ARCELORMITTAL NIPPON STEEL INDIA LIMITED (AMNSIL)

Plant Name Port Key Date (When First Started): 01.04.2022


Ref No. AMNSIL/Port/HSE/21/F Format name Bunkering Check List
Rev. No. 01 Revision Date 20/08/2022
Issued By: HSE Engineer Approved By: Section Head HSE

Date: ______________ Shift: _________________ Time: ____________

Name of Ship___________

Sr.
Check Points YES NO Remarks
No
If yes, Stop till Bunkering
1. Any hot work is progress in nearby vicinity on Jetty and onboard?
progress.
2. Is earthing connection properly done?
Oil spillage combating arrangements are kept standby. SOPEP gear on deck
3.
and ready near the bunkering point onboard.
4. Transfer hose is without any defects
5. Are The transfer hose properly rigged and flanges fully bolted?
6. Is there effective/adequate supervision on the vessel/shore?
Is Fire Fighting Equipment on board and ashore positioned and ready for
7. immediate use? Vessel to keep foam extinguishers ready at deck and 1 near
the road tanker hose connection flange on jetty.
8. All personnel are equipped with necessary PPE’s
9. Cautionary Signage board in place. Area cordoned off on Jetty.
10. Toolbox meeting conducted before bunkering
11. Is the communication system agreed on both parties? Hand and verbal signaling
12. Is the vessel securely moored?
Has permission to commence bunkering operations been given by AMNS Port
13.
Radio Room (VHF Channel 71 or Tel No. 9023512149)?
14. Is there safe access between vessel and shore?
15. Have the procedures for bunker handling been agreed?

16. Has the emergency shutdown procedure been agreed?

17. Are scuppers effectively plugged and drip trays in position on board?

18. Are all bunker tank lids closed?


19. Are smoking requirements being observed?
20. Are sufficient personnel aboard to deal with an emergency?

21. Declaration signed by Vessel Master/Bunker supplier

AMNS Port radio room is to be informed when bunkering operations are


22.
complete.

Signature of HSE Representative (AMNSI) Ship / MBC Chief Engineer