SSYMA P03.14 F103 - VCC Caida de Objetos. V02
SSYMA P03.14 F103 - VCC Caida de Objetos. V02
Consequence
Likelihood
Likelihood
Maximum Foresseable
RAW
N° Threat (Cause)
Risk Score Event (s) N° Consequence with all Risk Score
Mitigating Controls
Preventative Controls Considered
Controls
EXISTING MITIGATING
Total Preventative Control Score Total Mitigating Control
4 Construction of roads without design. 5 1 15 MEDIUM PERDIDA DE CONTROL Score 4
CONTROLS
CONTROLS
DE LA UNIDAD
5 Lack of skill and operator experience. 4 3 18 MEDIUM 5
Improvement
Improvement
Control
Control
11 205 11
12 12
U.E.A. CAROLINA I
CERRO CORONA
LISTA DE VERIFICACION DE CAMPO DE
CONTROLES CRITICOS (VCCC) Código: SSYMA-P03.14-F103
Versión: 02
CAÍDA DE OBJETOS
Fecha de aprob.: 30/08/2023
UNA RESPUESTA "NO" SIGNIFICA QUE EL TRABAJO DEBE SER PARALIZADO HASTA ASEGURAR EL
FUNCIONAMIENTO DEL CONTROL
Observaciones: