAN
SCALE NTS
0.6000 0.4500
SLAB ON GRADE ELEVATION SLAB ON GRADE ELEVATION
0.1500
0.3500 0.6000
Concrete Blinding 50mm thick.
COMPACTED SOIL
1.5000 1.5000 1.5000 1.5000
COMPACTED SOIL COMPACTED SOIL
SECTION THRU - A
SCALE NTS
4.0000
4.0000 1.0000 A
10mm Ø BARS 2-LAYER SPACED @ 200mm 100 x 100 x 5mm THICK ANGLE BAR AT
O.C. BOTH WAYS CORNER EDGE
RC FOUNDATION 1.5000
DATE
SCALE NTS SECTION - B ENGR. ARCHIE S. DE LA CRUZ ENGR. MOHAMMAD ZAYED __________________
3
FE-300
Y Y1
COL.SEC. WALL SEC
4 2
FE-300
BAY - 01 BAY - 02 BAY - 03 BAY - 04 BAY - 05 FE-300
B X
COL. SEC
A A
SEC. SEC.
X1
WALL SEC
1
FE-300
AGGREGATE STOCKBAY
DATE
CONTENTS PLAN JUNE 12, 2023
11 10 9 8 7 6 5 4 3 2 1
C B A
AGGREGATE STOCKBAY
DATE
CONTENTS ELEVATIONS JUNE 12, 2023
1 3 5 7 9 11
AGGREGATE STOCKBAY
DATE
CONTENTS SECTIONS JUNE 12, 2023
A B C
AGGREGATE STOCKBAY
DATE
AGGREGATE STOCKBAY PLAN CONTENTS SECTIONS JUNE 12, 2023
3
FE-300
4 2
FE-300 FE-300
1
FE-300
AGGREGATE STOCKBAY
DATE
CONTENTS ROOF PLAN JUNE 12, 2023
RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1
A
PURLINS PURLINS PURLINS PURLINS PURLINS
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
B PURLINS PURLINS PURLINS PURLINS PURLINS
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
RT-1
PURLINS PURLINS PURLINS PURLINS PURLINS
C RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1 RT-1
AGGREGATE STOCKBAY
ROOF FRAMING PLAN
SCALE 1:100 MTS.
AGGREGATE STOCKBAY
SECTION THRU - W
TYPICAL WALL FRAMING DETAILS
SCALE 1:50 METERS
12000
1000 1000
1000 1000
1000 1000
1000 1000
1000 1000
1000 1000
AGGREGATE STOCKBAY
DATE
CONTENTS AS SHOWN JUNE 12, 2023
SLAB ON GRADE SLOPE 1.5% SLAB ON GRADE SLOPE 1.5% SLAB ON GRADE SLOPE 1.5% SLAB ON GRADE SLOPE 1.5% SLAB ON GRADE SLOPE 1.5%
AGGREGATE STOCKBAY
FOUNDATION PLAN
SCALE 1:100 MTS.
AGGREGATE STOCKBAY
DATE
CONTENTS FOUNDATION PLAN JUNE 12, 2023
(STEEL COLUMN)
(BASE PLATE)
75 150 75
75 150 75
(COLUMN)
400
300
300
300
300
300
75 150 75
75 150 75
PLAN PLAN
4000
4000
4600
4600
400 300
300
100
100
400 200
400200
700
700
600
600
(HEIGHT VARIES)
(HEIGHT VARIES)
1200
0
0
10
10
1200
300
400
4600
4600
150
300
150
400 200
600
400 200
1200
1200
WATER TRENCH DETAIL
SCALE 1:25 METERS
DATE
PLAN
DETAIL OF R.C WALL AND RCC COLUMN
CONTENTS
JUNE 12, 2023
W E
A-A
SEC.
UNDERGROUND
SCALE
SEPTIC
1:100
TANK PLAN
METERS
DRAWING TITLE:
SEPTIC TANK
25000 LITERS
DATE
CONTENTS AS SHOWN DECEMBER 14, 2022
3.50
0.30 0.30
0.30
Water Passage
F.F.L. F.F.L.
14mm dia. Vertical bars
@ 150mm spacing
5.80m.
Plain concrete blinding 100mm thick 300mm thk. Concrete slab With12mm dia. @
150mm Spacing bothways (2 Layers)
3.80
SECTION THRU - A
SCALE 1:75 MTS
B
PLAN
SCALE 1: 75 MTS
10mm DIA.
HORIZONTAL BARS @
150mm SPACING
F.F.L. F.F.L.
N.G.L. N.G.L.
DRAWING TITLE
12mm DIA.
HORIZONTAL BARS @ CONCRETE WASTE TANK LAYOUT
150mm SPACING
DATE
PLAIN CONCRETE BLINDING CONTENTS PLAN, SECTION A & SECTION B
08/12/2022
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT WRITTEN AUTHORIZATION FROM THE CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT OF SAUDI READYMIX CONCRETE CO. LTD.
3. ALL ELEVATION DIMENSIONS AND LEVELS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
4. ALL MEASUREMENTS ARE SUBJECT FOR SITE VERIFICATION.
5. ALL FACILITIES SHOWN IN THIS PLAN ARE IN COMPLIANCE TO THE REQUIREMENT OF THE
PRODUCTION
DEPARTMENT. ANY CHANGES OR REVISIONS SHOULD BE DONE BY THE ISSUING DEPARTMENT WITH THE
APPROPRIATE
REMARKS AND NOTES FROM THE RESPECTIVE APPROVING COMMITTEE. REVISIONS ARE TO BE DONE
ONLY AFTER
REMARKS ARE RECEIVED.
KEY PLAN:
N
ADMIXTURE W E
BAY - 05
SILO FOUNDATION TANK
E
300T 300T S
SEPTIC
PLANT #02
TANK
TOTAL AREA = (+/-) 10,000.00 M2
150T
TOTAL PERIMETER FENCE = (+/-) 400.00 LM
BATCH
LEGEND:
TOILET
LABOR
MSB02
D
BAY - 04
E
PVC CONDUIT LINES
MUD SETTLING
BATCH EXCAVATION AND BACKFILLING LINES
A
TANK
CABIN
FOR BP#02 Batch Control Panel
CURING TANK
CURING ROOM
PORTABLE
LABORATORY
BAY - 03
O
PANEL BOARD
CONC. PAD
DIESEL TANK
01
WATER TANK 04 E
SAMPLE AREA
EARTHING
FOR LABORATORY
OFFICE
DIESEL TANK
1 Sets -3 x 25mm² + 16mm² 02
E Cu / PVC Sheathed / XLPE / STA
R
WATER TANK 03
CONCRETE
MH05
WASTE
AREA
GENERATOR
GROUND
HOOPER
BAY - 02
Cu / PVC Sheathed / XLPE / STA
GENERATOR
02 E
OFFICE PORTABLE
ICE PLANT
FOR ICE PLANT
2 Sets - 3 x 150mm² + 70mm²
GENERATOR E
Cu / PVC Sheathed / XLPE / STA
GROUND
HOOPER
03 E CHILLER PLANT
MP02
FOR CHILLER PLANT E
2 Sets -3 x 120mm² + 70mm² GENERATOR
S
BAY - 01
WATER TANK 02
FOR LABORATORY AND OFFICE BUILDING
2 Sets -3 x 50mm² + 25mm² EDS
ROOM
OFFICE PORTABLE
S
MUD SETTLING
E
Cu / PVC Sheathed / XLPE / STA
DOCUMENT DISCLAIMER:
TANK
PLANT #01
E BATCH
MP04
MH03 MH02 CABIN
C
MP01
MH04 E
BATCH
MH07
FOR TRUCK WASHING
1 Set -4 x 16mm²
MSB01 Cu / PVC Sheathed / XLPE / STA 3
2
C
E
1
REVISION NO.: REVISED BY.: REVISION DATE:
TRUCK WASHING
1 Set -4 x 16mm²
150T
300T 300T
SETTLING TANK
E
WASTE DUMPING
HOUSE/
MRR
MAIN ENTRANCE /
AREA
DRAWING TITLE:
EXIT GATE
WEIGHBRIDGE RM
ON-SITE PROJECT
LOCATION: DAMMAM, KINGDON OF SAUDI ARABIA
DRAWING TITLE:
MAIN ELECTRICAL
DISTRIBUTION LAYOUT
SCALE: 1 : 100 UNIT: METERS
CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT
ARCHITECTURAL & INTERIOR DESIGN WORKS:
DESIGNED BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023
RM__-AD-SDP
45 DATE:
CHIEF OPERATION OFFICER
GENERAL NOTES:
1. ALL SITE DIMENSIONS ARE MEASURED IN MILLIMETERS UNLESS STATED OTHERWISE.
2. INDIVIDUAL BUILDING DIMENSIONS & DETAILS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT WRITTEN AUTHORIZATION FROM THE CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT OF SAUDI READYMIX CONCRETE CO. LTD.
3. ALL ELEVATION DIMENSIONS AND LEVELS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
4. ALL MEASUREMENTS ARE SUBJECT FOR SITE VERIFICATION.
5. ALL FACILITIES SHOWN IN THIS PLAN ARE IN COMPLIANCE TO THE REQUIREMENT OF THE
PRODUCTION
DEPARTMENT. ANY CHANGES OR REVISIONS SHOULD BE DONE BY THE ISSUING DEPARTMENT WITH THE
APPROPRIATE
REMARKS AND NOTES FROM THE RESPECTIVE APPROVING COMMITTEE. REVISIONS ARE TO BE DONE
ONLY AFTER
REMARKS ARE RECEIVED.
N
KEY PLAN:
E
W
S
ADMIXTURE
BAY - 05
SILO FOUNDATION TANK
E
300T 300T
TOTAL AREA = (+/-) 10,000.00 M2
SEPTIC
PLANT #02
TANK
TOTAL PERIMETER FENCE = (+/-) 400.00 LM
150T
BATCH
LEGEND:
TOILET
LABOR
MSB02
D
BAY - 04
E
MUD SETTLING
BATCH
A
TANK
CABIN
ELECTRICAL MANHOLE
OPEN SHELF STEEL UNDER CABINET
MH01 E
MP03
LABORATORY
CURING TANK
CURING TANK
CURING ROOM
PORTABLE
LABORATORY
PANEL BOARD
BAY - 03
O
CONC. PAD
EXCAVATION AND
DIESEL TANK
01
BACKFILLING
WATER TANK 04 E
SAMPLE AREA
EARTHING
OFFICE
DIESEL TANK
02
E
R
WATER TANK 03
CONCRETE
MH05
WASTE
AREA
GENERATOR
GROUND
HOOPER
BAY - 02
1-SET - 4" SCH. 40 PVC CONDUIT PIPE
1-SET - 2" SCH. 40 PVC CONDUIT PIPE GENERATOR
02 E
OFFICE PORTABLE
ICE PLANT
GENERATOR E
GROUND
HOOPER
1-SET - 2" SCH. 40 PVC CONDUIT PIPE 03 E CHILLER PLANT
MP02
E
GENERATOR
S
04 E
BAY - 01
WATER TANK 02
1-SET - 4" SCH. 40 PVC CONDUIT PIPE
EDS
1-SET - 2" SCH. 40 PVC CONDUIT PIPE ROOM
OFFICE PORTABLE
S
E
WATER TANK 01
EXCAVATION AND
BACKFILLING
1-SET - 6" SCH. 40 PVC CONDUIT PIPE
1-SET - 4" SCH. 40 PVC CONDUIT PIPE
1-SET - 2" SCH. 40 PVC CONDUIT PIPE
E
MUD SETTLING
E
DOCUMENT DISCLAIMER:
TANK
PLANT #01
E BATCH
MP04
MH03 MH02 CABIN
C
MP01
MH04 E
BATCH
EXCAVATION AND
BACKFILLING
MSB01 3
C
E 2
1
REVISION NO.: REVISED BY.: REVISION DATE:
TRUCK WASHING
1-SET - 4" SCH. 40 PVC CONDUIT PIPE
150T
300T 300T
SETTLING TANK
E
1-SET - 2" SCH. 40
MH06 PVC CONDUIT PIPE
SILO FOUNDATION ADMIXTURE E
GUARD TANK
AREA
DRAWING TITLE:
EXIT GATE
WEIGHBRIDGE RM
ON-SITE PROJECT
LOCATION: DAMMAM, KINGDON OF SAUDI ARABIA
DRAWING TITLE:
MAIN ELECTRICAL AND
NETWORKING CONDUIT LAYOUT
SCALE: 1 : 100 UNIT: METERS
CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT
ARCHITECTURAL & INTERIOR DESIGN WORKS:
DESIGNED BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023
RM__-AD-SDP
46 CHIEF OPERATION OFFICER
DATE:
GENERAL NOTES:
1. ALL SITE DIMENSIONS ARE MEASURED IN MILLIMETERS UNLESS STATED OTHERWISE.
2. INDIVIDUAL BUILDING DIMENSIONS & DETAILS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT WRITTEN AUTHORIZATION FROM THE CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT OF SAUDI READYMIX CONCRETE CO. LTD.
3. ALL ELEVATION DIMENSIONS AND LEVELS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
4. ALL MEASUREMENTS ARE SUBJECT FOR SITE VERIFICATION.
5. ALL FACILITIES SHOWN IN THIS PLAN ARE IN COMPLIANCE TO THE REQUIREMENT OF THE
PRODUCTION
DEPARTMENT. ANY CHANGES OR REVISIONS SHOULD BE DONE BY THE ISSUING DEPARTMENT WITH THE
APPROPRIATE
REMARKS AND NOTES FROM THE RESPECTIVE APPROVING COMMITTEE. REVISIONS ARE TO BE DONE
ONLY AFTER
REMARKS ARE RECEIVED.
N
KEY PLAN:
E
W
ADMIXTURE
BAY - 05
S
SILO FOUNDATION TANK
300T 300T
SEPTIC
PLANT #02
TANK
150T
TOTAL AREA = (+/-) 10,000.00 M2
BATCH
TOTAL PERIMETER FENCE = (+/-) 400.00 LM
LEGEND:
TOILET
LABOR
BAY - 04
D
MUD SETTLING
BATCH
A
TANK
CABIN EXCAVATION AND BACKFILLING LINES
LABORATORY
CURING TANK
CURING TANK
CURING ROOM
PORTABLE
ELECTRICAL MANHOLE
LABORATORY
BAY - 03
O
CONC. PAD
EXCAVATION AND
DIESEL TANK
01
BACKFILLING
WATER TANK 04
PANEL BOARD
SAMPLE AREA
OFFICE
DIESEL TANK
02 1-3" G.I. PIPE E EARTHING
R
WATER TANK 03
CONCRETE
WASTE
AREA
GENERATOR
GROUND
HOOPER
BAY - 02
1-2" G.I. PIPE
GENERATOR
02
OFFICE PORTABLE
ICE PLANT
GENERATOR
GROUND
HOOPER
1-3" G.I. PIPE 03
CHILLER PLANT
1-2" G.I. PIPE
GENERATOR
S
04
BAY - 01
WATER TANK 02 1-6" G.I. PIPE
EDS
ROOM
OFFICE PORTABLE
S
WATER TANK 01
1-3" G.I. PIPE
MUD SETTLING
1-3" G.I. PIPE
DOCUMENT DISCLAIMER:
TANK
PLANT #01
BATCH
CABIN
C
BATCH
3
C
2
1
REVISION NO.: REVISED BY.: REVISION DATE:
TRUCK WASHING
150T
A
300T 300T
SETTLING TANK
WASTE DUMPING
HOUSE/
MRR
MAIN ENTRANCE /
AREA
DRAWING TITLE:
EXIT GATE
WEIGHBRIDGE RM
ON-SITE PROJECT
LOCATION: DAMMAM, KINGDON OF SAUDI ARABIA
DRAWING TITLE:
RM__-AD-SDP
47 CHIEF OPERATION OFFICER
DATE:
GENERAL NOTES:
1. ALL SITE DIMENSIONS ARE MEASURED IN MILLIMETERS UNLESS STATED OTHERWISE.
2. INDIVIDUAL BUILDING DIMENSIONS & DETAILS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT WRITTEN AUTHORIZATION FROM THE CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT OF SAUDI READYMIX CONCRETE CO. LTD.
3. ALL ELEVATION DIMENSIONS AND LEVELS ARE MEASURED IN MILLIMETERS UNLESS STATED
OTHERWISE.
4. ALL MEASUREMENTS ARE SUBJECT FOR SITE VERIFICATION.
5. ALL FACILITIES SHOWN IN THIS PLAN ARE IN COMPLIANCE TO THE REQUIREMENT OF THE
PRODUCTION
DEPARTMENT. ANY CHANGES OR REVISIONS SHOULD BE DONE BY THE ISSUING DEPARTMENT WITH THE
APPROPRIATE
REMARKS AND NOTES FROM THE RESPECTIVE APPROVING COMMITTEE. REVISIONS ARE TO BE DONE
ONLY AFTER
REMARKS ARE RECEIVED.
N
KEY PLAN:
E
W
Heavy duty
Manhole Cover S
Finished Slab on
Grade level
DOCUMENT DISCLAIMER:
F.F.L.
10mmØ Bars
F.F.L.
Underground Electrical 3
2
Wires Or Water Lines 1
EL 0.00 REVISION NO.: REVISED BY.: REVISION DATE:
REVISIONS
RM
ELICTRICAL LINE DETAIL(EXCAVATION AND BACKFILL) ELECTRICAL TRENCHES
SCALE NTS SCALE 1:25
ON-SITE PROJECT
LOCATION: DAMMAM, KINGDON OF SAUDI ARABIA
DRAWING TITLE:
AS SHOWN
SCALE: 1 : 100 UNIT: METERS
CONSTRUCTION & FACILITIES MANAGEMENT DEPARTMENT
ARCHITECTURAL & INTERIOR DESIGN WORKS:
DESIGNED BY: ENGR. ARCHIE S. DE LA CRUZ DATE: 11-JUN-2023
RM__-AD-SDP
48 CHIEF OPERATION OFFICER
DATE: