Lift Plans:

1. Lift Plan- Loading and Off-loading from Vessel to Jetty & Vice versa / Vessel Cargo
Operations - (CCUs, Skid Units, Food Containers etc)
2. Lift Plan - Lifting Operations at Arzanah island (areas other than Jetty)
3. Lift Plan- Loading and Off-loading from Vessel to Jetty & Vice versa / Vessel Cargo
Operations - Jumbo bags (NR- Complicated)
4. Lift Plan- Loading and Off-loading from Vessel to Jetty & Vice versa / Vessel Cargo
Operations - Pipe Bundles
5. Lift Plan - Loading and Off-loading of material/ Lifting Operations at NORM area
(handling radioactive contaminated materials) (COMPLEX)
6. Lift Plan - Material handling/ lifting operation at Workshop/ DG House using EOT
crane at Arzanah island
7. Lift Plan- Loading and Off-loading materials from Vessel to WHT and vice versa
using Electric Monorail Hoists at SATAH-WHTs
8. Lift Plan- Loading and Off-loading materials from Vessel to PMP and vice versa using
Electric Monorail Hoists at SATAH-PMPs
9. Lift Plan- Loading and Off-loading, shifting of materials/ Material handling using
Forklifts- (each model)

Concern for LIMS Implementation:

1 – Computer / System and place to sit for working

3 – Required Rigger Level 2 or 3, Currently all riggers are Level 1.

4 – Contingency Crane Availability / Selection

5 – Required foreman with Driving Licence and Car / Pickup