DSM-200520-SP-10 Recommended Implementation Plan For Basic Data
DSM-200520-SP-10 Recommended Implementation Plan For Basic Data
Version: 1.0 Date: April 2010 Custodian: DME/4 ECCN: EAR99 Page: 1 of 7
This Specification is a Recommended Implementation Plan for the Downstream Manufacturing (DSM)
documents listed below. This document contains suggested implementation information that may be
used for input and tailored for use when developing the outline for a generic implementation schedule
and site plan for and assessment of the potential impact of the implementation of a Controlling
Document.
DSM-2005020-ST Basic Data
2. Introduction
1. The Controlling Document(s) provides requirements that govern the generation, reporting and
ownership of Basic Data from key units at Downstream Manufacturing (DSM) sites.
2. The objective of the Controlling Document(s) is for DSM sites, in particular site Manufacturing
Technology groups, to be accountable to validate that the Basic Data is accurate and reflects the
plant operation. The purpose of this ST is to assist the DSM sites to maintain and improve (where
appropriate) the quality of information that is placed into planning, scheduling and accounting tools
for optimal operation of sites within safe operating and emission limits. This in turn improves the
quality of site plans, schedules, operating instructions, catalyst selection and ultimately the
profitability of DSM sites.
3.1 General
Version: 1.0 Date: April 2010 Custodian: DME/4 ECCN: EAR99 Page: 2 of 7
Reduction of risk? Risk been quantified using the Risk Assessment Matrix? Yes No
If yes, specify
Does this replace any other Standards and/or Controlling Documents? Does this impact a
portion of an existing Controlling Document? Yes No
If yes, specify the Standards and Controlling Documents that are replaced. Is there a plan to
withdraw the impacted Controlling Documents? Also, specify how this is being communicated
to the Sites?
Version: 1.0 Date: April 2010 Custodian: DME/4 ECCN: EAR99 Page: 3 of 7
The information in this section should be linked to the information contained in the Competency
Section later in this Recommended Implementation Plan.
Are training requirements identified? Yes No
Training material available? Yes No
If yes, specify
The Global Project Lead is developing implementation plan and site roll-out pack.
Is training needed one time as part of implementation? Yes No
Should new personnel or others new to this role get this training? Yes No
How often should training be done?
Initially with roll out and, subsequently, when someone new to the role is being trained as
replacement.
Objectives of training?
Gain understanding of requirements of ST.
What are training target audiences?
Basic Data Coordinator, Site Technology Manager
Preferred training medium?
Initially a centrally coordinated telecom, but after roll out by conducted by site personnel.
Are there recommended Site specific plans for implementation, such as recommended specific
milestones during implementation, identified implementation resources, recommended timing,
and/or Site specific roles that may be dependent on site size, etc.?
Yes No
If yes, specify
There is no centrally driven site specific plan; complete implementation for all sites is expected
by YE 2011.
Site implementation should be driven by the gap assessment that each site should do against
the ST, and implementation timing should be set using the Site Business Improvement Plan
(BIP). A gap assessment spreadsheet that may be used to assist with the gap assessment is
available on the ST’s MMS web page.
Regional teleconferences with impacted site personnel are planned by ME&S to clarify
requirements.
Version: 1.0 Date: April 2010 Custodian: DME/4 ECCN: EAR99 Page: 4 of 7
4. Recommended Competency
Version: 1.0 Date: April 2010 Custodian: DME/4 ECCN: EAR99 Page: 5 of 7
Mastery
N/A
What are the recommended initial implementation assessment plans to ensure the Standard and
Supporting Controlling Documents have successfully been implemented and are effectively being used?
Who should perform the assessment? Suggested assessment questions?
Specify
Telecons to site nominated Basic Data Coordinators from Central Project Lead asking about BIP stage
gates.
Applicable Region(s)
All Other
If Other, specify
Any Sites where implementation or all or part of this Controlling Document(s) is legally
mandated? Yes No
If yes, specify
Version: 1.0 Date: April 2010 Custodian: DME/4 ECCN: EAR99 Page: 6 of 7
N/A
Version: 1.0 Date: April 2010 Custodian: DME/4 ECCN: EAR99 Page: 7 of 7