Report For Chairman
Report For Chairman
Date: 14-Feb-23
Prepared by: Stanley Ankrah Twumasi/Kingsley Abugri
Agency
Suggested time to Departments Needing
Project Lagging Factors Lag Cause of Lag Suggestion to improve
complete problem
Responsible for
Lag
Cooperation
Community Road Diversion Lagging factor 1 Project behind schedule Contractor Contractor to provide action plan ASAP Contractor construction department and Rabotec
Upgrade and Landfill Site
EXTERNAL ROOFING,
EXTERNAL ROOFING,
BLOCK 2 ROOFBEAM
WORKS PLASTERING
Construction of 108 EPCM Camp Buildings
EXTERNAL
BLOCK 3 BLOCKWORK ROOFING
WORKS
EXTERNAL
BLOCK 4 BLOCKWORK ROOFING
WORKS
increase resources
EXTERNAL
BLOCK 5 BLOCKWORK ROOFING
WORKS
FLOOR
EXTERNAL
BLOCK 6 BLOCKWORK CONCRETE,
WORKS
BLOCKWORK
FLOOR
EXTERNAL
BLOCK 7 BACKFILLING CONCRETE,
WORKS
BLOCKWORK
FLOOR EXTERNAL
BLOCK 8 BLOCKWORK
CONCRETING WORKS
FLOOR
CONCRETING EXTERNAL
BLOCK 9 CONCRETE,
GROUND BEAM WORKS
BLOCKWORK
BASELINE REMEDIAL
PROJECT BLOCKS PROGRESS LOOK-AHEAD CHALLENGES PICTURES
TARGET ACTION
SUPERSTRUCTU EXTERNAL
BLOCK 3 ROOFING
RE WORKS
2-PERSON ACCOMODATION
SUPERSTRUCTU EXTERNAL
BLOCK 4 ROOFING
increase resources
RE WORKS
EXTERNAL
BLOCK 5 ROOF BEAM ROOFING
WORKS
EXTERNAL ROOFING,
BLOCK 6 ROOF TRUSS
WORKS PLASTERING
SUPERSTRUCTU SUPERSTRUC
BLOCK 8 ROOFING
RE TURE
SUPERSTRUC ROOFING,
BLOCK 9 ROOF TRUSS
TURE PLASTERING
SUPERSTRUC
Blk 10A floor concreting BLOCKWORK
TURE
FLOOR
SUPERSTRUC
Blk 10B Foundation works CONCRETE,
catch up
TURE
BLOCKWORK
FLOOR
Mesh for SUPERSTRUC
Blk 1A CONCRETE,
foundation TURE
BLOCKWORK
commence
SUPERSTRUC
Blk 2A floor concreting superstructure
TURE
blockwork
SUPERSTRUC
Blk 9A Foundation works BLOCKWORK
TURE
SUBSTRUCTU
Blk 14B Floor concreting BLOCKWORK
RE
BASELINE REMEDIAL
PROJECT BLOCKS PROGRESS LOOK-AHEAD CHALLENGES PICTURES
TARGET ACTION
FLOOR
PLUMBING
GYMNASIUM - WORKS
ROOFING CONCRETE,
BLOCKWORK
OFFICE &
COMMISSARY - BLOCKWORK ROOFING ROOFING
up
FLOOR
RECREATIONAL FOUNDATON
FACILITY - WORKS
MEP CONCRETE,
BLOCKWORK