Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

1.

The phase of development process that aims to train the work force and to work out
any remaining problems in the production processes
A. testing and refinement
B. production ramp up
C. concept development
D. planning
2. This is a complete specification of the geometry, material, and tolerances of each unique
parts
A. system level design
B. prototype
C. testing
D. detailed design
3. Fill in the blanks - to search
During development process, planning starts from identifying (Customer needs)
4. Success or failure of the development process solely depend on the core team that
takes the major role/responsibilities of the project from planning, concept development,
concept development, prototype making, testing and final refinement
TRUE
FALSE
5. Fill in the blanks
Chopping board : integral architecture
Working table: modular architecture
6. For high risk products does not require intensive and early test and analysis because its
cost
TRUE
FALSE
7. Development process is based on meeting (customers) requirement -to search
8. It pertains to division of the product into subsystems and components, each with
functional specification
A. Prototype
B. system level design
C. testing
D. detailed design
9. ____ a set of technical guidelines that may be applied during the design of a product the
optimization of a specific aspect of design
A. Design for manufacturability
B. Design for assembly
C. Work design
D. Design for excellences
10. Fill in the blanks - to search
(Slot modular A) is a unique interfaces for attachment to base element
11. When an organization addresses an issue/problem to an existing product it is called
A. new platform
B. technology enhancement
C. derivative
D. product family
12. Organizational linkages are stated below except
A. product processing procedure
B. financial arrangement (resource allocation)
C. reporting relationships (to whom to contact/consult in case of problem)
13. A hybrid of functional and project organization is called ____
A. strict project organization
B. none of the above
C. matrix organization
D. strict functional organization
14. Fill in the blanks - to search
Concept development: Planning
System level design/Product architecture + Interactions
15. ____ is usually built with production-intent parts, processes and tested in either
consumer’s environment or designer’s environment - to search
A. detailed design
B. system level design
C. testing
D. prototyping
16. _____ describe the types of solution components that will be delivered and may also
describe the methodology that will be used to deliver those components
A. NEW
B. PLATFORM
C. SOLUTION
D. DERIVATIVE
17. (Slot modular A is a unique interface for attachment to have a base element - to search
18. In opportunities funnel, screening and filtering quality of ideas is significant that will lead
to few product concepts that the organization pursue resulting to few products in
release in the market
FALSE
19. Below are the techniques for generating opportunities EXCEPT one
A. follow personal passion
B. mind your own business only
C. Pull opportunities from capabilities
D. Imitate but improve
20. This is a portfolio of products to be developed by organization and the timing of their
introduction to the market. - to search
A. process mapping
B. marketing study
C. concept development
D. product plan
21. The firm finds a market opportunity and a technology to meet customers’ needs
A. market pull products
B. technology pull products
C. process intensive products
D. platform products
22. Integral architecture aims to increase performance and reduces costs for any specific
product model
TRUE
FALSE
23. Fill in the blanks - to search
Modular product architecture: (onal elements)
24. Fill in the blanks - to search
Bus modular A occurs when common interfaces between elements without a base
element
25. Which is not a benefit of having a product plan
A. costly products
B. capacity planning
C. proper timing of product release
D. better understanding of market size
26. Architecture choices define the sub-systems and modules of the product platform or
family.
TRUE
FALSE
27. Balance product portfolio is better explained in below statement EXCEPT one
A. Encourage team to work multiple projects at the schedule so that they may conflicts
B. Similar products is developed simultaneous within the organization is better because
resources are shared
C. Shared resource for similar products shall have definite schedule because affect
material, machine, manpower, methodology usage that may conflict and arise to delay
in schedule
D. Product scheduling shall consider availability of resources especially when materials/
machine/technology is unique and lead time is long
28. The complex product to developed, the longer Lead time of development, therefore
Development Cost is low - to search
TRUE
FALSE
What is the correct version of the indicated phrase
(therefore development cost is high)
29. Fill in the blanks - to search
(Concept development) represents the products features and functions and features
30. (Slot modular A) is a unique interfaces for attachment to a base element - to search

You might also like