CHECKLIST OF REQUIREMENTS
HW GENERATOR REGISTRATION
1. Duly Notarized Affidavit attesting to the truth, accuracy and genuineness of all information,
documents and records contained and attached in the application *
2. Description of waste management plan *
3. Pollution Control Officer Accreditation Certificate *
4. Contingency and Emergency Plan *
5. Photographs of Hazardous Waste Storage Area *
6. Official Letter of Request *
7. Mass Balance of Manufacturing process
8. Analysis of waste(s)
9. Other relevant Information (e.g., planned changes in production process or output, comparison
with related operation)
10. Copy of Environmental Compliance Certificate (ECC) or Certificate of Non-Coverage (CNC)
11. Copy of Valid Permit to Operate (PTO)
12. Copy of Valid Discharge Permit (DP)
▪ Items marked with single asterisk (*) are required documents in the system.
▪ Environmental Compliance Permits are uploaded in the Company’s Profile