Brosur SurPlus

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Reservoir Enhancement

Technology

“INDONESIAN TECHNOLOGY FOR THE WORLD”

Reservoir Performance Enhancement Technology Company


Reservoir Performance Enhancement Technology Company
and Field Implementation

Surplus is Solution by Chemical Modifier to Enhance reservoir performance in both Carbonate and Sandstone
Reservoirs. SurPlus has the ability to imbibe and alter the amount of energy in the rock surface or interfacial layers
of the system. Surplus is also a wetting agent that takes part on lowering adhesivity between rock and oil then promoting
the fluid distribution on rock surface. The imbibe oil droplet will gather to channel then reduce waterflow in the channel
and diverting the flow to oil bank.

technology

Imbibition can be defined as the process of absorbing a wetting phase into a porous rock or the capillary suction of a wetting
phase into a porous medium. It is also defined as the intake of a wetting phase into pore spaces of a porous media by capillary
force. This imbibition performance can convert unmovable oil become movable oil. It will increase production performance.

flow

Counter-Flow Occured in Imbibition .


Process Between Oil in the core and
SurPlus Solution in the cell.
Mixing Viscosity forms viscosified fluid describes a resistance and emulsion; Chemicals, formation water, and oil system
that has a certain viscosity value and alter the wettability. It increases the sweep efficiency by slowing or blocking the existing
water channel, that makes chemical goes to the oil bank at unswept area and brings the remaining oil to the producer.
this performance acting like polymer.

Reservoir services provides crucial design guidance through Reservoir Performance Enhancement Implementation.
We can assist clients with :
Reservoir Enhancement Pre- Selection
Simultanious
Injection

The stages of field implementation are recommended. The results of each stage will be successively evaluated
and become the consideration for the next stage, both for engineering knowledge and economical outcome.
At the end of each stages is a decision gate for the client to review work based on the promised deliverables
before deciding to move on the next stage.

You might also like