Bulb I
The Bulb I (BI51, BI63 and BI75) is a less commonly used ODOT standard girder for medium to long length span bridges. It utilizes the BT section with the deck
blocked in to achieve difficult site requirements such as heavy super elevations and vertical curves. Allows girders to be placed closer together for major skews and
difficult on site deck pours. Typical users of the design include:

Washington Department of Transportation (WSDOT), Oregon Department of Transportation (ODOT), Idaho Transportation Department (ITD), Montana Department
of Transportation (MTD), Alaska Department of Transportation (ADOT), United States Forest Service (USFS)

Span Length

BI51 70′ - 110′

BI63 85′ - 130′

BI75 105′ - 140′

70′ 82′ 94′ 106′ 118′ 130′ 142′

Span Length

Section Properties (gross)


Product Name Depth (in) Area (in2) Yb (in4) Ixx (in4) Iyy (in4) PLF @ 165

BI51 51" 566 25.2 191444 16303 650


BI63 63" 638 31.1 327551 16519 733

BI75 75" 710 37.1 509572 16735 815

Manage consent
‹ ›

Product Information
The Bulb I (BI) girder is a standard variation of the Bulb-T girder. Use the BI shape only when it has benefits over a Bulb-T girder. Since the BI girder have a narrower
top flange, it requires less concrete build-up than a Bulb-T. Therefore bridges with high super elevations (generally, greater than 7%) may want to consider the BI
girder.

‹ ›

Standard Design Options


Forming and Diaphragm Inserts.
Adjust web thickness to accommodate post-tensioning (for spliced girders). For such cases increase the web thickness from 6″ to 7.5″
Cast in inserts or hole for diagraph reinforcing
Cast in inserts for mounting utility brackets
Manage consent
Top flange/web holes for mounting deck forming brackets

3D Viewer
3D Viewer Tools

3D Viewer Functions:
Move, Span, Zoom Assemblies
Isolate Single Components in View
Explode Assembly Single Components
Use Markup to Sketch Details
General Measurements for Concept
Print Views

▴ ▴ ▴
w v A f d   S o e

 Open in Fusion 360


C r n i

Need More Info?


We Are Here to Help

Have a question, need a budget or detailed schedule? Knife River sales team is
ready to discuss precast solutions for your project. Reach out to our staff below :

Eric Holje
Bridge Estimator

eric.holje@kniferiver.com
(509) 536-3323
LinkedIn

Sam Jewell
Manage consent
Outside Sales Representative

sam.jewell@kniferiver.com
(541) 221-8599
LinkedIn

Product Family
See featured product related to Bulb I assemblies

All Products →

AASHTO Girder
AASHTO sections are typically used for railroad, or other private entity, bridge construction
when a standard wide flange (WF) girder section does not meet the project design criteria. The
top flange of AASHTO shaped girders is not as wide as standa...

View Product →

Box Beam
Box Beams are typically used for 80′-118′ bridge spans. The design allows for a typical 4′ width
section to include integral voids which reduce the product weight and are often used when box
depth and speed of construction are part ...

View Product →

Bridge Substructure
Accelerated Bridge Construction utilizes precast bridge substructure products. Total precast
abutments, bent caps, pile caps and wingwalls offer many advantages. They can be precast to
precise specifications of the design in a plant controlled settin...

View Product →

Manage consent
Voided-Solid Slabs
Voided Slabs are typically used for 15-85′ bridge spans but can be used in building applications
where significant design loads are required. Voided slab design allows for a typical 4′ width slab
to include integral voids which reduce the...

View Product →

Bulb T
The Oregon Bulb-Tee (BT) girder is the preferred choice for most Oregon medium to long span
bridges requiring a CIP deck. Bulb Tee precast/prestressed girders are typically used in spans
from 60-185′ with significant loading.

View Product →

Deck Bulb Tee


Deck Bulb Tee Girders combine a precast deck with the traditional I-Girder design. This design
offers the advantage of an immediate driving surface, or alternatively, a roughened surface that
allows for the addition of a secondary overlay or a Cast-I...

View Product →

Tri-Deck
Tri-Deck girders are an adjustable top flange width, multi-stemmed unit designed for full deck
use. Tri-Deck bridges are typically used for bridge spans from 30′-52′ which require a longer
span and lower profile section. Typically Tri-Dec...

View Product →

Manage consent
WF Girder
The wide flange (WF) girder is the primary bridge girder section used by Washington State
Department of Transportation (WSDOT) and Idaho Transportation Department (ITD). WF
Girders are typically used in spans of 70-200’ using sections ranging from 36...

View Product →

Projects

Commercial Industrial

Manage consent
Institutional Residential

Transportation

7721 N. Idaho Rd. 23505 Peoria Road


Newman Lake WA 99025-9469 Harrisburg OR 97446
509.536.3300 541.995.4100

Quick Links Follow


Projects Learning Center Instagram
Products Contact Facebook
Portfolio Company LinkedIn
Services Careers YouTube
Finishes Our Team

Knife River Prestress ©2023. All Rights Reserved

Disclosure Legal Privacy Policy

Manage consent

You might also like