A Fittings floor
1 عدد
1 90 "كوع زاوية 30
2 عدد
1.5 45 "كوع زاوية 2
10 عدد
مشتركT ''1 12
11 عدد
مشتركT ''1*1.5 5
16 عدد
مشتركT ''1.25*''1 1
17 عدد
0.5 ''نبل 10
18 عدد
0.5 ''محبس 10
19 عدد
0.5 ''طبة 111
20 عدد
1*''0.5 ''مسلوب 111
21 عدد
4*''2.5 ''مسلوب 1
22 عدد
1.25*''1.5 ''مسلوب 1
Page 1 of 4
MATERIAL REQUISITION
Project: Sodic
Date:18_3_2023
MATERIALS FOR MECHANICAL WORKS
Take Off Quantity Required Quantities
Vendor
Serial
Qty..
Material Description Unit Manufacturer Vendor Model Phase Phase Phase Remarks
LEVEL TOTAL 01 02 03
Delivery Date Authorized Signatures
Phase 01 Deliverd QA/QC Engineer Site Engineer Construction Manager
Phase 02 Deliverd
Phase 03 Immediately
Page 2 of 4