Bioinnova

Tatiana Bilbao
RESEARCH BUILDING
CITY : CULIACÁN ROSALES
COUNTRY : MEXICO
ARCHITECTS: TATIANA BILBAO
AREA : 6260 M²
CONSTRUCTION YEAR : 2012
SINALOA MEXICAN STATE STANDS OUT FOR
ITS AGRICULTURAL PRODUCTION, BECAUSE
OF THIS, THE UNIVERSITY WANTED A
BUILDING THAT COULD BRING TOGETHER
ACADEMIC RESEARCH AND STUDENT WORK
WITH THE DEVELOPMENT OF NEW
TECHNOLOGIES IN PROFESSIONAL LIFE,
GIVING SPACE TO CORPORATIONS.

BUILDING WORK AS LINK BETWEEN ACADEMIC


AND BUSINESS ENVIRONMENTS IN THE STATE
OF SINALOA.

DESIGN CONCEPTS
THE BUILDING WAS DESIGNED TO CONSIDERED
ACADEMIC AND PROFESSIONAL LIFE AS A
GROWING TREE. THE ENTIRE PROGRAM
RELATED TO THE UNIVERSITY IS LOCATED IN
THE BUILDING “ROOTS” WHILE PROFESSIONAL
PROGRAM GROWS ON THE TOP OF IT.
FOLLOWING THE REQUIREMENTS OF SUCH A
FACILITY, THE PROGRAM WAS TRANSLATED
INTO OPEN GEOMETRIC SPACES.
BUILDING )3(
LOCATION
AND HOW TO
REACH IT )1(

1-MAIN ROADS
2-SECONDARY ROADS )3(
3-PARKING LOCATION
4-BUILDING
LAYOUT ANALYSIS
THE BUILDING HAS FOUR ENTRANCES
A TREE FENCE WAS ALSO BUILT IN SOME PLACES TO
AVOID THE NOISE COMING FROM THESE PLACES
GROUND FLOOR
PLAN

Entrances

Hall

Reception and waiting

Bathrooms

Stairs and elevators


FIRST FLOOR PLAN

Reception and waiting Stairs and elevators

offices Bathrooms

Open work space


SECOND FLOOR
PLAN
Reception and waiting

offices

Stairs and elevators

Bathrooms

Meetings room

Hall

Lab
THIRD FLOOR
PLAN
Reception and waiting

offices

Stairs and elevators

Bathrooms

Meetings room

Open work space

Show room
FOURTH FLOOR PLAN

Reception and waiting Stairs and elevators

offices Bathrooms Lab

Open work space Meetings room


METAL STRUCTURE SYSTEM
Construction uses the main components for
conditionate
The large volumes that are located in the central
area and the important location of the system
For more information about the structural system and its loads,
as well as wind loads, soil analysis, and the loads imposed on it,
click here

From the outside you can see how each of the


floors forms a clearly differentiated block 4.4
meters high, reaching a total height of 22.6 m

Inside, the walls of each floor are painted in


different and bright colors (blue,yellow,
green and red) in order to facilitate the
identification of the purposes of each level,
since each box houses different types of
research infrastructure. and development

You might also like