Date: 18/09/2023
QT NO:DQM072413
Costumer ID:DQMRL0111
Validity Date:
Client Name: Global
Addresses:
Email:
Ph.:
Project Type: Deep excavation work
Project Location: DUQM

NO DETAILS C.L mtr QTY UNIT PRICE


Deep excavation work using a trencher machine to a depth of 1-2.5 metres
1 1 65

SUB TOTAL 65
VAT 3
TOTAL 68.25

Payment amount:
30% Advance
If the task is divided into five stages:
10% will be paid after completing each stage
20% after all tasks are completed and delivered

TERMS AND CONDITIONS:


Planning and following up the tasks on site is Reports should be reviewed with the general Site Engineer.
The contractor team of the excavator is responsible for the Contractor foreman.
Excavator maintenance periods: this period of time is not deducted from the general project progress plan.

Warranty & Support: Prepared by: MOHAMED HASHIM