1. Outline of PBST SCR-HP

2. Components

3. Gas flow

4. Control System

5. Precautions at the time of outfitting

6. Maintenance

© 2020 MAKITA CORPORATION


© PBST – a brand of MAN Energy Solutions SE
2
1. Outline of PBST SCR-HP

2. Components

3. Gas flow

4. Control System

5. Precautions at the time of outfitting

6. Maintenance

© 2020 MAKITA CORPORATION


© PBST – a brand of MAN Energy Solutions SE
3
Principle of SCR system
Add ammonia (NH3) to nitrogen oxides (NOx) in the exhaust
gas and decomposes it into water (H2O) and nitrogen (N2).

【Decompose urea water into ammonia】


NH2CONH2→HNCO+NH3 ・・Thermal decomposition
HNCO+H2O→CO2+NH3 ・Hydrolysis

【Denitrification reaction】
4NO+ 4NH3+O2 → 4N2+6H2O
2NO+2NO2+4 NH3 → 4N2+6H2O
2NO2+4 NH3+ O2 → 3N2+6H2O

© 2020 MAKITA CORPORATION 4


SCR-HP outline
To Funnel

NOx
sensor
Scavenge air
MAIN
receiver
Air Compressed air module
compressor
pressure CBV EGB
reducing Air Reservoir T/C
device
Air Tank

RTV

Reactor
incl. RBV
Urea pump
module Mixing Unit

Urea RSV
tank Dosing unit
Exhaust gas
receiver

Urea water concentration is 40%


© 2020 MAKITA CORPORATION 5
Valves used in SCR system

RSV
Guides exhaust gas to the reactor

RBV
Cut the exhaust gas from the exhaust gas
receive to T/C.

RTV
Adjusting the exhaust gas flow rate
through the reactor

© 2020 MAKITA CORPORATION 6


Valves used in SCR system

RSV

RBV
RTV

CBV
Open the valve in a low load to
raise the exhaust gas
temperature

© 2020 MAKITA CORPORATION 7


SCR system fluid flow
Air compressor

Supply
Pump Supply
compressed Compressed air module
air for SCR
Module urea water
C3

P1

Catalyst
cleaning

Dosing unit Exhaust


gas Soot blower
D4 OUTLET
Urea injection lance

Urea tank リアクタ


Reactor
Adjust the amount of urea
water injection Exhaust incl.
and compressed air input gas Mixing Unit
INLET

SCR Control SCR system


Cabinet condition
monitoring
Air for SCR
Wall surface of hull 40% Urea water

© 2020 MAKITA CORPORATION 8


1. Outline of PBST SCR-HP

2. Components

3. Gas flow

4. Control System

5. Precautions at the time of outfitting

6. Maintenance

© 2020 MAKITA CORPORATION


© PBST – a brand of MAN Energy Solutions SE
9
PBST SCR-HP components
SCR-Reactor incl. Mixing Unit

soot blowers

Catalyst

Mixer Urea Injection


lance

NOx Sensor SCR Stanby Compressed Air Urea Dosing Urea Pump
Auxiliary Heating Reservoir Unit Module
Cabinet Cabinet

© 2020 MAKITA CORPORATION 10


Compressed Air Reservoir

・Supply of compressed air for Soot blower


・Supply compressed air for spraying urea water

Soot blower
Dosing Unit
Compressed Air
Uses air that meets
ISO8573-1︓2010

Particle class 3
Humidity class 4
Oil class 2

© 2020 MAKITA CORPORATION 11


Pump Module
・Pressurize urea water to Dosing Unit
・Properly maintain the pressure of the urea water system(about 8 bar)

Operation status
can be confirmed
with a lamp

Dosing Unit
Pump

filter

Urea tank

© 2020 MAKITA CORPORATION 12


Dosing Unit
Adjust the compressed air amount and urea water amount
according to the operating conditions of the main engine

Compressed Urea Injection


Air Module lance(Air)
(Air)
Urea Injection
lance(Urea)
Pump Module
(Urea)

© 2020 MAKITA CORPORATION 13


Urea injection lance

Urea water is sprayed into the reactor (assisted by air)

Dosing Unit
(Air)

Use spiral gasket


and attach it to the
reactor
Dosing Unit
(Urea)

Reactor

© 2020 MAKITA CORPORATION 14


Trace heating cabinet

Temperature adjustment is important for SCR system


denitration reaction! Keep the temperature inside the
reactor at about 200℃ when moored.

A heating wire is installed in the reactor


to maintain the internal temperature

© 2020 MAKITA CORPORATION 15


SCR Reactor

Exhaust gas outlet


Urea water inlet

Exhaust gas inlet

Maintenance
manhole

Air inlet for


soot blower

© 2020 MAKITA CORPORATION 16


NOx sensor & NOx Junction Box
Equipped in the stack after the turbocharger
exit in order to check the denitration rate

NOx Junction box

To SCR NOx Cabinet

Equipped with two


types of NOx sensors

© 2020 MAKITA CORPORATION 17


Aux. Control cabinet
The interface between the electronic control system for
SCR and the equipment of SCR manufacturer
Compressed Air
Reservoir Module
Dosing Unit
Touch panel type
「SaCoS monitor」 Standby Heating Cabinet

Pump Module

Sensor for SCR

Soot blower
Monitor the status of SCR
manufacturer’s equipment
SCR-CU

© 2020 MAKITA CORPORATION 18


1. Outline of PBST SCR-HP

2. Components

3. Gas flow

4. Control System

5. Precautions at the time of outfitting

6. Maintenance

© 2020 MAKITA CORPORATION


© PBST – a brand of MAN Energy Solutions SE
19
Operation image
General sea area→ECA (Tier II mode → Tier III mode)

General sea area ECA

・Change fuel oil Heating Start of SCR Finish of


using exhaust gas operation SCR
(VLSFO→ULSFO)
(1-2 hours)) operation
・Change cylinder oil

Start heating after the completion of switching fuel


© 2020 MAKITA CORPORATION 20
Operation image
ECA→ General sea area (Tier III mode → Tier II mode)

General sea area ECA

Finish of Start of Heating Electric heating


(heat retention
・Change fuel oil SCR SCR Using while mooring)
(VLSFO→ULSFO) operation operation exhaust gas
(1-2 hours))
・Change cylinder oil

© 2020 MAKITA CORPORATION 21


Operation-Tier II mode
Venting system
Prevents catalyst clogging
Supply fresh air to the reactor in order to
prevent exhaust gas from entering To Funnel
Scavenge air
MAIN the SCR line and clogging the catalyst
receiver
Air Compressed air module
compressor
pressure CBV EGB
reducing Air Reservoir T/C
device

Fully closed
RTV
Fully closed
Reactor
incl. RBV
Urea pump
module Mixing Unit Fully open

Urea RSV
tank Dosing unit
Exhaust gas
receiver
Fully closed

© 2020 MAKITA CORPORATION 22


Operation-Tier II mode→Tier III mode
Heating mode
Warming up the SCR

To Funnel
Scavenge air
MAIN
receiver
Air Compressed air module
compressor
pressure CBV EGB
reducing Air Reservoir Opening T/C
device adjustment
Air Tank

RTV
Slight opening
Reactor
incl. RBV
Urea pump
module Mixing Unit Fully open

Urea RSV
tank Dosing unit
Exhaust gas
receiver
Fully open

© 2020 MAKITA CORPORATION 23


Operation-Tier III mode
SCR run mode

To Funnel
Scavenge air
MAIN
receiver
Air Compressed air module
compressor
CBV
pressure EGB
reducing Air Reservoir T/C
device
Air Tank

RTV
Fully open
Reactor
incl. RBV
Urea pump
module Mixing Unit Fully closed

Urea RSV
tank Dosing unit
Exhaust gas
receiver
Fully open

© 2020 MAKITA CORPORATION 24


Operation-Tier III mode
SCR run mode
Low load operation
Bypass a part of scavenging air from CBV valve
to exhaust gas line To Funnel
(Countermeasure to increase exhaust gas temperature) Scavenge air
MAIN
receiver
Air Compressed air module
compressor
pressure CBV EGB
reducing Air Reservoir T/C
device
Air Tank

RTV
Fully open
Reactor
incl. RBV
Urea pump
module Mixing Unit Fully closed

Urea RSV
tank Dosing unit
Exhaust gas
receiver
Fully open

© 2020 MAKITA CORPORATION 25


Operation-Tier III mode
SCR stop

When the SCR inlet temperature falls below


the required temperature, the SCR stops operating To Funnel
(When entering the port, the main engine Scavenge air
MAIN
will stop after the SCR stops) receiver
Air Compressed air module
compressor
pressure CBV EGB
reducing Air Reservoir T/C
Fully closed
device
Air Tank

After the SCR operation RTV


is finished, the urea water Fully closed
line is flushed with air. Reactor
incl. RBV
Urea pump
module Mixing Unit Full open

Urea RSV
tank Dosing unit
Exhaust gas
receiver
Fully closed

© 2020 MAKITA CORPORATION 26


Mooring
Heating mode
Keep the reactor warm

To Funnel
Scavenge air
MAIN
receiver
Air Compressed air module
compressor
pressure CBV EGB
reducing Air Reservoir T/C
Fully closed
device
Air Tank

RTV
Fully closed
Reactor
incl.
Electric heating RBV
Urea pump to keep the Reactor
module Mixing Unit Fully closed
at about 200℃

Urea RSV
tank Dosing unit
Exhaust gas
receiver
Fully closed

© 2020 MAKITA CORPORATION 27


SCR Shut down
SCR shut down
Stops SCR operation in case of abnormality

Valves other than CBV are fully opened


for abnormalities where exhaust gas To Funnel
may not flow to the T/C. Scavenge air
MAIN
receiver
Air Compressed air module
compressor
pressure CBV EGB
reducing Air Reservoir T/C
device Fully closed
Air Tank

RTV
Fully open
Reactor
incl. RBV
Urea pump
module Mixing Unit Fully open

Urea RSV
tank Dosing unit
Exhaust gas
receiver
Fully open

© 2020 MAKITA CORPORATION 28


contents

1. Outline of PBST SCR-HP

2. Components

3. Gas flow

4. Control System

5. Precautions at the time of outfitting

6. Maintenance

© 2020 MAKITA CORPORATION


© PBST – a brand of MAN Energy Solutions SE
29
Control System
Bridge RCS/BMS

C/R
ECS MOP EMS MOP ERCS MOP

Adjustment and monitoring Main engine Adjustment and monitoring


of ME System condition monitoring of SCR System

E/R ERCS Aux. Control


ME-ECS
Cabinet

SCR control
ME control
SCR monitoring

© 2020 MAKITA CORPORATION 30


ECS-MOP screen (Control of the SCR system)

Heating is performed automatically (no urea injection).

Heating and dosing are performed automatically.

© 2020 MAKITA CORPORATION 31


Engine Mode (TierⅡ → TierⅢ)

Select

Operation sequence (TierⅡ → TierⅢ)

Each valve open Heating Flushing Dosing

(RSV:Open, RTV:Open, (Heating of the reactor (Air flushing of the (Injection of urea
RBV:Close) by exhaust gas) injection lance) water)

Approx. 2 hours 5 mins


TierⅡ running TierⅢ running

© 2020 MAKITA CORPORATION 32


Engine Mode (TierⅢ → TierⅡ)

Select

Operation sequence (TierⅢ → TierⅡ)

Dosing Flushing Each valve Close

(Injection of urea (Air flushing of the injection (RSV:Close, RTV:Close,


water) lance) RBV:Open)

5 mins

TierⅢ running TierⅡ running

© 2020 MAKITA CORPORATION 33


Prepare SCR (Enable → Disable)

Select
Operation sequence (Enable → Disable)

Each valve open Heating Dosing Enabling

(RSV:Open, RTV:Open, (Heating of the reactor (Always ready for


RBV:Close) by exhaust gas) Dosing)

Approx. 2 hours

TierⅡ running

© 2020 MAKITA CORPORATION 34


Prepare SCR (Disable → Enable)

Select

Operation sequence (Disable → Enable)

Each valve Close

(RSV:Close, RTV:CLose, RBV:Open)

TierⅡ running
© 2020 MAKITA CORPORATION 35
contents

1. Outline of PBST SCR-HP

2. Components

3. Gas flow

4. Control System

5. Precautions at the time of outfitting

6. Maintenance

© 2020 MAKITA CORPORATION


© PBST – a brand of MAN Energy Solutions SE
36
Urea injection lance

1. Mounted with bolts and nuts


2. Install the lance carefully so that
it does not touch the inner wall
of reactor

Reactor

© 2020 MAKITA CORPORATION 37


Mounting and wiring the sensor
※Regarding the TT6607, it is a sensor for ERCS,
so it is wired not on the JME of the reactor leg
but on the circuit board at the engine side.

Temperature sensor for SCR


TT6607

Handling
temperature sensor

© 2020 MAKITA CORPORATION 38


Precautions for handling the SCR reactor
Exhaust gas temperature sensor
Do not turn the head part! The tip part
is delicate

Attach and detach at this part

1. The tip (temperature sensitive part) is extremely delicate


2. The head part will be damaged if it is accidentally turned.
3. Installed in 7 places of the main engine and 1 in 1 place of reactor

© 2020 MAKITA CORPORATION 39


Precautions for handling the SCR sensor
Environmental sensor (combined sensor)

Detection unit

1. Installed under the Turbocharger silencer


2. Be careful of damage because the detector is exposed

© 2020 MAKITA CORPORATION 40


Main sensor position for HPSCR

Temp. sensor

Temp. sensor Temp. sensor

Combined sensor

© 2020 MAKITA CORPORATION 41


Handling of urea water
Urea water shelf life (ISO18611-3)
Storage Retention 40% urea water crystallizes
temperature period below 0℃, so store
0 ~ 25℃ 18months it above 5℃.

25 ~ 30℃ 12months Can be used if the alkalinity


is guaranteed even after
30 ~ 35℃ 6months the expiration date.

35 ~ 55℃
Inspection Landing disposal of urea water.
before use

Use of urea water production equipment


Can be used if the urea water produced by the urea water production
equipment meets the ISO18611 standard.

© 2020 MAKITA CORPORATION 42


Handling of urea water
Safety/security device

At least, the following appropriate protective equipment/equipment


shall be provided to protect crews.

Chemical resistance coverall Face wash

Chemical resistance gloves Safety shower

Chemical resistant safety Self-contained breathing


apparatus (Those that fulfill the
shoes function of 30 minutes)

Face shield with chemical


Stretcher
resistance
※*Refer to Annex D1.3.1-5(1) of NK Rule

© 2020 MAKITA CORPORATION 43


contents

1. Outline of PBST SCR-HP

2. Components

3. Gas flow

4. Control System

5. Precautions at the time of outfitting

6. Maintenance

© 2020 MAKITA CORPORATION


© PBST – a brand of MAN Energy Solutions SE
44
Catalyst replacement
Work image

Catalyst
Size:250x250x620mm
Weight︓25kg/1PC

Precaution
※When opening the SCR reactor and working insider or around….
After adequate ventilation, check with a carbon monoxide detector
before work and work with two or more people.
Provide adequate ventilation during internal work.

Possibility of accumulation of toxic carbon monoxide inside the SCR reactor

© 2020 MAKITA CORPORATION 45


Handling of catalyst
Work around the catalyst
• There are toxic substances on the surface of the catalyst
and inside the reactor.

• Equipped with appropriate protective equipment to prevent


inhalation and direct skin contact.

Safety shoes Goggles

Helmet Hearing protection

Protective clothing Dust mask (DS3)

Gloves Carbon monoxide detector

© 2020 MAKITA CORPORATION 46


State of catalyst removal
Step1 Step2
Set the tool and pull out Support with chain
block and pull out

●Extraction tool
Push the handle and then the back side opens

Surface Back
© 2020 MAKITA CORPORATION 47
Thank you for your attention

© 2020 MAKITA CORPORATION 48

You might also like