SITE NAME: PUBLIC PROSECUTOR'S OFFICE SITE MAIN CONTRACTOR GHANTOOT TRANSPORT & GENERAL CONTRACTING LLC
SITE ENGINEER: ABDUL RAHMAN.S.A COMPLAINT LIST NO: FSPPO COMPLAINT-001 DATE OF PREPARATION: 28/04/2022
MONTH OF: APRIL
GRID
S.NO LOCATION SPACE SPECIFICATION COMPLAINT DETAILS COMPLAINT DATE STATUS CORRECTED BY COMPLETION DATE
ALPHA NUMERIC
DRIVERS
WASHROOM & Fall Ceilng tiles fell down because of GHANTOOT
3 B1 EF 10-12 ELECTRICAL 27/02/2022 RECTIFIED 28/03/2022
LOCKERS chws leakage. Electrical Team
B1-13
GYM
4 B1 CE 05-06 HVAC Leakage from FCU drain pipe. 09/04/22 RECTIFIED FS AR 09/04/22
B1-53
ENTRANCE
Sliding door is got stuck on its rail. Not
14 GF VESTIBULE D 07-08 ELECTRICAL 04/10/2022 RECTIFIED GHANTOOT 26/04/2022
properly opening/closing.
GF-01
ENTRANCE
Sliding door is got stuck on its rail. Not
16 GF VESTIBULE D 07-08 ELECTRICAL 30/04/2022 RECTIFIED GHANTOOT 30/04/2022
properly opening/closing.
GF-01