Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

STEP DRAWDOWN TEST

Tube-well Num. TW-09 Date & Time (Start) 14-May-23 8.00 am


Location Banting Date & Time (End) 14-May-23 13.00 pm
Client Wilmar Palm Products Sdn Bhd
Well Depth 106.0 m Pump Position 53.0 m
Collar Height 0.9 m Static Water Level 5.50 m
Pump Rate 7.8 m3/hr – 22.6 m3/hr

PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASE 5


3 3 3
Q = 7.8 m3/hr Q = 10.7 m /hr Q = 14.0 m /hr Q = 18.1 m /hr Q = 22.6 m3/hr

Time
(minutes) Water Level Drawdown Water Level Drawdown Water Level Drawdown Water Level Drawdown Water Level Drawdown
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m)

0.00 5.50 0.00 5.75 0.25 6.50 1.00 6.87 1.37 7.46 1.96
0.30 5.75 0.25 5.96 0.46 6.60 1.10 7.22 1.72 7.98 2.48
1.00 5.75 0.25 5.99 0.49 6.60 1.10 7.23 1.73 7.91 2.41
1.30 5.75 0.25 6.00 0.50 6.60 1.10 7.23 1.73 7.91 2.41
2.00 5.75 0.25 6.00 0.50 6.61 1.11 7.23 1.73 7.92 2.42
2.30 5.75 0.25 6.00 0.50 6.62 1.12 7.23 1.73 8.05 2.55
3.00 5.75 0.25 6.00 0.50 6.63 1.13 7.23 1.73 8.05 2.55
3.30 5.75 0.25 6.00 0.50 6.63 1.13 7.23 1.73 8.05 2.55
4.00 5.75 0.25 6.00 0.50 6.64 1.14 7.24 1.74 8.08 2.58
4.30 5.75 0.25 6.02 0.52 6.64 1.14 7.24 1.74 8.09 2.59
5.00 5.75 0.25 6.02 0.52 6.64 1.14 7.25 1.75 8.09 2.59
7.30 5.75 0.25 6.09 0.59 6.66 1.16 7.25 1.75 8.11 2.61
10.00 5.75 0.25 6.09 0.59 6.67 1.17 7.26 1.76 8.13 2.63
15.00 5.75 0.25 6.10 0.60 6.70 1.20 7.27 1.77 8.15 2.65
20.00 5.75 0.25 6.19 0.69 6.72 1.22 7.30 1.80 8.19 2.69
25.00 5.75 0.25 6.20 0.70 6.74 1.24 7.35 1.85 8.20 2.70
30.00 5.75 0.25 6.23 0.73 6.77 1.27 7.38 1.88 8.25 2.75
35.00 5.75 0.25 6.25 0.75 6.78 1.28 7.38 1.88 8.26 2.76
40.00 5.75 0.25 6.26 0.76 6.78 1.28 7.39 1.89 8.29 2.79
45.00 5.75 0.25 6.32 0.82 6.82 1.32 7.40 1.90 8.30 2.80
50.00 5.75 0.25 6.39 0.89 6.84 1.34 7.41 1.91 8.32 2.82
55.00 5.75 0.25 6.41 0.91 6.86 1.36 7.46 1.96 8.35 2.85
60.00 5.75 0.25 6.50 1.00 6.87 1.37 7.46 1.96 8.37 2.87

You might also like