DENYS ARABIA COMPANY LTD

PROJECT: Zuluf AH Crude Oil Increment Project (Downstream Pipelines)


CONTRACT NO: 6601000060; BI: 10-12321
RFI LOG - NDT

INSPECTOR NAME LEVEL OF INSPECTION


SL. INSPECTION INSPECTION ACTIVITY
DAC RFI NO EPM RFI NO LOG DATE LOCATION STRUCTURE RFI DESCRIPTION SATIP SAIC RFI STATUS Remark DRAWING TEST REPORT
NO. DATE TIME NO.
CONTRACTOR PID CONTRACTOR SAPID
AUT In-Process Verification of Techniques and Procedure Impementation for ZFJ-1 Look
112 DAC-NDT-0115 1404703291 MR. MUNEEB MR. MEERA 24-Sep-23 25-Sep-23 7:15 AM KM29+000 , TANAJIB AUT-Inprocess Inspection W W SATIP- NDE-UT-01 SAIC-UT-2008 3.2 Open
Ahead welds.

113 DAC-NDT-0116 1404703241 MR. MUNEEB MR. MEERA 24-Sep-23 25-Sep-23 7:30 AM KM29+000 , TANAJIB AUT - Pre-test Inspection Inspection Requirements Prior to UT Applications - (Pre-Test Inspection of Exam Area) W W SATIP- NDE-UT-01 SAIC-UT-2007 3.1 Open

ZFBGT-01 KM03 TO 06+000, ZFJ-


114 DAC-NDT-0117 1404703423 MR. MUNEEB MR. MEERA 24-Sep-23 25-Sep-23 7:00 AM RT-Inprocess Inspection RADIOGRAPHY In-Process Verification of Techniques & Procedure Implementation W/R W/R SATIP-NDE-RT-01 SAIC-RT-2007 3.1 Open
01 KM24 to 29 +000TANAJIB