Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Operating Instructions

Parts Verification Options (Wired)

Production Modular

NPM / AM series

om
t.c
m
ds
l an
ld
go
w.
ww

Thank you for purchasing the “Panasonic product.”


 Read the operating instructions carefully for proper and safe usage.
 Before placing the machine in service, be sure to read “Safety Precautions.”
 Store the operating instructions carefully.

N7201A563E06
201503
ww
w.
go
ld
lan
ds
m
t.c
om
Original Instructions
“Use of this machine:
This machine is designed and constructed to be used for placing electric and electronic components on PCB.
This machine shall be used for this purpose only.

It shall not be used for any other purpose.”

“Operation of this machine:


This machine shall be operated by professional, specially trained operators.

It shall not be operated by non-professional, not specially trained operators.

Regarding the training course, please contact Panasonic Factory Solutions Co., Ltd.”

om
Warning

t.c
Do not operate the machine without receiving special training
m
Risk of injury due to improper operation.
ds
Prohibited
●About training, conduct in your company or contact us.
l an
ld

Machine was manufactured by: Panasonic Factory Solutions Co., Ltd.

1375, Kamisukiawara, Showa-cho, Nakakoma-gun, Yamanashi 409-3895, Japan


go

Phone number: +81-55-275-6223


Fax number: +81-55-243-4972
w.
ww

EJM5DE-BP-01N-03 Page 3
Applicable Model No.

 Usable for the following the NPM and AM series.


 NPM series
Model Model
Product No. Product No.
name name
NPM-D NM-EJM1D NPM-W NM-EJM2D
NM-EJM1D-MA NM-EJM2D-MA
NM-EJM1D-MD NM-EJM2D-MD
NM-EJM1D-A NM-EJM2D-A

om
NM-EJM1D-D NM-EJM2D-D

NPM-D2 NM-EJM5D NPM-W2 NM-EJM7D

t.c
NM-EJM5D-MA NM-EJM7D-MA
NM-EJM5D-MD NM-EJM7D-MD
NM-EJM5D-A
m NM-EJM7D-A
ds
NM-EJM5D-D NM-EJM7D-D

NPM-D3 NM-EJM6D NPM-TT NM-EJM3D


an

NM-EJM6D-MA
l

NM-EJM6D-MD
ld

NM-EJM6D-A
go

NM-EJM6D-D
w.

 AM series
Model
Product No.
ww

name
AM100 NM-EJM4D

Description of the Instruction Manual

 This instruction manual describes use of this function with the NPM or AM series. The NPM
or AM series are referred to as the ‘machine main unit or ‘machine’ in the main body of this
instruction manual.

 As far as use of this function with the NPM or AM series is concerned, aside from this
instruction manual, there is another instruction manual for the machine main unit. If you do
not have it on hand, contact us.

Page 4 EJM5DE-BP-01N-03
Wording in context

 How to read operating instructions


Description depends on the page; however, it is constructed basically as follows.

2 3
1 1.1.1 PCB Information
1 Choose [Modify]  [Edit Top Side
Panel Information] on the menu bar,
or double-click the PCB.

om
4  The <Edit Top Side Panel Information>
window opens.

 On-screen items may vary according to

t.c
5
options etc.

m Explanation
 Title
 Operation step number
ds
Corresponds to the arrow number on the
screen.
an

 Actual operation
 Describes the effect produced by the
operation.
l

 Describes the supplementary explanation.


ld

 Symbols used in this manual


go

In this manual, the following expressions and symbols are used for description.

Symbol Explanation Symbol Explanation


w.

Shows a reference item.


ww

Shows an operation flow.


This shows the part to be clicked on.

Screen name Shows a screen name.

[Button] Shows a button or a menu.

This shows the part to be double-clicked on. “Message” Shows a message on the screen.

‘Item’ Shows an item text on the screen.

EJM5DE-BP-01N-03 Page 5
NPM / AM
Parts Verification Options(Wired)

TABLE OF CONTENTS
 Safety precautions ...................................................................................................S-1
 Handling of the wired scanner .................................................................................S-4

1. OVERVIEW ..................................................... 1-1


1.1 Names and Functions of Each Part ...................................................................... 1-2
1.1.1 Main Body ........................................................................................................................................... 1-2

1.2 Window Structure ................................................................................................. 1-5


1.2.1 LNB Initial Settings ............................................................................................................................. 1-5

1.3 About Scanner Location ....................................................................................... 1-9

om
2. BASIC OPERATIONS ..................................... 2-1
2.1 Flow of LNB Initial Setting Process ...................................................................... 2-2

t.c
2.1.1 Setting the Scanner Location ............................................................................................................. 2-2
2.1.2 Setting the Verification Option ............................................................................................................ 2-3
m
2.1.3 Setting the ID (Barcode) ..................................................................................................................... 2-4

2.2 Changeover .......................................................................................................... 2-6


ds
2.3 Component Supply ............................................................................................... 2-7
an

2.3.1 Parts Empty ........................................................................................................................................ 2-7


2.3.2 Splicing ............................................................................................................................................... 2-8
2.3.3 Splicing Unverified .............................................................................................................................. 2-9
l

2.3.4 Component Verification After Feeder Insertion / Extraction ............................................................. 2-10


ld

2.4 Periodic Check ................................................................................................... 2-11


go

2.5 Periodic Check Errors......................................................................................... 2-12


2.6 Recheck at Error Recovery ................................................................................ 2-13
w.

2.6.1 Releasing the Feeder Jam ............................................................................................................... 2-13

2.7 Dynamic Scanner Location................................................................................. 2-14


ww

3. LNB INITIAL SETTINGS ................................. 3-1


3.1 LNB Initial Settings ............................................................................................... 3-2
3.1.1 Setting the Scanner Location ............................................................................................................. 3-2
3.1.2 Setting the Verification Option ............................................................................................................ 3-5
3.1.3 Setting the ID (Barcode) ..................................................................................................................... 3-7
3.1.4 Setting multi-barcode........................................................................................................................ 3-19

4. MACHINE SETTING........................................ 4-1


4.1 Machine Setting .................................................................................................... 4-2
4.1.1 Setting the Machine Option ................................................................................................................ 4-2

Page 6 EJM5DE-CT-01U-03
NPM / AM
Parts Verification Options(Wired)

5. VERIFICATION ................................................ 5-1


5.1 Changeover Mode ................................................................................................ 5-2
5.1.1 Changeover (For Feeder) ................................................................................................................... 5-2

5.2 Production Mode .................................................................................................. 5-8


5.2.1 Component Supply (For Feeder) ........................................................................................................ 5-8
5.2.2 Tape Splicing..................................................................................................................................... 5-11
5.2.3 Splicing Unverified............................................................................................................................. 5-14
5.2.4 Component Verification After Feeder Insertion / Extraction ..............................................................5-17

6. PERIODIC CHECK .......................................... 6-1


6.1 Periodic Check Mode ........................................................................................... 6-2

om
6.1.1 Overview of Periodic Check ................................................................................................................ 6-2
6.1.2 Changeover Mode ............................................................................................................................... 6-3
6.1.3 Production Mode ................................................................................................................................. 6-7

t.c
7. RECHECK ....................................................... 7-1 m
7.1 Production Mode .................................................................................................. 7-2
ds
7.1.1 Feeder Jam (Feeder Clogging) Release ............................................................................................. 7-2
an

8. APPENDIX ....................................................... 8-1


l

8.1 Command List....................................................................................................... 8-2


ld

8.2 Glossary of Cable Scanner ................................................................................... 8-3


go

8.3 Option License ...................................................................................................... 8-4


8.3.1 Checking the Option License Registration Status............................................................................... 8-4
w.

8.3.2 Registering the Option License ........................................................................................................... 8-5


8.3.3 Deleting the Option License ................................................................................................................ 8-7
ww

EJM5DE-CT-01U-03 Page 7
NPM / AM
Parts Verification Options(Wired)

= MEMO =

om
t.c
m
ds
l an
ld
go
w.
ww

Page 8 EJM5DE-CT-01U-03
NPM / AM
Safety Precautions

Safety precautions Be sure to observe

The precautions that shall be observed in order to prevent an injury to the user or the
other persons, and damage to property, are described as follows.

 The degrees of danger or injury, resulting from incorrect usage owing to failure to read an
indication, are classified and described as follows.

DANGER This indication refers to a situation which is considered that there is

om
imminent danger of death or serious injury.

WARNING This indication refers to a situation which is considered that there is a

t.c
possibility of death or serious injury.

CAUTION This indication refers to a situation which is considered that there is a


m
possibility of only injury or physical damage.
ds
 The matters that shall be observed are classified by the symbols shown below, and
an

described.
(The following are the examples of the symbols.)
l
ld

This kind of symbol indicates an action that must not be carried out.
go

This kind of symbol indicates an action that must be carried out.


w.

This kind of symbol indicates the matters to which attention must be paid.
ww

This indication requires you to read the instruction manuals.

EJM5DE-SF-01U-03 Page S-1


NPM / AM
Safety Precautions

WARNING

om
t.c
m
ds
an
l
ld
go
w.
ww

Page S-2 EJM5DE-SF-01U-03

You might also like