Project Proposal
2. Description
Rationale
One of the worst problems in our country is the proliferation of waste that is no longer
usable, so it is just dumped everywhere, which in turn causes many disasters such as
environmental degradation, rising flood levels, air pollution, a smelly environment, and
deaths of animals in the ocean and even on land. So to reduce the increase in waste that
Through the refillable station, the use of plastic waste will be reduced, and people in
the community can reuse their containers or plastic containers to minimize the need for
new materials that cause the increase in waste. Some of its benefits are protecting the
environment and limiting the use of plastics or waste that cause damage to the
environment. Our proposal's purpose is to help protect our environment and make it
more attractive, to prevent environmental problems, and teach people to be more
environmentally conscious.
Duration
This project is led by our NSTP/CWTS subject teacher, in collaboration with family
Collaborating Agency
We planned to carry out this proposal in collaboration with the chairman of the
Barangays' community as well as with other persons who were available to help.
3. Objectives
b. To help assist in both financial and environmental savings by bringing own containers
e. To fulfill the needs for liquid soaps in each barangay at a lower and more affordable
price.
4. Probable Milestone
Activity
There will be forming the group member's or volunteers and planning the refilling
The members of the group and volunteers is the persons who will help and do the
activity.
Location
Starting Time
Duration
The activities will be due within 7-8 months and our project will end on January 2023.
Cost
The expenses in our project is 2,000 weekly and 1,500 for the stall and faucet gallons.
The group decided that the project proposal fund will be coming from the fund of the
barangay since it will be a project proposal to each barangay. The starting expenses for the stall
and faucet containers will be estimated up to 1,500 pesos. The weekly expenses will only be for
gas and delivery which is estimated up to 2,000 pesos because of the price hike of gasoline. The
capital needed for the liquids to be sell is shown in the table below:
The branded liquids will come from the direct supplier and will be bulk orders for the whole
week to save gas expenses. In additional, the supply for the whole week is one gallon for the
liquid soap, shampoo, and detergents and ten kilograms for the powder detergents. Prices came
from iprice.ph.
6. Gantt Chart
The table, Gantt chart, shows the task for the month of May 2022 specifically, since the
Planning
Delivery of
Supplies
Monitoring of Sold
Liquids
Monitoring of
Consumers
Consumer’s
Feedback
Inventory