FIT - UP INSPECTION REPORT

INFORMATION
LINE NO ZONE - 02, ST - 03, NORTH NORTH, EAST RAMP IR REF NO MASAR-MMO-PW-IR-0985

AREA / LOCATION ZONE - 02, ST - 03, NORTH NORTH SUBMISSION DATE 10/6/2023

SPECIFICATION WP-MS- 406 X 8.8 MM INSPECTION DATE 11/6/2023

DRAWING NUMBER MASR-MMO-IC-UGS-DWG-SWM-2319-02

INSPECTION RECORD
MAIN LINE
NO ISOMETRIC LINE NO JOINT NO LENGTH THICKNESS ITEM - 1 HEAT NO - 1 ITEM - 2 HEAT NO - 2 PIPE DIA
1 J1 PB45-5D-C-MS-406X8.8 MM PIPE 3.26 MTR

PB30-5D-C-MS-406X8.8
2 J2 20.1 MTR PIPE 3.26 MTR
MM

3 J3 PB30-5D-C-MS-406X8.8 MM PIPE 1.13 MTR

4 J4 PIPE 1.13 MTR PIPE 1.72 MTR


ZONE - 02, ST - 03, 2 MTR
5 NORTH NORTH, EAST J5 8.8 MM PIPE 1.72 MTR PIPE 3.44 MTR 406 MM
RAMP
6 J6 PIPE 3.44 MTR PB15-5D-C-MS-406X10 MM
10.5 MTR
7 J7 PB15-5D-C-MS-406X10 MM PIPE 7.44 MTR

PB30-5D-C-MS-406X8.8
8 J8 PIPE 7.44 MTR
MM
1.8 MTR
9 J9 PB30-5D-C-MS-406X8.8 MM PIPE 6 MTR