Download as pdf
Download as pdf
You are on page 1of 1
E.B. TESTING CENTER, INC MATERIALS TESTING AND GEOTECHNICAL ENGINEERING LABORATORY epee Date April 14,2023 Lab, Report No. BU-23041 10708 Page Tot TEST REPORT ON REINFORCING STEEL Project: + 23H1.0063 Organizational O igure Safe and Reliable National Road System: Asset Preservation Program: Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads-Tertiary Roads: Bayawan-Kabankalan Road KO112-K000-K0112+500, Bayawan City, Negros Oriental Location + Bayawan City, Negros Oriental Client = GROUND UP CONSTRUCTION AND SUPPLY Kind of material 10mm0 (RSB) Sample identification: 23111 0063-404(1)a-RSB10-QT-1 Quantity represented 30,000 Kes. + Contractor's Bodega ot Stated ‘Supplied by Ground Up Construction and Supply Proposed use Reinforcing Steel Bar, Grade 40, ‘Spec's Item No. 404(1)a Sampled by Karen Joy H. Diuo-ME. DPWH-NOED IIL April 07, 2023, (ame & Designation) (omfice) (Date) Submited by Virginia C. Catipay-Enge It DPWH-NOED IIL April 08, 2023 (Name & Designation) (opfes) (Pate) Diameter of sample (nn 10 TESTS REQUIREMENTS RESULTS Tensile Properties: Yield Potnr, kn/mon? (Pst) 280 Min, 357 Tensile Strength, — knnn (Psi) 420 Min, 322 Elongation, % 16 Min. 2.00 Irs /¥S Ratio 1.464 Bending Properties: No Cracking, No Crack Degree bent, 180 degrees 180 180 Actual Unit mass, kgm 0617 0.390 Variation in mass, % +6 ABS Deformation, mm Ave. Spacing of Lugs, mm. 7.0 Max. 660 Ave. Height of Lugs, mm. 04-08 0.60 ‘Sum. Gaps of Lugs, mm. 7.8 Max 440 [Phosphorous Content, % 0.06 Max, 0.020 Remarks: I es submitted and tested to E. B, TESTING CENT Responsible fr test only, [Fested by = |Checked by : brimessed by: (TESTED BY: Joseph V, Torres/Karen Joy H. Dino! Virginia C, Catipay ME, Contractor ME, DPWH-NOED IH’ Engr IILDPWH-NOED Il Lepore Na

You might also like