General Motors

QUALITY SYSTEMS BASICS AUDIT


SUPPLIER: DATE:
SUPPLIER DUNS NO:
SUPPLIER LOCATION: AUDITOR:

This audit corresponds to the current Quality Systems Basics requirements as defined
in the QSB presentation dated 11/24/04. This audit applies to all suppliers regardless of
which revision of the QSB presentation was used for training. This audit supercedes
any previous audit and presentation revisions. If a QSB audit was conducted using the
audit form approved for use at that time and prior to this revision date, it is not
necessary to repeat the audit.

AUDIT SUMMARY

POTENTIAL AUDIT
KEY STRATEGIES STATUS IS CORRECTIVE ACTION REQUIRED
SCORE SCORE

16 16 G
FAST RESPONSE
CONTROL OF NON- 24 24 G
CONFORMING MATERIAL

12 12 G
STANDARDIZED WORK
STANDARD OPERATOR 20 20 G
TRAINING

24 24 G
RISK (RPN) REDUCTION
ERROR PROOFING 12 12 G
VERIFICATION

28 28 G
LAYERED AUDITS

12 12 G
C.A.R.E.

12 12 G
LESSONS LEARNED
TOTAL SCORE: 160 160
Audit status is equal to
AUDIT STATUS the lowest color status of G
theabove strategies.

Note: YELLOW and RED status on any question requires corrective actions.
Follow-up may be done on site or via E-mail; at the auditor's discretion.
Application of this audit's results to the supplier's status is at the SQE's discretion.

STATUS FOR INDIVIDUAL QUESTIONS


0 - No implementation: Corrective Action Required
R
1 - Written implementation plan: Corrective Action Required, or
R 2 - In place, not followed: Corrective Action Required.
Y 3 - YELLOW: requirement partially implemented
G 4 - GREEN: requirement met
Note: Status and Code entered automatically from audit sheet..

QSB Audit Form 07.04 Rev. 022205


QSB AUDIT

QUESTION EVIDENCE REQUIRED LOOK FOR… COMMENTS SCORE R/Y/G


FAST RESPONSE
Is there a system in place to Daily leadership meeting addresses significant Fast Response Tracking form or
immediately respond to significant Quality concerns, designates owners and equivalent, a living document with
internal and external quality failures? assigns report out dates. Attendees should be issue, owner, report date, exit criteria
cross- functional and multi-level. and status indicated (preferably
R/Y/G). Fast Response form should be
4 G
displayed in meeting area, preferably a
large (8' x 4') dry erase board or
equivalent.

Owner report out includes tracking form, Problem solving form (5S, 8D)
problem solving form, PFMEA, Control Plan, referenced, Control Plans, PFMEA.
workforce notification, etc.. Follow an issue from Fast Response
Tracking Form through the exit criteria. 4 G

Fast Response issues are linked to Layered Layered audit and C.A.R.E. checklists,
Audits, C.A.R.E., Lessons Learned, Standardized Work Instructions,
Standardized Work Instructions, etc... Lessons Learned contain past or 4 G
present Fast Response issues.

The concern is communicated to the Quality Q or equivalent is posted and


appropriate employees. Quality status is up to date. Compare Quality "Q" to
posted. Fast Response Tracking Form for 4 G
correlation.

SCORE / POTENTIAL 16 16
CONTROL OF NONCONFORMING PRODUCT
Is there a system in place to ensure A consistent tagging system is used to identify Color coding of scrap containers, hold
products that do not conform to suspect and nonconforming product. Preferred tags, scrap labels, in-process tags,
specified requirements are prevented system is Stoplight visual management where travelers, routers, etc… If red tags are
from unintended use? red indicates scrap or rejected material and used for both scrap and suspect
yellow indicates suspect material. Green or any material, tag must have disposition. 4 G
other color (except yellow or red) indicates Suspect tags should have last
acceptable product. operation performed.

Containment form or nonconforming material Containment worksheet or equivalent,


form identifies expected quantity and locations nonconforming material area and
of suspect material. associated documentation. 4 G

Nonconforming and suspect material are Segregation areas are identified and/or
segregated. foot printed: scrap bins, rework tables,
hold areas, etc… 4 G

Breakpoint maintenance requires 100% Containment procedure, data and


inspection and management authorization for nonconforming material area. Form
release. with authorized signature and 4 G
approved inspection of product.

QSB Audit Form 07.04 2 of 6 Rev. 022205


QSB AUDIT

QUESTION EVIDENCE REQUIRED LOOK FOR… COMMENTS SCORE R/Y/G


Product removed from the approved process Procedure and forms that identify
flow is reintroduced into the process at or prior process for releasing product back into
to point of removal. process. 4 G

Does leadership review containment results? Form or meeting minutes that


demonstrate management's review 4 G
process.

SCORE / POTENTIAL 24 24
STANDARDIZED WORK
Is there a system in place to develop Standardized Work Instructions are posted at Review instructions; must include work
standardized work instruction all operations where there are human elements, operator work path, and
(methods and sequence) for all operators. operation cycle time. 4 G
operations?
All affected operators are trained in the use of Operator Training records or equivalent
Standardized Work Instructions posted at each operation. 4 G

Procedure requires multi-disciplinary teams and Standardized Work Instruction forms:


continuous improvement. issued by, revision dates, etc… 4 G

SCORE / POTENTIAL 12 12
STANDARD OPERATOR TRAINING
Is there a system in place to define Operator training records document specific Revisions and dates of completed
the minimum content and tracking for areas of training such as safety, quality record forms for operators working in
all operators new to an operation keeping, gaging, etc…? manufacturing area. Procedure for 4 G
and/or for operators in need of storage and easy retrieval of records.
refresher training?
Trainers verify quality at a frequency to assure Training record, audit checklist,
all standards are met . Trainer or equivalent operator Quality documentation. New
audit employee within shift and again operators following Standardized Work
approximately one day later. Trainers verify Instructions. 4 G
Standardized Work Instructions are being
followed.

Downstream operations are notified of new New operator tags, labels, stamps or
operators? equivalent to show product affected by 4 G
an operator in training.
Training records for supplemental employees Documentation, scheduling, and
document refresher training within the last three tracking forms for operator refresher 4 G
months. training.
Records reflecting training status of all Operator Tracking Sheets or
operators posted at each operation. equivalent posted at all operations. All
operators listed including supplemental
employees. Review training dates and 4 G
tracking sheet revision dates.

SCORE / POTENTIAL 20 20

QSB Audit Form 07.04 3 of 6 Rev. 022205


QSB AUDIT

QUESTION EVIDENCE REQUIRED LOOK FOR… COMMENTS SCORE R/Y/G


RISK (RPN) REDUCTION
Is there a system in place for PFMEAs are present for all manufacturing Valid RPN numbers and revision dates
reducing the risk of all production processes including support functions with some correlation to known
processes by reducing the highest (receiving inspection, labeling, shipping, etc…). problems (PRRs, etc…). PFMEA
RPN values? Severity, Occurrence, Detection charts are available for all part numbers and all
used to assign appropriate RPN values. operations, especially high risk such as
PFMEAs are living documents that meet labeling and rework. Documentation 4 G
customer and AIAG requirements. that customer requirements and AIAG
guidelines are addressed by PFMEAs.

Multidisciplinary teams are responsible for Multi-disciplinary team agenda or other


periodic reviews of PFMEA and coordination of evidence of RPN reduction activities.
the RPN reduction activities? The frequency of Documentation that frequency and
reviews is determined based on customer input, prioritization of reviews is based on
process capability, process changes, etc… A customer input, process capability,
system to prioritize the sequence for reviewing process changes, AIAG guidelines,
different PFMEAs is utilized. etc… Review checklists, agendas or 4 G
equivalent that assure adequate
PFMEA review (all process controls on
PFMEA, occurrence and detection
ratings are accurate, etc...).

Proactive approach to reduction of highest RPN Top RPN list, tracking charts and multi-
values has been implemented. Top RPN list disciplinary team minutes noting
with action plans. improvement actions and completion 4 G
details.

RPN reduction tracking charts updated and Management review minutes and
reviewed by management. posting of tracking charts. 4 G

Has a multi-disciplinary team Identification and tracking of past Quality Multi-disciplinary team meeting notes,
identified and analyzed (Pareto Chart, failures with a top 5 list and action plans. action plans and past quality failures
etc...) past Quality failures (both top 5 list..
external and internal)? 4 G

Occurrence and Detection ratings for past Updated Detection ratings on PFMEA.
failures accurate and reflect past corrective Note revision date of PFMEA
actions and/or error proofing.. documentation to address error 4 G
proofing and verification of past
failures.

SCORE / POTENTIAL 24 24
ERROR PROOFING VERIFICATION
Is there a system in place to verify Procedure requiring documentation of Master list of all devices that
that error proofing/ detection devices verification for error proofing/detection devices. prevent/detect the manufacture or
used in manufacturing and assembly assembly of nonconforming product.
are functioning properly? Documentation of device verification at 4 G
a minimum of once per day.

Procedure requires reaction plan and Verification logs, escalation or failure


immediate corrective action when device fails notification forms, and corrective action 4 G
verification. forms.

QSB Audit Form 07.04 4 of 6 Rev. 022205


QSB AUDIT

QUESTION EVIDENCE REQUIRED LOOK FOR… COMMENTS SCORE R/Y/G


Management reviews verification results. Verification failures on Fast Response
Tracking Sheets, Layered Audit,
Management Review agenda, 4 G
Verification tracking forms available.

SCORE / POTENTIAL 12 12
LAYERED AUDITS
Is there a system in place to verify the Checklist of high risk items (customer used Completed audits at a frequency of
documented manufacturing/assembly features) audited a minimum of once per shift? once per shift performed by operator or
process through layered audits? inspector. 4 G

Evidence and documentation of immediate Audit checklist, audit work instructions,


corrective action for nonconformance? internal corrective actions. 4 G

Where appropriate, Standardized Work is Layered audit checklists.


4 G
verified through layered audits?
Layered Audit procedure requires daily Completed audits at a frequency of
verification of quality documentation by a once per day performed by a 4 G
supervisor? supervisor or lead person.
Procedure requiring upper management to Completed audits performed by
audit part, process, system and voice of the managers demonstrating their
customer? assessment of manufacturing, quality
documentation, process parameters, 4 G
systems and customer activities.

System to document results and communicate Layered Audit tracking forms, posted
to management. audit results, management review 4 G
notes or meeting agenda.
Addition of Layered Audit issues to the Lessons Completed Lessons Learned forms
Learned system. that reflect layered audit results,
nonconformances and lessons 4 G
learned.
SCORE / POTENTIAL 28 28
C.A.R.E.
Is there a system to designate and Procedure implemented to require 100% Audit list of customer satisfaction
100% inspect customer satisfaction inspection of identified customer satisfaction items, especially pass through items. If
items? items. When 100% is not feasible, an alternatives to 100% inspection are
alternative method of increased inspection is utilized, documentation to support 4 G
utilized. Procedure includes review of warranty when and what method is used as well
returns, past problems, high RPNs, pass- as duration.
though items and PRR's.
Procedure requires immediate reaction to Audit form requires corrective action.
failures. System to report failures to
management (Fast Response and 4 G
Layered Audits).
Leadership reviews C.A.R.E. results. Form or meeting minutes that
demonstrate leadership's review
process. 4 G

SCORE / POTENTIAL 12 12
LESSONS LEARNED

QSB Audit Form 07.04 5 of 6 Rev. 022205


QSB AUDIT

QUESTION EVIDENCE REQUIRED LOOK FOR… COMMENTS SCORE R/Y/G


Is there a system in place to capture Lessons Learned procedure and the associated Lessons Learned forms. Continuous
or identify information that will procedures reference Lessons Learned. Improvement, APQP, and RPN
support continuous improvements to Reduction team checklists or notes. 4 G
all operations/processes?

Computerized files or paper documentation that Completed Lessons Learned forms. To


contain completed Lessons Learned assure implementation; review dates,
forms/records. distribution lists, and posted Lessons 4 G
Learned.
Appropriate procedures (Corrective Action, Completed Corrective action forms.
Continuous Improvement) require review of Continuous improvement team notes
Lessons Learned. Leadership reviews Lessons and agendas. Leadership notes or
Learned process to assure implementation. agenda indicating Lesson Learned 4 G
system is reviewed.

SCORE / POTENTIAL 12 12
0 No implementation: Corrective Action Required
1 Written implementation plan: Corrective Action Required
2 In place, not followed: Corrective Action Required
YELLOW: requirement partially
3 Note: Enter appropriate score based on R Y G score criteria and hit enter. Correct color will appear in R/Y/G cell.
implemented
4 GREEN: requirement met

QSB Audit Form 07.04 6 of 6 Rev. 022205