planned breaks 100 hr min

unplanned 110 shift 8 480

workstation cycle time


welding 2.5
painting 3
assembly 1.5 CYCLE TIME 12
inspection 1
packaging 0.5
mateirla handling 1.5
quality control 2
PPT 380
Available time 270
Actual output 22.5
ideal output 31.6666667
Producitvity 0.71052632 Welding
Availability 0.71052632
defects 1.125
Quality 0.95
OEE 47.9605263

Max Cell Capacity 40 38.875

TAKT TIME-month 1 56.7


crewsize- month 1 4.44444444 TAKT = Available time / Demand

TAKT TIME-month 2 28.35


crewsize-month 2 8.88888889

TAKT TIME-month 3 37.8


crewsize-month 3 6.66666667
reem Al Kayyali YDP9UY
Cindhy Jazmin Chamorro BV8APY

ding Painting Assembly Inspection


Packaging
+
Inspection Material Quality Control
Handling
ty Control