UNDERGROUND PIPE PVC-P Ø 1 1/2". SCH.40

P1

F1 TK1

P3
P2

Ø 1"
F2 P4
F3

F4
Up 1"

TK2

LID 221.46
BOTTON 219.62

P5 P6
CONNECTS TO EXISTING
SEWER NETWORK
(h=-0.67m)220.49
219.82
220.25 (h=-0.56m)
220.49 (h=-0.65m)
219.69
220.25 (h=-0.53m) I.Box-2 219.84 I.Box-3 220.67 (h=-0.35m)
0.6x0.6x0.67 (h=-0.57m)220.67 0.8x0.8x0.57
219.72 220.32
220,10
← ←
SANITARY PIPEPVC Ø6",i:2%, L=5mts, (0.1m) SANITARY PIPE . PVC Ø 6", i:2%, L= 13.22mts, (0.26).

Existing Insp./ Box


80x80 VENTILATION COLUMN, GOES UP
TO THE TOP OF BOND BEAMØ2"
220.49 (h=-0.65m) VENTILATION COLUMN, GOES UP
TO THE TOP OF BOND BEAMØ2"
219.84

SPØ2" 221.88
220.39

Ø2"
SPØ2"

SANITARY PVC. PIPE Ø2"


SPØ2" SPØ2"

SPØ2"

Ø6"-i:0,8%
Ø 4", i:1% Ø2"


2C2" SPØ2"
UNDERGROUND VENT
PIPE Ø2"
SPØ2"

Ø3"

Ø
4"

-i
Ø2"

:1
SPØ2"

,0
SANITARY PIPE . PVC Ø 4", i:1%

%
SPØ2"

Ø2"

SANITARY PIPE PVC Ø4", i:2%,L=12.45mts, (0.25m).



VENTILATION COLUMN, SPØ3"
GOES UP TO THE TOP Ø2" - i:1,0% VENTILATION COLUMN, GOES UP
OF BOND BEAMØ2" TO THE TOP OF BOND BEAMØ2"

SANITARY PIPE PVC Ø 6", i:0.8%, L=15.11 mts, (0,12m).



SPØ2"
Ø2" - i:1,0%



→ → → →

Ø2" - i:1,0% Ø2" Ø4" SANITARY PIPE . PVC Ø 4", i:1%

Ø2"

Ø2"

UNDERGROUND SPØ2" 221.88
VENT PIPE Ø2" 220,56


SPØ2"
← 2" →
Ø
Ø2"

Ø3"
Ø2"


UNDERGROUND

→ → VENT PIPE Ø2"

Ø2"


VENTILATION COLUMN, GOES UP

SANITARY PIPEØ 4",i:2%, L=7.12m,


VENTILATION COLUMN, GOES UP Ø2" ← ←
TO THE TOP OF BOND BEAMØ2" Ø4" - i:1,0%

Ø 6", i:0.8%
TO THE TOP OF BOND BEAMØ2" Ø2" SANITARY PIPE SANITARY PIPE . PVC Ø 4", i:1% Ø2" SPØ2" Ø2"
SPØ2" Ø 2", i:1% → Ø2" - i:1%


VENTILATION COLUMN, GOES UP SPØ2" Pending for approval
TO THE TOP OF BOND BEAMØ2" Ø2"

(0.14m)

Ø2"

4"
← →


← SPØ2" SPØ2"

Ø
SPØ2" Ø4"

4"

Ø

Ø
4" Ø2" SPØ2"


→ ← ← Ø2" ← Ø4" - i:1,0%

2"
→ -i

Ø
:1 VENTILATION COLUMN,
Ø2" % SANITARY PIPE. PVC Ø 4", i:1% Ø4" - i:1% Ø4" - i:1%
Ø2" - i:2% GOES UP TO THE TOP
SANITARY PVC. PIPE Ø2" - i:2% ←
→ OF BOND BEAMØ2"
UNDERGROUND SPØ2"
SPØ2"
VENT PIPE Ø2" SPØ2" SPØ2" Ø2"
Ø2"
SPØ2" SPØ2"
SPØ2"
VENTILATION COLUMN, GOES UP
221.88 (h=-1.93m) TO THE TOP OF BOND BEAMØ2"
219.95 →

Pending for approval


Ø4"
Ø2" - i:1,0%

%
i:1

VENTILATION COLUMN, GOES UP ARCHITECTURAL SPØ2"

-
TO THE TOP OF BOND BEAMØ2"

4"
REFERENCE +221.88


VENTILATION COLUMN,

C
IS EQUAL TO FLOOR GOES UP TO THE TOP

SANITARY PIPE PVC Ø4", i:1%, L=12mts, (0.12m).

PV
OF BOND BEAMØ2"
FINISH LEVEL (+0.00)
SPØ2"

Ø2"
Ø2" - i:1%

SPØ2"
221.88
(h=-1,18m)


220,70

Pending for approval

SPØ2" SPØ2"

→ →

SANITARY PIPE PVC Ø4"


Ø2" - i:2% Ø4" - i:1,0%
UNDERGROUND
%

VENT PIPE Ø2" SPØ2"


.5
:1

→ METALLIC GRID 8" x 11"


-i
3"


Ø2"
Ø

Ø2" - i:2%

VENTILATION COLUMN, GOES UP TO (h=-1.73m)221.80 221.80 (h=-1.73m)


THE TOP OF BOND BEAMØ2" 221.80 (h= -1.67m) 220.07 220.07←
220.13 SANITARY PIPE Ø4" i=1%, SANITARY PIPE Ø3" i=1.5%,
L= 5.15mts, (0.05m). 221.80 L= 3.60mts, (0.054m).
Existing Insp./ Box
(h=-1.72m)220.08
I.Box-1 Inverted Siphon
1x1x1.73
-0.68 FLOOR
FINISH LEVEL

INSPECTION INTERIOR DIMENSIONS ELEVATIONS (COVER


STRUCTURE ID (BxIxH) [mts] ELEVATION-PIPE LEVEL)

I.BOX-1 1x1x1.73 221.80 / 220.07

I.BOX-2 0.6x0.6x0.67 220.49 / 219.82


P-102
I.BOX-3 0.8x0.8x0.57 220.67 / 220.10
LI O
B
D TT
2 O
2 N
1 2
.4 1
6 9

N
R
.6

TE
2

IS
C K
G AN
TIN T
R
IS TE
EX A
W
VENTILATION COLUMN, GOES UP
VENTILATION COLUMN, GOES UP
TO THE TOP OF BOND BEAMØ2"
TO THE TOP OF BOND BEAMØ2"

UNDERGROUND VENT
PIPE Ø2"

VENTILATION COLUMN,
GOES UP TO THE TOP VENTILATION COLUMN, GOES UP
OF BOND BEAMØ2" TO THE TOP OF BOND BEAMØ2"

UNDERGROUND
VENT PIPE Ø2"

UNDERGROUND
VENT PIPE Ø2" VENTILATION COLUMN, GOES UP VENTILATION COLUMN,
VENTILATION COLUMN, GOES UP GOES UP TO THE TOP
TO THE TOP OF BOND BEAMØ2"
TO THE TOP OF BOND BEAMØ2"
OF BOND BEAMØ2"

VENTILATION COLUMN, GOES UP Pending for approval


TO THE TOP OF BOND BEAMØ2"

UNDERGROUND
VENT PIPE Ø2"

VENTILATION COLUMN, GOES UP


TO THE TOP OF BOND BEAMØ2"

Pending for approval


VENTILATION COLUMN, GOES UP
TO THE TOP OF BOND BEAMØ2"
VENTILATION COLUMN,
GOES UP TO THE TOP
OF BOND BEAMØ2"

Pending for approval

UNDERGROUND
VENT PIPE Ø2"

VENTILATION COLUMN, GOES UP TO


THE TOP OF BOND BEAMØ2"

P-105