CBP INSTALLATION PROJECT HANDOVER

PROJECT TITLE PROJECT MANAGER

CBP Assembling, Erection & Installation Name, Sign & Date: -

PLANNED PROJECT
PLANNED WORK
COMPLETION DATE
CLOSEOUT DATE

ACTUAL WORK ACTUAL PROJECT


COMPLETION DATE CLOSEOUT DATE

ID ACTIVITY OWNER DUE DATE STATUS COMMENTS

Welding steel plate twins shaft mixer stand


1
plate with concrete column

2 Welding & Assembling Skip hoist Steel rod

3 Excavating skip hoist hole

4 Skip hoist hole masonry construction

5 Welding & material hopper & accessories

6 Welding hand rail for mixer flat form


ID ACTIVITY OWNER DUE DATE STATUS COMMENTS

7 Install water line pipe & water pump

8 Install & fix load cells & electrical wires

9 Install main control cabinet

Install main power cables into power


10
generator

11 Testing all concrete batching plant parts

12 Testing & Commissioning

13 Trial Production up to 50m3 of Concrete