DOLPHIN EPRS PROJECT

EPRS Marine Base EPC PROJECT


UC-PRM-021

Document No : KMB-EPRS-MCA-01011

Area: KIZAD MARINE BASE EPC PROJECT

Discipline: MECHANICAL

Document Type: CALCULATION

Commitment Number: UC-PRM-021

Class: 1

DAILY WATER DEMAND CALCULATION

R02 24.05.2018 IFR Muthu Kannan H. Abwah Husam Abwah


Project Manager
Rev. Issue Date Description Prepared Checked Approved
Approval
DOLPHIN EPRS PROJECT

EPRS Marine Base EPC PROJECT


UC-PRM-021

REVISION RECORD

Rev. No. Purpose Description of Revision Ref. Section


R02 IFR Issued for Review

Doc No.: KMB-EPRS-MCA-01011


Page 2 of 4 Date: 24 May 2018
Rev No.: R02
Project EPRS Marine Base EPC PROJECT UC-PRM-021 KMB-EPRS-LLY-00026
Client Dolphin Engergy Reference KMB-EPRS-LLY-00027 IFC
Consultant Bainona Engineering Consultancy Drawing KMB-EPRS-LLY-00028 Drawings
Contractor Hadeed Emirates Contracting KMB-EPRS-LSC-00002
Daily Water Demand Calculation
Description WC WB H.B Shower Sink Total
Imp. Gal /
Unit Demand (Gal/ Day) 50 50 40 80 80
Sl.No Location day
1 Service block Guard room 1 50 1 50 0 0 0 0 1 80 180
2 GF / Warehouse Storage area 0 0 11 440 0 0 440
3 GF office / Mainbuilding GF office toilet 4 200 5 250 0 3 240 1 80 770
4 1st floor office / Mainbuilding 1st floor office 3 150 3 150 0 0 0 300
5 2nd floor office / Mainbuilding 2nd floor office 3 150 3 150 0 0 0 300
6 Roof Office building 0 0 2 80 0 0 80
Total Imp.Gal / Day 2070

Taotal Daily water demand (Imp. Gal./Day) = 1723.64