Start Up & Commissioning

Bühler Sampler Start Up & Commissioning

Usage site:
Site location:Ringsend Wwtp Contact partner:TES
Location: Poolbeg, Dublin Tel.: +44 7849 088 731
Street: Pigeon House Rd e.-mail: martin.sherry@tesgroup.com
Measurement point name:QT3241-2D

Sampler

Type: BU4011
Serial number: 47967
Software version:
Dosing System:

Pressure / Vacuum VAR ( CTVV) Bypass

Distributor system:

Single bottle 12 x 2,9l 24 x 1l

4 x 10l 4 x 14l Other: __________

Sample Application:

Inlet Aeration Outlet

Other: ___________________

Suction height:
Suction height, max.
approx. height: 7,0
7,5m
Sampling method

time proportional flow proportional CVVT flow proportional CTVV

Control signal:

flow digital flow analog 0–20 mA flow analog 4–20 mA


Use the following checklist to make sure the Sampler components are properly installed.
Carry out the test in the specified sequence.

Mechanical Installation
Proper, vertical mounting of the sampler on a appropriate base checked
Lateral wall distance (at least ≥ 50 cm) checked
Optional for indoor operation: minimum distance to the ceiling (at least ≥ 50cm) checked
Proper installation of the suction hose checked. Suction hose must be laid with a continuous slope to the
sampling location
Maximun suction height checked ( max. 7,5m )
Optional with pressure / vacuum operation: Check that there is no pressure on the sample line.
Optional with plastic dosing unit: Desired sample volume pre-adjusted by shortening the sample tube in the
dosing vessel
Optional with glass dosing unit: Desired sample volume pre-adjusted by the filling tube in the dosing vessel

Electrical Installation
Proper, electrical power supply via residual current circuit breakers (tripping current max. ≤ 30mA) ensured
Optional: proper connection of the analog flow signal (terminals 2 + 3) verified
Optional: proper connection of the digital flow signal (terminals 4 + 5 ) verified
Optional: proper connection of the digital event signal (terminals 4 + 6 ) verified
Optional: proper connection of the collective malfunction signal at the malfunction relay verified

Settings
Sampling function checked by manual sample
Customer specific program edited

Instruction of the operating personnel:


Operation
General structure and operation of the sensor described
Operations and settings in the controller menu explained
Maintenance and cleaning by the operator
Regularly maintenance schedule for cleaning or replacement of wear parts by the operator
explained
Special instruction for cleaning of the dosing unit explained
Troubleshooting and resolution by customer explained
Inspektion
Necessary inspection work of Hach Service explained
( including the regulary exchange of wear parts )
Opportunity and advantage of Hach inspection / validation service contract with extended
warranty discussed

Commissioning date: 09/08/2023

Instruction date:

Introduced Persons:

Name: Signature:

----------------------------------------------------- --------------------------------------------------------------------------------------

Name: Signature:

----------------------------------------------------- --------------------------------------------------------------------------------------

Name: Signature:

----------------------------------------------------- --------------------------------------------------------------------------------------

Name: Signature:

----------------------------------------------------- --------------------------------------------------------------------------------------

Hach Employee:

Name: Signature:

----------------------------------------------------- --------------------------------------------------------------------------------------