Professional Documents
Culture Documents
Nt-Al-Hamd Spinning
Nt-Al-Hamd Spinning
History
Following one No. Case is under process from the same 132
kV Bhikhi G/S.
T-1
Year (20/26 MVA)
2003 650 Amps 50 %
2004 760 Amps 58 %
T-2 has been energized at No load
3
T-1
(20/26 MVA)
Existing 760 Amp 58.24 %
After Load Addition of 760+345.5=1105.5 84.7 %
already sanctioned cases
After considering Under 1105.5+57.15=1162.65 89.09 %
Process Cases
After load addition of 1162.65+14.6=1177.25 90.2 %
instant case (14.6)
Scope of work
Capital Cost
Security Amount
The security for the total load of 675 KW would be updated
from the consumer on fresh rates after adjustment the
security in hand if any and subject to its confirmation from
AM (CS) concerned.