Sub: EXTENSION OF LOAD FROM 425 KW TO


675 KW (NET EXT 250 KW) FOR AL-HAMD
SPINNING PRIVATE LTD. BHIKHI 12-KM
FAISALABAD ROAD, SHEIKHUPURA.

This is a case of extension of load from 425 kW to 675 kW


(Net extension of 250 KW) in the name of Mr. Muhammad
Ayyub S/O Haji Abdul Haq, the Chief Executive of Al-Hamd
Spinning Private Ltd. from tariff B-2 to B-3 for M/s Al-
Hamd Spinning Private Ltd. Bhikhi 12-KM Faisalabad Road,
Sheikhupura. The site has been visited by the undersigned
alongwith AM Planning with staff.

History

Previously the connection was sanctioned for the load of


424.575 kW under Tariff B-2 in the name of Mr.
Muhammad Ayyub S/O Haji Abdul Haq by S.E. 6 th Circle on
dated 5.11.2001. The connection was installed on
22.1.2002 after completing the departmental formalities.
Now the connection is being fed through 11 KV Industrial-3
Mixed load Feeder emanating from 132 KV Bhikhi G/S. The
EOL is also being processed on this feeder.

The loading position of 132 KV Bhikhi G/S and 11 kV


Industrial-3 feeder are as under:

T-1 (20/26 MVA) Industrial-3 feeder


Month
2003 2004 2003 2004
Jan --- 660 140
Feb --- 500 130
Mar --- 550 140
Apr --- 740 120
May --- 620 150
Jun --- 580 120
Jul 490 680 110 120
Aug 650 600 160 130
Sep 610 610 110 140
Oct 590 650 130 120
Nov 470 760 130 130
Dec 570 730 130 140
2

The following cases have already been processed from 132


kV Bhikhi G/S:

1 Zaman Paper & NEW 4850 kW 282.84 Amp


Board
2 AHN Colloids EOL 413.72 to 944 (530.31 kW) 30.43 Amp
3 Shahzore Feeds EOL 497 to 1050 (553 kW) 32.25 Amp
4 Total 345.5 Amp

From above mentioned three cases M/s AHN Colloids is fed


from Industrial-3 feeder, which is also feeding Al-Hamd
Spinning, the instant case.

Following one No. Case is under process from the same 132
kV Bhikhi G/S.

1 Poly Paper NEW 980 kW 57.15 Amp

Percentage loading of 132 kV Bhikhi G/S

T-1
Year (20/26 MVA)
2003 650 Amps 50 %
2004 760 Amps 58 %
T-2 has been energized at No load
3

Percentage loading after considering instant and under


process extension of load cases

T-1
(20/26 MVA)
Existing 760 Amp 58.24 %
After Load Addition of 760+345.5=1105.5 84.7 %
already sanctioned cases
After considering Under 1105.5+57.15=1162.65 89.09 %
Process Cases
After load addition of 1162.65+14.6=1177.25 90.2 %
instant case (14.6)

The loading condition of transformer is very critical but it is


pertinent to mention here that another transformer T-2 has
been installed on the 132 KV Bhikhi G/S and running on
no load. So, it is recommended to approve the instant case
after making arrangements of load shifting on newly
installed T-2.

Load Flow Analysis


Technical Analysis have been carried out on the load of
195 Amp comprising (Max. load on the feeder 150 Amp +
30.4 Amp for already approved AHN Colloids + 14.6 Amp
required for the instant extension).

Technical Specified Existing 150 Amp Existing at 195 Amp


Parameters Max Limits

% Voltage Drop 5% 1.4 % 1.8 %


% power loss 3.5 1% 1%
% Annual E.
3% 0% 1 %
Loss
Length of feeder 5.965 KM 5.965 KM 5.965 KM
Conductor Size
Osp Osp Osp
at main stem
4
As all the technical parameters remain well within
permissible limits of the addition of instant load, so EOL
may be approved

Scope of work

1 From point A to Metering Room, 30-meter 4/0 AWG cable is


proposed and 12-meter existing 4/0 AWG cable will be
dismantled.
2 From Metering Room existing 630 KVA transformer will be
dismantled.

Capital Cost

A Cost of Dismantled Material Rs.25,468/-


B Cost of New Material & Metering Equipment Rs.89,071/-
Total Cost Rs.1,14,539/-

R & R Charges. (Being EOL from 425 to 675 kW)

Sr. Slab Load Rates (Per kW) Amount


No. (Rs.)
1 425-500 75 kW Rs.500/- 37,500/-
2 501-675 175 kW Rs.1500/- 2,62,500/-
Total: 3,00,000/-

Thus total capital cost comes to be Rs.1,14,539/- + Rs.3,00,000/-=


Rs.4,14,539/-

Security Amount
The security for the total load of 675 KW would be updated
from the consumer on fresh rates after adjustment the
security in hand if any and subject to its confirmation from
AM (CS) concerned.

Recommendations with Terms & Conditions:


The EOL from 425 to 675 kW (Net Ext 250 kW) may be
approved with the following terms and conditions:

1. The consumer is liable to deposit the Capital Cost of


Rs.4,14,539.
2. The consumer is liable to update the security for the total
load of 675 KW @ Rs.910/KW. The Demand Notice for the
5
amount of security will be issued after realization of capital
cost. The security amount shall be deposited in AM (CS)
account of Security Head of Rural Division Sheikhupura
through Cheque/Payorder/Bank Draft within stipulated
period from the date of issue of the Demand Notice.
3. The allowable/appropriate transformer capacity comes out
as 1000 KVA and consumer is allowed either to add a new
transformer of this capacity or to add an additional
transformer making the total installed capacity close to the
allowable capacity if the consumer had paid or purchased
the already installed transformer.
4. The capacity of CTs for metering and protection will be of
50/5 Amps.. The CTs for protection will be supplied by the
consumer whereas the cost of metering CTs and installation
charges of protection and metering CTs have been included
in the estimate of capital cost.
5. 11 kV TOD meter will be installed and B-3 TOD tariff will be
allowed. However, consumer will provide an
electromechanical meter, if already not installed, as back-
up arrangement with the consultation of Regional Manager
M&T East.
6. The consumer is liable to pay the DNs for capital cost and
security within stipulated period otherwise his case will
automatically stand cancelled.
7. The prospective consumer is liable to provide 11 kV
metering panel as per WAPDA specification P: 44: 96 duly
inspected by G.M. (MI), similarly the consumer shall install
the P: 44: 96 protection panel as above specifications.

8. Deputy Manager (Operation) Rural Division, Sheikhupura


shall strictly watch the maximum demand. Regional
Manager M&T East shall also adjust the plug setting of the
metering panel according to the sanctioned load to restrict
consumer within that limit.
9. Consumer will install power factor correction equipment at
his own cost to ensure that the power factor at his premise
does not fall below 90%. The Standing Committee shall
ensure this before affecting EOL.
10. The 11 KV installations shall be inspected and certified by
the Electrical Inspector to Government of Punjab for
issuance of necessary Test Report and NOC regarding the
instant EOL before affection of EOL. The consumer shall
furnish the same to this office immediately after
depositing the security amount.
11. All the work shall be executed according to the Wapda
6
Standard Design and Specifications.
12. All other usual formalities shall be fully observed by the
Committee before taking the work in hand and energization
of the connection.
13. The Standing Committee shall only take the work in hand
after receiving Go-ahead signal from this office.
14. After completion of work, the as built drawing will be
supplied by Deputy Manager (Operation), Rural Division,
Sheikhupura to this office for reference and record.
15. In case of variation in prices of material due to escalation or
additional material is required to be used or any other
charges detected at any later stage, the applicant will
remain liable to deposit the same.
16. All other conditions of B-3 connections shall also be
applicable.

M. Arshad Saleem Uppal Amir Ikram


Dy. Manager (P-1) Asstt. Manager (P-I)
Sr. Manager (P&D)