Professional Documents
Culture Documents
TC6 Two Column Towers
TC6 Two Column Towers
TC6 Two Column Towers
Be Alert!
Your Personal Safety Is Involved
A copy of this manual should be available at all times to the owner/operator. Additional
copies may be requested from the company at the address shown on the back cover.
Please reference manual part number 4000021 when requesting additional copies.
The safety and performance of this TC6 Two Column Tower, constructed
and readied for operation will be affected by the installation and construction
personnel. TC6 Two Column Towers generally involve extreme heights and
high winds. Careful consideration must be given to the structural requirements.
We therefore highly recommend the use of a skilled construction company
with a qualified structural engineer. Brownie Systems cannot be responsible
for the construction of the TC6 Two Column Tower. The information obtained
in this manual is offered only as a convenience to the installer. No liability is
expressed or implied toward the installation.
PREFACE
You have purchased the finest Two Column Tower manufactured today. The following information is intended
as a guide for: TC6 Two Column Tower pre-assembly, proper construction of this TC6 Two Column Tower,
and safe and proper use of this TC6 Two Column Tower after construction.
NOTE: Although Global Industries, Inc. language translations of this manual are made
as accurately as possible, if there is a conflict or difference between the English and the
other translations of this manual, the English text will prevail.
<1> Safety.......................................................................7
<2> Pre-Assembly........................................................ 11
Bolt Torque..................................................................................12
Parts.............................................................................................13
Index...............................................................................26
The Company’s sole obligation and the Customer’s exclusive remedy under this
warranty is as follows:
If within one (1) year after delivery to the customer the product fails to function properly
due to a defect in either materials or workmanship, the Company will at its option, either
repair the defective part or replace the defective part with a new or reconditioned part.
Labor charges for removing defective parts and installing replacement parts, shipping
charges with respect to such parts, and applicable sales and other taxes, if any, shall
not be covered by this warranty.
WARNING! WARNING!
ALL INFORMATION ON THIS PAGE IS Owners and Contractors: Before starting
WARNING INFORMATION! construction of this TC6 Two Column
Tower,
1) READ AND UNDERSTAND THIS
OSHA MANUAL!
2) Read and understand the instructions
OCCUPATIONAL SAFETY AND HEALTH
for all equipment, auxiliary equipment
ACT OF 1970 structures, other products, and the like
Certain purchasers of our products may be within or connected to this TC6 Two
subject to the requirements and standards of Column Tower / Grain System.
the William-Steiger Occupational Safety and 3) View all illustrations in this manual.
Health Act of 1970, which prescribes standards 4) Read and understand any applicable
for use of appurtenances of our manufacture, OSHA Regulations, Building Codes, and
such as handrails, platforms, stairways, Electric Codes.
fixed ladders, ladder cages, and guard rails.
(Occupational Safety and Health Standards
Section 1910.21 through 1910.32). Before When climbing on towers, ladders, spanning
installing these devices, familiarize yourself structures, catwalks, trusses, or the equipment
with the above Federal Standards. take care not to fall from these structures.
At the time of manufacture, these optional Common sense dictates such equipment
items conform to applicable standards. should not be used when conditions such as
rain or wind preclude their safe use. Global
Global Industries, Inc. assumes no liability with Industries, Inc. strongly recommends optional
respect to proper construction and inspection, climbing equipment be purchased to meet
assembly, or use of its products established the current regulations and specifications
under applicable laws, all of which is the sole set forth by OSHA or ANSI whether the
responsibility of the purchaser and those doing individual operator is required by law to do
the assembly work. so or not. When performing operations work
or maintenance work on Global Industries,
Inc. products and at all times, use the
correct OSHA approved Personal Protective
Equipment, Life Saving Equipment, and Fall
Protection Equipment, and always follow all
OSHA Regulations.
WARNING! WARNING!
Make certain all persons on This TC6 Local codes supersede the instructions
Two Column Tower during construction provided in this manual and should
are properly fastened to safety cables to be strictly adhered to. Contact the
prevent injury or death due to falling! manufacturer if you have questions.
WARNING! WARNING!
Installation of accessories or equipment in Avoid injury or death! Use extreme
or on the TC6 Two Column Tower or grain caution when working from heights. Use
systems equipment/structures that it was the proper equipment when working from
not designed to support will overstress heights. Take the proper precautions to
the structure and void all TC6 Two Column prevent persons or objects from falling!
Tower Warranties! If you do not have
specific recommendations from Brownie
Systems where additional loading is
involved, contact the Brownie Systems WARNING!
Engineering Department before installing
any such accessories or equipment. DO NOT substitute parts or hardware for
those supplied by Brownie Systems.
WARNING!
WARNING!
IMPORTANT: Make certain all persons
within the work area on or installing Any alterations to the TC6 Two Column
ladders, towers, lifts, crane lifts, Tower without the authorization of the
scaffolds, safety cages, platforms, or Brownie Systems Engineering Department
the like are secure and not in danger is prohibited!
of falling! Also make certain the work
surfaces are clean and free of clutter.
WARNING! WARNING!
Do not use any damaged Brownie IMPORTANT: If any questions or difficulty
Systems / Global Industries, Inc. parts. Do should arise during TC6 Two Column
not use any damaged parts from another Tower installation, the contractor or owner
manufacturer. It may not be safe. should contact Brownie Systems to get an
answer and to resolve the problem!
WARNING!
When adding additional equipment not
previously accounted for, considerable
wind load or weight may be added
to the TC6 Two Column Tower. Make
certain this TC6 Two Column Tower is
designed for all equipment, and any
future additions. If you are uncertain,
contact the factory before installing this
TC6 Two Column Tower.
Bolt Torque
Bolt Head Identification
Use the torque values listed in the table above for all TC6 Two Column
Tower hardware connections!
WARNING! WARNING!
CRITICAL: You must use the correct UNDER NO CIRCUMSTANCES SHALL
bolts as designated and provided by ANY OTHER BOLT BE SUBSTITUTED
Brownie Systems / Global Industries, Inc. FOR THOSE SUPPLIED BY
throughout the complete assembly of Brownie Systems / Global Industries Inc.!
this TC6 Two Column Tower. And, you
must achieve the correct bolt torques
as indicated in the table on this page
throughout the complete assembly!
Using the wrong bolts or not achieving
the correct torque values could result in
the structural damage or failure of this
TC6 Two Column Tower!
Parts
TC6 Two Column Tower Part Lists
Part Number Description Quantity
- Tower Column 2
- Tower Column 2
8’ [2,438 mm] tall 3988371 Horizontal - 63 3/8” [1,610 mm] 2
3988373 Diagonal - 105 3/16” [3,186 mm] 2
4800008 Hardware Package 1
- Tower Column 2
5’ [1,524 mm] tall
- Tower Column 2
10’ [3,048 mm] tall
TC6 TOWER - 8’ [2,438 mm] WIDE
- Tower Column 2
8’ [2,438 mm] tall
Horizontal Brace
(2 3/8” outside 5/8” hex nuts 2
diameter) 7/8” UNC x 2”, grade 5 5
[60 mm] 7/8” lock washers 5
7/8” hex nuts 5
7/16” UNC x 5 1/2” grade 2 hex bolt 1
7/16” lock washer 1
7/16” hex nut 1
19”
19”
[483 mm]
Extension
Bin Foundation
Example A.
TC6 Tower Foundation.
Length:
3/4 depth of foundation plus 1’ [305 mm] from
1” [26 mm]
the end of each anchor rod. Typical
Configuration:
Position anchor rods through holes in anchor
Anchor
plates, extending 1” [26 mm] above plates.
Rod
Apply a 5/8” [16 mm] fillet weld all around.
1 ft
[305 mm]
Typical
Example B. Foundation
Anchor Rod Configuration.
2” Typical
2” Typical
Bin Foundation
2” Extension
min.
2”
Typical 85 5/8” (6ft wide tower)
min. 7/8” = [22 mm]
or
Typical 2” = [51 mm]
110 5/8” (8ft wide tower) 15” = [381 mm]
85 5/8” = [2175 mm]
Example C. Anchor Plate Configuration Positioning Detail. 110 5/8” = [2810 mm]
1 diagonals & horizontals to columns i IMPORTANT NOTE: The tower section should
be assembled on relatively level ground. All bolted
Refer to the example below. connections should be finger-tight only at this time.
A) Use (2) tower columns, (2) diagonals, and
(2) horizontals for each tower section.
B) Assemble the diagonal and horizontal bracing WARNING!
to tower columns at LOCATIONS 1 .
Use 7/8” UNC x 2” grade 5 hex bolt, lock Install bracing so the column ear is
washer, and nut. “sandwiched” between the horizontal and
diagonal brace. NEVER bolt tower bracing
C) Connect diagonal braces at LOCATION 2.
to the same side of the column ear! Note
Use 7/16” UNC x 5 1/2” grade 2 hex bolt, the position of the bracing (section A-A).
lock washer, and nut. Position the brace with the flattened
side of the brace next to the column ear
(contact side).
A A
AL
N
O
G
IA
D
COLUMN 2
EAR
COLUMN
Diagonal
1 1
Horizontal
SECTION A-A
30'
[9144mm]
BASE SECTION
STIFFENER
TOP VIEW
BIN WALL
STIFFENER
CONNECTION EAR
F
OF 1 TOWER COLUMN
A ND CE
ST TAN ONAL CONNECTION EAR
DI
S STANDOFF DIAG STAN ST STA
DISTANCE 1 DOF
DI
F AN N
DIST DIAGON DO CE
ANC AL
E2 FF 2
2 COLUMN TOWER
TOWER
TOWER STANDOFF COLUMN
COLUMN DIAGONAL 1
STANDOFF 2
STANDOFF 1
STANDOFF
DIAGONAL 2
STIFFENER
STANDOFF 1 STANDOFF 2
STANDOFF
DIAGONAL 1
STANDOFF
DIAGONAL 2
2 COLUMN TOWER
(WITH SOME BRACES NOT
SHOWN FOR CLARITY)
BIN WALL
STANDOFF
DIAGONAL cut
interference edges
STANDOFF 2
8a field cut mounting angle NOTE: Connection Method 1 is used when the Two
Column Tower foundation is independent of the
Refer to the examples on this page and grain bin foundation. Connection Method 2 is used
the next. Configure your installation as when the Two Column Tower anchors to the grain
shown in the examples on the next page. bin stem wall (foundation).
Measure and cut (1) 4” x 4” x 1/4”
[102 mm x 102 mm x 6 mm] MOUNTING
ANGLE to the length required to extend
NOTE: MOUNTING ANGLES are
SI not
: supplied by
beyond both tower COLUMN CONNECTION Brownie Systems.
L K
TOP VIEW
DRILL TEMPLATE
CONNECTION BIN WALL
STIFFENER
EARS
x x
x
x
2 COLUMN TOWER
MOUNTING
ANGLE
3/4” X 2” HEX BOLT
(4 PLACES)
TOWER
COLUMN
STIFFENERS
TOP VIEW
BIN WALL
STIFFENER
B
F
base tower section 18
foundation 11, 14, 21, 24
be alert 2
foundation anchor rod 15
bin eave 19
freezing water 18
bin wall 21, 23, 24, 25
builder 3 H
building codes 8 hardware 17, 18, 20, 22, 25
hardware connections 12
C hardware identification 12
catwalk 11
hardware package 13
caulking 18
hazards 3, 7
climbing 8
horizontal brace 13
codes 8, 9
horizontals 13, 17
column connection ears 20, 24, 25
construction personnel 2
M
contents 4
mounting angles 24, 25
contractor 10
O T
operation 7 tools required 11
OSHA occupational safety and health act of 1970 8 tower sections 17, 18
P W
paint 22 wall attachment 11
parts 13 warranty 6
pre-assembly 11 welding 18
wind load 10
S work area safety statement 7
safety 2, 3, 7, 8, 9, 10, 12, 17, 18
safety cables 9
safety compliance 7
scaffolds 9
shims 18
site / foundation 14
spreader beam 19
stem wall 21
support structure 19
MANUFACTURED BY
BROWNIE SYSTEMS
A Unit of GLOBAL Industries, Inc.