Town Rehema Renovation-1
Town Rehema Renovation-1
Issued by:
Client Architects/ Project managers
Rehema Academy ARCHTIST INK
P.O. Box……… P.O. Box 40200-3976
Kisii Nairobi
Quantity Surveyors
QS. Victor C. Maina
P.O. Box 514 - 20116
Gilgil
OCT 2022
PROPOSED 12 NO CLASSROOM RENOVATION
FOR REHEMA ACADEMY
PRELIMINARIES
PARTICULAR PRELIMINARIES
PARTIES TO THE CONTRACT
General Building Works are indicated in the Measured Works Sections of the
Bills of Quantities.
The Contractor shall prepare for scrutiny and issue to the Architect,
copies of detailed shop drawings of all specialist works. Following
the Architect's checking of these shop drawings the Contractor shall
immediately amend them as necessary and when approved, promptly
issue to the Architect four copies for general use.
The scrutiny of shop drawings by the Architect shall be for general
conformity, including conformity with the work of others and to
co-ordinate the contract work in space. Such approval shall not imply
any further indication of correctness.
B SUPERVISION Item
The said Works shall be executed under the direction and to the entire
satisfaction of the Architect, the Quantity Surveyor and Engineers' who shall
have the Architect's specifically delegated authority, and who shall at
all times have access to the Works and to the yards and workshops of
the Contractor or other places where work is being prepared for the
building works.
The Contractor shall be entirely responsible for the security of all the
works, stores, materials, plant, personnel, etc., both his own and
sub-contractors and shall provide all necessary watching, lighting, site
an other precautions as necessary to ensure the security and
the protection of the public.
The Contractor will be required to make good at his own expense any
damage he may cause to the present approach road surfaces during the
period of the Works.
The area of the site which may be occupied by the contractor for use
as storage and for the purpose of erecting workshops, etc., shall be
The Contractor shall provide at his own risk and cost all water for use
in connection with the Works including the work of sub-contractors;
make arrangements with the Local Authority for the installation of a
separate meter for all water used by him throughout the Contract and
pay all costs and fees in connection therewith. The Contractor may
however connect (if he so wishes) into the existing water supply for
water for use in connection with the works including the work of
specialists and sub-contractors : but he shall make arrangements with
the Employer for the installation of a separate metre for all water used
by him and the Sub-Contractors through out the contract and pay all
costs and fees in connection therewith at a rate to be agreed with the
Employer in advance. The Contractor shall not use existing water
services unless the said agreement with the Employer has been
effected in writing. He shall also provide temporary storage tanks and
tubing, etc., as he may consider necessary and clear away at
completion. All tanks for permanent retention/incorporation shall not
be used for this item.
All water shall be fresh, clean and pure, free from earthy, vegetable or
organic matter, acid or alkaline substance in solution or suspension.
The Contractor shall provide at his own risk and cost all artificial
lighting and power for use on the works, including all sub-contractors
and specialists requirements and including all temporary connections,
wiring, fittings etc., and clearing away on completion, The Contractor
shall pay all fees and obtain all permits in connection therewith.
Architect.
The Contractor shall provide sheds for storage area by the Employer
for all goods and materials.
A Site Office shall be provided for holding of Site Meetings. This
shall be fully equipped with a table and chairs of sufficient size and
number.
Artificial lighting and cleaning shall be provided.
The Contractor shall allow for provision of refreshments during the
site meetings.
Upon completion all temporary buildings are to be removed and
D TELEPHONE Item
The Contractor shall pay for a mobile telephone on the site, and shall
pay all costs and charges in connection therewith.
The latrines shall be enclosed with framing and corrugated sheet steel
roofs, sides and partitions with concrete floors, steel troweled smooth
to falls to facilitate washing. Their location shall be agreed with the
Architect and the Works shall not be commenced before the sanitary
accommodation has been approved by the above-mentioned
Authorities.
The Contractor shall provide and erect where directed and maintain
during the whole period of building operations and remove at
completion, one approved temporary notice board to the Consultants
standard design and giving a brief description of the Works and showing the
names of the Employer, Architect, Quantity Surveyor,
Consultant Engineers and Contractor with sufficient space to append
the names of Nominated Sub-Contractors and Suppliers when known.
The lettering concerning the Architect, Quantity Surveyor and
Engineers is to be not more than 50 mm high.
NB: The Notice board must be printed in computerized lithography on vinyl sheet
and mounted on marine board or metal sheet board, supported on mild steel
framework. Overall size of board shall be not less than 1.5m wide x 2m high
HOARDINGS/SITE BOUNDARY
C The Contractor shall provide temporary hoarding around site Item
The Contractor shall apply and pay fees to council for the hoardings at his own cost
Notes
All demolished items shall remain the property of the Employer and shall
be set aside unless otherwise instructed to dispose
All works in this section shall be performed in such a manner as to ensure
the safety of the public and adjoining property.
Allow for making good disturbed surfaces by reinstating the areas affected
by demolitions
ROOF DEMOLITIONS
Safely demolish and remove the existing roofcover ,members and cart
A away debris ; Prepare surfaces to receive new roof structure. Approx. sq. 1 Item 17,600 17,600.00
m
Carefully hack out existing Floor and wall elements and cart away debris ;
B 1 Item 19,400 19,400.00
Prepare surfaces to receive new finishes
CEILING DEMOLITIONS
Safely dismantle and remove the existing Celing and cart away debris ;
C 1 Item 8,400 8,400.00
Prepare surfaces to receive new ceiling finish
ELEMENT No. 1
MAIN ROOFING
Roof structure
Prime Grade Cypress Timber roof structure: pressure impregnated:
obtained from an approved source: with bolted connections : in
A 100 x 50mm thick struts and ties: including fastening to other members
624 500
m 312,000.00
150 x 50mmmm thick Rafters and tie beams ;including fixing to wall
B m 660 550 363,000.00
plate.
-
C 75 x 50mm thick purlins; including fastening other members m 540 350 189,000.00
100 x 50mm Wall plate secured with and including 12mm diameter mild
D steel anchor bolt 300mm long at 900mm centres cast in concrete ring m 168 500 84,000.00
beam
ROOF COVERING
E Roof covering; fixed to slopes including ridges and valley caps m2 352 2,200.00 774,400.00
Prepare surfaces and apply three coats gloss oil paint on woodwork
G externally: surfaces over 200 but not exceeding 300mm girth (fascia and m 186 120.00 22,320.00
berge board)
ELEMENT No. 2
RAINWATER GOODS
Rainwater goods; UPVC gutters and down pipes fixed with and including
all appopriate accessories: Working around rain water outlets
(Provisional)
H Surfaces over 200m, but not exceeding 300mm m 159 120 19,080.00
girth
10 136,540.00
Gypsum Cornice
Sand and clean surfaces: apply one coat skimming compound as 'Wall
Magic or equal and approved: apply THREE coats ''Crown" Silk Vynil
Paint from "Crown" or "Jotun" or equal approved: on
BRANDERING
Structural timbers, sawn cypress pressure impregnated
as described
D 50x50mm sawn cypress ceiling brandering including fastening to other
members
LM 981 425
416,925.00
Gypsum Cornice
F 100mm gypsum cornice in four labour LM 168 420.00 70,560.00
Sand and clean surfaces: apply one coat skimming compound as 'Wall
Magic or equal and approved: apply THREE coats ''Crown" Silk Vynil
Paint from "Crown" or "Jotun" or equal approved: on
ELEMENT NO.1
EXTERNAL FLOORS
20mm thick coloured Polished Terrazzo floor finish in: including PVC
dividing strips:
Sand and clean surfaces: apply one coat skimming compound as 'Wall
Magic or equal and approved: apply THREE coats ''Crown" Silk Vynil
Paint from "Crown" or "Jotun" or equal approved: on
FLOOR FINISHES
SUPPLY AND FIX: Ceramic floor Tiles: 10mm Thick: from 'Saj'
ceramics Ltd: allow the prime cost rate of Kshs 1200/=+VAT per sm for
purchase as selected by the Architect: transport to site, insure and
store: fixed with 'sealmaster 101' or equal and approved tile adhesive:
jointed and pointed in 'sealmaster 201' grout: clean with approved
detergent and apply 'Johnson wax' polish: allow for tile spacers: in
D 32mm Floors: Finished to receive terrazzo floor finish m2 271 450.00 121,950.00
20mm thick coloured Polished Terrazzo floor finish in: including PVC
dividing strips:
E rooms m2 271 2,100.00 569,100.00
WALL FINISHES
Repairs on Walls and finishes
12mm Lime plaster: steel trowelled finish: on concrete or blockwork:
Externally: on
Sand and clean surfaces: apply one coat skimming compound as 'Wall
Magic or equal and approved: apply THREE coats ''Crown" Silk Vynil
Paint from "Crown" or "Jotun" or equal approved: on
13 1,209,690.00
Staircase Finishes;
20mm thick coloured Polished Terrazzo floor finish in: including PVC
dividing strips:
H Vertical edge : open string edge to steps 350mm (extreme) wide m 32 136.50 4,368.00
SECTION NO. 3
BILL NO. 1
PROJECT MANGEMENT
OCTOBER 2022 pc n pv
PROPOSED 12 NO CLASSROOM RENOVATION
FOR REHEMA ACADEMY
OCTOBER 2022 pc n pv
PROPOSED 12 NO CLASSROOM RENOVATION
FOR REHEMA ACADEMY
AT KISII , KISII COUNTY
FINAL SUMMARY PAGE
ITEM SECTION Amount (Kshs)
CONTINGENCY AMOUNT
………………..…………………………………… ……………….......……………………………………
SIGNATURE OF CONSULTANT SIGNATURE OF EMPLOYER
ADDRESS: ADDRESS:……………………...…………………………