KANTOR PT. MTS SUMBAWA

BAGIAN BARANG BAGIAN JASA KETERANGAN


NO NAMA BARANG SATUAN QTY
SATUAN JUMLAH SATUAN JUMLAH
1 PANEL MDP : INCLUDE INCLUDE
- BOX PANEL 50X70
- MCB 3 PHASE
- MCB 1 PHASE
- AMPER METER 50/5
- CT AMPERE 50/5
- VOLT METER UNIT 1 4.750.000 4.750.000
- SELECT VOLT
- PILOT LAMP
- BUSBAR RELL
- BUSBAR SISIR
- DUCTHING PANEL
- NYAF 1,5 MM
2 PANEL SDP
- BOX PANEL 40 X 50
- MCB 3 PHASE
- MCB 1 PHASE
- REL MCB UNIT 1 3.050.000 3.050.000 INCLUDE INCLUDE
- PILOT LAMP
- DUCHT
- SKUN
- NYAF 1,5 MM
3 HANDLE PISAU BUAH 1 800.000 800.000 250.000 250.000
4 KABEL NYY 4X6 MM METER 15 57.500 862.500 20.000 20.000
5 DUCTING 50X50 BUAH 10 65.000 650.000 15.000 150.000
6 KLEM 20 MM PACK 3 45.000 135.000 INCLUDE INCLUDE
7 ISOLASI BUAH 4 10.000 40.000 INCLUDE INCLUDE
8 SKUN 16 MM BUAH 20 7.500 150.000 INCLUDE INCLUDE
SUB TOTAL 7.387.500 700.000
TOTAL 8.087.5000

Sumbawa, November 2023

MUSTAFA
RAB KWH METER
PT MTS SUMBMAWA

BP 16.048.500 X 2 = 32,961,000
SLO + JIL 1.500.000 X 2 = 3.000.000
17.548.5000 TOTAL : 35,961,000

Sumbawa, November 2023

MUSTAFA
PANEL UTAMA
KANTOR PT. MTS SUMBAWA

BAGIAN BARANG BAGIAN JASA KETERANGAN


NO NAMA BARANG SATUAN QTY
SATUAN JUMLAH SATUAN JUMLAH
1 PANEL MDP :
- BOX PANEL 40X60
- MCB 3 PHASE
- MCB 1 PHASE
- REL MCB
- PILOT LAMP
- BUSBAR RELL
- BUSBAR SISIR UNIT 1 4.450.000 4.450.000 INCLUDE INCLUDE
- DUCTHING PANEL
- NYAF 1,5 MM
- AMPER METER
- CT AMPER
- VOLT METER

2 HANDLE 32 AMPERE BUAH 1 475.000 475.000 250.000 250.000


3 NYAF 4 X 2,5 MM METER 30 41.000 1.230.000 15.000 450.000
SUB TOTAL 6.155.000 700.000
TOTAL 6.885.000