Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

ELISEO Z BAYLEN ANGONO BUSINESS CENTER

0086 @ SITIO PINAGPALA ST M. L. QUEZON


SITIO PINAGPALA SAN ISIDRO ANGONO
ANGONO RIZAL TIN 000-101-528-000-VAT

NEAR ANTONIOS STORE Billing Statement No.: 3213020539684


Meter No.: 113BAG017930
Route Seq.: 3210 02 0005 Print Seq.: 177821 Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date
1497952605 19 Feb 2023
08 Jan 2023 to 07 Feb 2023 08 Feb 2023
Date of Meter Reading Electric Meter Number
07 Feb 2023 113BAG017930 Please Pay
Date of Next Meter Reading Current Reading
07 Mar 2023
Customer Type -
8,517
Previous Reading � 274.92
Residential 8,468
Actual Consumption
= Bill Computation Summary
Your rate this month 49 kWh Remaining Balance from previous bill 0.00
� 5.61 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)

Charges for this billing period 274.92


Generation 336.36
Please see the back page of your bill for more details about your
meter reading and consumption. Transmission 40.78
System Loss 30.49
Distribution (Meralco) 67.82
Subsidies -237.73

Your monthly 26.3ºC


Government Taxes
Universal Charges
26.28
10.92
FiT-All (Renewable) 0.00
consumption
Ave. temp this month
kWh 1.0 deg lower than prev.

Total Amount Due � 274.92

kWh 38 49 - - - - - - - - - -
21 1 - - - - - - - - 18 33
12 kWh 1.58 kWh � 8.87
Your consumption explained Ave.
Your typical
monthly Ave. consumption
daily Ave. daily
This bill is 29% higher (+11kWh) vs consumption consumption cost this bill
previous billing period (last 12 this bill period
months) period
This bill is more than 100% higher (+48kWh)
vs same period last year

Environmental Impact
Be energy efficient. Save and help take care of our environment

49 kWh 0.0349 tCO2* 2 tree/s**


Electricity Used Equiv. GHG Emissions To Offset Emissions

*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO2/kWh Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of customer metering facilities within your area this quarter.
CO2/year

Payment Instruction
jcbZ:uXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZsrXZlXZ accredited payment partner before the due date.
cazSXSRcbcP
1497952605 � 274.92
Bfw:eqJbeBfvwJJu:eVZVeYZUw
31n8mf73RpZ
CCSRjIB frX
Zs:ZB8H6GER
ucSZrdHPl1P
Payment made after 08 Feb 2023 will be reflected
QR code contains on your next bill.
your CAN.
BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 23020698062 Local Application No.: 770515776 Billing Period: 08 Jan 2023 to 07 Feb 2023 Print Seq. 177821 Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment Continued
Billing Period Posting Date Payment Channels Amount Paid
Rate Components Base Price Amount
08 Dec-07 Jan 2023 30 Jan 2023 Meralco Online � 218.24
Missionary Elec for REDCI 49 kWh 0.0017 0.08
08 Nov-07 Dec 2022 30 Dec 2022 Meralco Online � 181.29
Environmental Fund 0.00
08 Oct-07 Nov 2022 30 Dec 2022 Meralco Online � 9.60 NPC Stranded Contract Costs 0.00
08 Sep-07 Oct 2022 30 Dec 2022 Meralco Online � 5.64 NPC Stranded Debts 49 kWh 0.0428 2.10
08 Aug-07 Sep 2022 10 Sep 2022 Bayad Partner � 5.64 DU Stranded Contract Costs 0.00
08 Jul-07 Aug 2022 10 Sep 2022 Bayad Partner � 5.64 Equalization Taxes & Royalties 0.00
Other bills paid on 10 Sep 2022 amount to � 11.28
FiT-All (Renewable) 0.00% 0.00

What remains unpaid FiT-All (Renewable)

Energy Bill Amount


0.00

No unpaid bill, thank you!


Base VAT
VAT Sales 239.20 24.80

How your bill was computed VAT Zero Rated


Non-VAT
0.00
10.92

Service ID Number: 436461660101 Total Energy Amount 274.92


Contract Holder: BAYLEN, ELISEO Z
Service Address: 0086 @ SITIO PINAGPALA SITIO PINAGPALA SAN Charges for this billing period � 274.92
ISIDRO ANGONO RIZAL
Additional Bill Information
Metering Information Voltage Level Class : Secondary
Previous Current
Meter Number Reading Multi Registered Previous Service ID Number (SIN) : 787959101
Reading
113BAG017930 8468 8517 1 49 kWh Your rate this month (price per kWh) is computed as Total Energy Amount
divided by the Actual Consumption (in kWh)
Note: The average temperature for the month represents the reading from
the PAG-ASA weather station in Quezon City, Metro Manila.
Rate Components Base Price Amount
Generation 122.35% 336.36
Generation Charge (PhP/kWh) 49 kWh 6.9154 338.85
Power Act Reduction 0.00
ACRM (PhP/kWh) 49 kWh -0.0723 -3.54
ICERA (PhP/kWh) 49 kWh 0.0215 1.05

Transmission 14.83% 40.78


Transmission Charge(PhP/kWh) 49 kWh 0.8322 40.78

System Loss 11.09% 30.49


System Loss Charge (PhP/kWh) 49 kWh 0.6223 30.49

Distribution (Meralco) 24.67% 67.82


Distribution Charge (PhP/kWh) 49 kWh 0.9803 48.03
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 49 kWh 0.3351 16.42
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 49 kWh 0.4980 24.40
Dist True-Up 4 (PhP/kWh) 49 kWh -0.8656 -42.41

Subsidies -86.47% -237.73


Lifeline Discount 475.45 -50.00% -237.73

Government Taxes 9.56% 26.28


Current RPT (PhP/kWh) 49 kWh 0.0059 0.29
Local Franchise Tax 238.01 0.5000% 1.19
VALUE ADDED TAX
Generation Charge 338.85 11.0100% 37.31
Power Act Reduction 0.00
ACRM -3.54 7.8000% -0.28
ICERA 1.05 17.3300% 0.18
Transmission Charge 40.78 10.9000% 4.45
System Loss Charge 30.49 11.0000% 3.35
Distribution Charge 67.82 12.0000% 8.14
Subsidies and Others -236.25 12.0000% -28.35

Universal Charges 3.97% 10.92


Missionary Elec for NPC-SPUG 49 kWh 0.1783 8.74

Tips for hassle free payment


Automatic Debit Arrangement (ADA)
Bring your electric bill every time you pay Authorize your bank to debit the bill amount from your account on the bills due date and remit the
payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of these accredited ADA partners.
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Asia United Bank Philippine National Bank Robinsons Bank
Banco de Oro (BDO) Union Bank of the Philippines Citibank
Pay on or before due date Bank of the Philippine Islands (BPI) United Coconut Planters Bank Security Bank
Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
ccbSSRuySTvxuaaaP
website or any of our social media channels. fvZMG78rncSJLTrfP
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
bDFRbJmSBL;fzJz58
ey qDiTrsyBQl69U2
ffjSPySe;1pVwABI
j6VMSKtrRJgz4YGFP Consumer Affairs Service (CAS) through:
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5389
(Office hours, Mon-Fri except holidays)

You might also like