Fire Protection Facilities Provided

Clasification
Portable Wet Riser :
Sl Facility Facility New / Fire Typology of Floor Height Overall Automatic
Name of the facility Area (Sqm) No of Floors Fire First Aid Internal Down Comer Deluge Remarks
No. Type Number Augmented Occupancy as Building (m) Height (m) Sprinkler
Extinguishe Hose Reel Hydrant (See Note -4) System
per NBC system
rs system

1 FB 001 Naval Met & COMCEN Office Building New E1- (2)- LH Office 4074 G+2 3.6 10.8 Yes Yes Yes NA NA NA

2 FB 017 Fleet Medical centre Augmented C1 - 2 - MH Instituional 1232 G 3.6 3.6 Yes Yes Yes NA NA NA

Augmentation of Base Depot Ship G- Existing, FF-


3 FB 019 Augmented E1- (1)- LH Office 844 3.5 7 Yes NA NA NA NA NA
Building extn

4 FB 021 Augmentation of MO Canteen Augmented A1 (i) - LH Residential 319 G 4.5 4.5 Yes NA NA NA NA NA

5 FB 022 Augmentation of MO Admin Building New E1- (1)- LH Office 1325 G+1 3.6 7.2 Yes Yes NA Yes NA NA

6 FB 033 Augmentation to CTP lunch Hall Augmented A1 (i) - LH Residential 478 G 3.6 3.6 Yes NA NA NA NA NA
Submarine Complex - Shore Office cum
7 FB 100 New E1- (2)- LH Office 5603 G+2 3.6 10.8 Yes Yes Yes NA NA NA
Hospitality Block

8 FB 101 Parade ground New D4 (i) Assembly Ground-5625 G 3.75 7 NA NA NA NA NA NA

9 FB 102 SMU Complex & Ship Store-4 New G1 (iii)- LH Store 3470 G+1 3.9 7.8 Yes Yes NA Yes NA NA

10 FB 103 Energy Block New G1 (iii)- LH Industrial 9058 G+1 3.6 11 Yes Yes NA Yes NA NA

SMU-MT Section: Garage and


11 FB 104 New G2(iii)-MH Industrial 839 G+1 3.9 7.8 Yes Yes NA Yes NA NA
Maintenance Facilities

12 FB 105 FSU Admin Building New E1(2) Office 4010 G+2 3.6 10.8 Yes Yes Yes NA NA NA

13 FB 106 C O Y Admid Building New E1(3) Office 5190 G+4 3.6 18 Yes Yes Yes NA NA NA

14 FB 107 C of Y Stores and Work shop New G1 (iii)- LH Store 2352 G+1 3.9 7.8 Yes Yes NA Yes NA NA

15 FB 110 NAI, NAD& WHARF Office New E1(2)-LH Office 1274 G+2 3.6 10.8 Yes Yes Yes NA NA NA

16 FB 111 Torpedo Preparation Building 1 & 2 New G1 (iii)- LH Industrial 4268 G+1 3.6 13.5 Yes Yes NA Yes NA NA
G+1 (Office), G -
17 FB 114 Afloat Workshop New G1 (iii)- LH Workshop 1021 4.5 11 Yes Yes NA Yes NA NA
Store
NAD Satellite Unit - Warhead Joining Yes (See
18 FB 115 New J1 (i) - HH Special 662 G+1 3.6 15 Yes Yes Yes NA Yes
Workshop Note-5)

Yes (See
19 FB 116 Magazine 5T(Igloo) & Torpedo Storage New J1 (i) - HH Special 769 G 15 15 Yes Yes Yes NA Yes
Note-5)

20 FB 117 Ship Store - 2 New G1 (iii)- LH Store 1136 G+1 3.9 7.8 Yes Yes NA Yes NA NA

7.8 - Store
Store & Work
21 FB 118 Ship Store - 3 & FSU Work shop New G1 (iv)- LH 4509 G+1: Store 3.9 & 15.6 - Yes Yes Yes NA NA NA
shop
Workshop

22 FB 119 MCM Admin Building New E1(2) Office 3544 G+2 3.6 10.8 Yes Yes Yes NA NA NA

Store & Work


23 FB 120 MCM Workshop New G1 (iv)- LH 1698 G+1 3.9 7.8 Yes Yes Yes NA NA NA
shop

Yes
24 FB 122 Base Victualling Yard New F2 (ii) - LH Store 2764 G 4.5 9 (Roof) Yes Yes NA (See Note- NA NA
6)

25 FB 131 MO - Store Building 1 & 2 New G1 (iii)- LH Store 5807 G 3.6 11 Yes Yes NA Yes NA NA
Fire Protection Facilities Provided
Clasification
Portable Wet Riser :
Sl Facility Facility New / Fire Typology of Floor Height Overall Automatic
Name of the facility Area (Sqm) No of Floors Fire First Aid Internal Down Comer Deluge Remarks
No. Type Number Augmented Occupancy as Building (m) Height (m) Sprinkler
Extinguishe Hose Reel Hydrant (See Note -4) System
per NBC system
rs system

26 FB 133 MO - Store Building 3 & 4 New G1 (iii)- LH Store 5807 G 3.6 11.4 Yes Yes NA Yes NA NA

27 FB 135 MO - Store Building - 5 New G1 (iii)- LH Store 3073 G 3.6 11.4 Yes Yes NA Yes NA NA

MO - Store Building - Receipt &


28 FB 136 New G1 (iii)- LH Store 3094 G 3.6 11.4 Yes Yes NA Yes NA NA
Dispatch

29 FB 137 MO - Store Building 1 & 2 at Site -C New G1 (iii)- LH Store 5481 G 3.6 11.4 Yes Yes NA Yes NA NA

30 FB 139 MO - AC store New G1 (iii)- LH Store 2911 G 3.6 13.2 Yes Yes NA Yes NA NA

Covered CTS Workshop, Office and


31 FB 141 New G1 (iii)- LH Workshop 4097 G 3.6 10.8 Yes Yes NA Yes NA NA
Survey Yard Building

32 FB 147 WED Complex - Covered Survey Yard New G1 (iii)- LH Workshop 2174 G 3.6 11 Yes Yes NA Yes NA NA

WED Complex - Heavy, Non-AC and AC G+1 (Office), G -


33 FB 148 New G1 (iii)- LH Store 7419 3.6 10.8 Yes Yes NA Yes NA NA
store Store

34 FB 154 Naval Analysis Unit New E1(1) Office 329 G 3.6 3.6 Yes NA NA NA NA NA

Naval Receiving station - Admin &


35 FB 155 New G1 (iii)- LH Special 1688 G+1 3.6 7.2 Yes Yes NA Yes NA NA
Technical Building In addition to NBC
Requirement, Clean Agenr Gas
Naval Transmitting station - Admin & Flooding is provided.
36 FB 158 New G1 (iii)- LH Special 2324 G+1 3.6 7.2 Yes Yes NA Yes NA NA
Technical Building

37 FB 160 CDT Admin & Tech Office New E1- (2)- LH Office 3353 G+2 3.6 10.8 Yes Yes Yes NA NA NA

NA (See
38 FB 161 Explosive Disposal Gog Kennel New B1 (i) Educational 843 G 3.6 3.6 Yes NA NA NA NA Building Revised.
Note-7)

NA (See
39 FB 164 Watermanship Training Facilities New B1 (i) Educational 1093 G 3.6 3.6 Yes NA NA NA NA Building Revised.
Note-7)

Due to nature of Hazard,


Store & Work
40 FB 165 Workshop/store New G1 (ii)- LH 501 G 3.6 5 Yes Yes Yes NA NA NA additional Internal Hydrant is
shop
provided.

G- Existing, FF-
41 FB 170 CNTW Admin Building Augmented E1- (1)- LH Office 150 3.5 7 Yes NA NA NA NA NA
Agmn

7.2 & 9m
G+1 (Office), G - Manual Spray system
42 FB 171 Vehicle Maintenance Zone & CNTW New G2(v)-MH Workshop 1829 3.6 (Worksho Yes Yes Yes NA Yes NA
Workshop provided.
p)

Base Logistics Complex(BLOGO, BVY,


43 FB 172 New E1- (2)- LH Office 4024 G+2 3.6 14.4 Yes Yes Yes NA NA NA
WED)

44 FB 173 Sports Facilities New D4 (i) Assembly 3913 G+1 4 8 Yes Yes NA Yes NA NA

45 DY 010 MIS & Cost Accounting Section Augmented E3 (1)- LH Business Blg 225 G 3.5 3.5 Yes NA NA NA NA NA
Fire Protection Facilities Provided
Clasification
Portable Wet Riser :
Sl Facility Facility New / Fire Typology of Floor Height Overall Automatic
Name of the facility Area (Sqm) No of Floors Fire First Aid Internal Down Comer Deluge Remarks
No. Type Number Augmented Occupancy as Building (m) Height (m) Sprinkler
Extinguishe Hose Reel Hydrant (See Note -4) System
per NBC system
rs system

Yes (See
46 DY 042 Augmentation DAS New B2 - LH Office 2667 G+1 3.9 7.8 Yes Yes NA NA NA
Note-8)

G+5 (Amenities
47 DY 100 Work shop Complex-1 New G1 (iv)- LH Work shop 32316 block), G: Work 3.6 21.5 Yes Yes Yes NA NA NA
shop

G+5 (Amenities
48 DY 102 Workshop Complex-2 New G1 (iv)- LH Work shop 36276 block), G: Work 3.6 22 Yes Yes Yes NA NA NA
shop

49 DY 107 Ship Lift and Hull Preservation Complex New G1 (iii)- LH Work shop 1784 G+1 5.4 & 3.6 9 Yes Yes NA Yes NA NA
50 DY 109 General Facilities Building New E1 (2) Office 7423 G+2 3.6 10.8 Yes Yes Yes NA NA NA

G+4 (Amenities
51 DY 114 Workshop Complex-3 New G1 (iv)- LH Work shop 10744 block), G: Work 3.6 14.5 Yes Yes Yes NA NA NA
shop

13m :
Store,
52 DY 116 Central Store New G1 (iii)- LH Work shop 5836 G+2 3.6 7.2m Yes Yes NA Yes NA NA
Amenity
Block

Sinace small area & considering


Auditorium, DY Mess & Additional
53 DY 119 New D2 (3) - LH Assembly 10607 G+4 3.6m & 10.8 21.6 Yes Yes Yes NA NA NA Cost , sprinkler system not
Admin Building
provided.

11.4m :
Store,
54 DY 133 Digutted Item Store New G1 (iii)- LH Work shop 2835 G+2 3.6 7.2m Yes Yes NA Yes NA NA
Amenity
Block
Yes
55 DY 138 New DAS Hostel New A3 (1) - LH Residential 3003 G+2 3.6 10.8 Yes Yes NA NA NA
(See Note-8)
Sub-contractors Office & Amenity
56 DY 140 New E1 (1) Office 2481 G+1 3.6 7.2 Yes Yes NA Yes NA NA
Building
Ref. set, PCM Repair & Laboratory
57 DY 141 New E1- (3)- LH Office 9852 G+3 3.6 18 Yes Yes Yes NA NA NA
Building

58 FB 213 Multilevel car Parking New G2 (v)-MH Industrial 4116 G+1 5.4 13 Yes Yes Yes NA Yes NA

Note:
1. Fire Protection Facilities provided as per NBC -2016 , Part-4.
2. The Requiremenet of External Hydrant system as per NBC-2016, Part-4 shall be planned by M/s RHDV
3. The Requirement of Fire Detection and alarm system as per NBC-2016, Part-4 for individual building shall be planned by I & PC section.
4 . Internal Hydrant along with Hose reel system shall be planned in the building in place of Down comer as per requirement of NBC. The same shall be discussed and finalised with CFEES.

5. The Automatic Water spray system (Deluge system) is provided in FB-115 & FB-116 .The Deluge system is applicable for entire area/building for fire control for High Hazard area.

6. Internal Hydrant along with Hose reel system shall be planned at GF in place of Down comer as a requirement of NBC.

7. Only Portable Fire extinguishers are provided. However, as per NBC First aid Hose reel system is to be provided which will be discussed with CFEES.

8. As per NBC only FA Hose reel system is required. However, IH is also planned along with Hose reel system which shall be discussed & confirmed with CFEES.