REPORT OF DYNAMIC LOAD TEST ON TEST PILE

AT SOUTH END SWEATER COMPANY LTD. UNIT-2

(TP-3, NORTH END AT BH-4 LOCATION)

DOCUMENT No.: SE-G-D-R-003-A1

SOUTH END SWEATER COMPANY LTD.


UNIT-2 AT ASHULIA, DHAKA

Green Concrete
Ground Floor ,11/15 Tajmohol Road,Mohmmedpur, Dhaka - 1208, Bangladesh

E-mail: info.greenconcret@gmail.com; Cell : +88 01711784639


Client: South End Sweater Company ltd

Consultant: Excel Structural Solutions

Contractor: Jonayed Engineering & Construction

Test Conducted by: Green Concrete

Name of the Test: High Strength Dynamic Load Test

Date of Test: 7th July 2022

Location: (23°53'25.4"N 90°21'47.7"E)

Pile ID: TP-3


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

CONTENT

1. INTRODUCTION ............................................................................................................... 2

2. LOCATION OF TEST ........................................................................................................ 2

3. TESTING CONDITION OF TEST PILES AND EQUIPMENT ....................................... 3

4. WORK FLOWCHART ....................................................................................................... 4

5. RESULTS ............................................................................................................................ 5

6. CONCLUSION .................................................................................................................... 7

Appendix-1: Post Analysis Data


Appendix-2: Soil Bore log Data.
Appendix-3: Calibration Certificates
Appendix-4: Inspection Documents
Appendix-5: Pile Drawing
Appendix-6: Test Image

South End Page 1 SE- G-D-R-003


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

1. INTRODUCTION

1.1 General
This report is prepared to represent the bearing capacity of cast-in- place bored pile from
dynamic load test at Unit-2, South End Sweater Co. Ltd at Ashulia. The test was conducted
by GC in presence of professional trained person on date 7th July 2022. This report contains
the load bearing capacity, total resistance, skin friction and integrity condition of pile.

1.2 Scope of the work

Scope of work were set as follows-


❖ Carrying out detail of pile dynamic load test setup that includes-
• Material and instruments required for the test
• Placement of frame & hammer
• Installation of strain & acceleration sensor at 1.5D distance.
• Connecting all device & sensor as per instruction
• Ensure safety provisions
❖ Recording of data.
❖ Submission of report.

1.3 Reference Documents

Reference Standard:

ASTM D 4945: Standard Test Method for High-Strain Dynamic Testing of Piles

Reference Document:

GE-MS-002_ Method Statement on Dynamic Load Test.

2. LOCATION OF TEST

Location of test pile is at Hydrabad bridge with pile demarcation ID TP-3

DLT No. Pile ID Design Length (m) Location


DLT-03 TP-3 26 (23°53'25.4"N 90°21'47.7"E)

South End Page 2 SE- G-D-R-003


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

3. TESTING CONDITION OF TEST PILES AND EQUIPMENT

Physical description of test piles and equipment used are provided in Table 1 and table 2
below.

Table#1 Physical Description of Test Pile


Design Load Expected
Shaft Pile Dia.
Pile ID Date of DLT (MT) Minimum Load
Length (m) (mm)
(MT)

TP-3 7 July-22 26 500 180 450

Table#2 Equipment used for test

No. Description Unit Q’ty Remarks


PDA Testing Unit
1 Accelerometers Pcs 2

2 Strain Transducers Pcs 2

3 Cables Pcs 2

4 PDA/DLT software Unit 1


5
Personal Computer Unit 1

South End Page 3 SE- G-D-R-003


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

No. Description Unit Q’ty Remarks

6 Level Machine Unit 1

7 Drop hammer (weight) nos 1 4.5 ton capacity

8 Guide Frame nos 3 Total 3.6m

9 Crane Unit 1 35 ton capacity

4. WORK FLOWCHART

The work sequence of dynamic testing of piles works is described in the following flow-
charts.

1. Preparation of pile
Investigation

2. Setting of Gauges to pile


laboratory

3. Setting of Equipment

4. Apply Hammer blow & Data


Record

5. Analyzing of Report/Data

Fig: Flow of PDA Testing

South End Page 4 SE- G-D-R-003


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

5. RESULTS

Test Summary (Based on TNO Soil Model):

Test Pile ID TP-3

Pile Dia at Sensors Level (mm) 500

Total Pile length (Pile top to toe) (m) 26.0

Pile Length Below Sensors (m) 25.25

Length of penetration (mm) 25.0

Hammer Weight (kg) 4500

Pile Type Cast-in-situ

Pile Driving Method N/A

Respective Borehole No BH4

Type of Testing Dynamic Load Test


Number of blows applied 2

TNOWAVE analysis done on blow 2

Gross Settlement (mm) 6.0

Net Settlement (mm) 1.5

3.431 MN
Mobilized Static Resistant Shaft
(349.7 Mt)
0.098 MN
Mobilized Static Resistant Toe
(10.0 Mt)
3.529 MN
Mobilized Total Static Resistance
(359.73 Mt)
4.674 MN
Ultimate Capacity As Per Modelled Result
(476 Mt)
Higher than 3.529 MN
Ultimate Capacity As Per IS 2911 (IV) - a
(359.73 Mt)
>239.82 Mt
Safe Capacity As Per IS 2911 (IV)-b

Graphical as well as numerical results of the test is presented in Appendix 1 to Appendix 2

South End Page 5 SE- G-D-R-003


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

Fig: 1 Static capacity form PDA Test

Fig: 2 Modelled Static capacity form PDA Test

South End Page 6 SE- G-D-R-003


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

6. CONCLUSION

In PDA/DLT system, the process of analysis is based on dynamic pile capacity. After having
the information of soil dynamic parameters, the dynamic capacity can be easily converted to
static capacity. BNBC 2020 & IS 2911 (IV) has provided guidelines for interpreting the static
pile capacity and settlement criteria:

a) Two thirds of the final load at which the load displacement attains a value of 12 mm unless
otherwise required in a given case on the basis of nature and type of structure in which
case, the safe load should be corresponding to the stated total displacement permissible.

b) Fifty (50) percent of the final load at which the total displacement equals to 10 percent of
pile diameter case of uniform diameter piles and 7.5 percent of bulb diameter in case of
under-reamed piles.

For TP-3, the gross settlement obtained from this load test is 6.0 mm and net settlement is
1.50 mm according to TNO Soil Model.

According to BNBC 2020 criteria (a), the allowable capacity is two thirds of the final load at
which the load displacement attains a value of 12 mm. For Test TP-3, the gross settlement
obtained from the load was less than 12 mm, so according to BNBC 2020 criteria (a) the
ultimate bearing capacity is less than the mobilised static resistance for the pile as mentioned
in the above table.

According to BNBC 2020 criteria (b), the gross settlement value was far less than 10 percent
of pile diameter (500*0.1= 50 mm). So, the ultimate bearing capacity can,t be defined from
test result but can be define from modelled static load test curve.

From the above criteria & outcome pile capacity can be consider 359.73 Mt with a settlement
6.0mm & modelled ultimate capacity 476 Mt with a settlement 100 mm.

However, Static capacity may also decrease or increase over time after the pile installation, and
both static and dynamic tests represent the capacity at the time of the respective test. Correlations
between measured ultimate axial static compression capacity and dynamic test estimates generally
improve when using dynamic restrike tests that account for soil strength changes with time.

South End Page 7 SE- G-D-R-003


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

Post Analysis Data

South End Appendix 1


Transferred Energy at level 0.000 [m] 9.3 [kNm]
Transferred Energy 2L/c at level 0.000 [m] 9.3 [kNm]
Final set pile toe 0.0 [mm]
Maximum pile toe displ. 1.2 [mm]
Penetration pile toe 25.000 [m]
Blow count Refusal
Set per 10 blows 0.0 [mm]
Total driving resistance 2.149 [MN]
Max. driving resistance 2.256 [MN]
Mobilized static resistance 3.529 [MN]
Mob. static resistance toe 0.098 [MN]
Mob. static resist. shaft 3.431 [MN]
Mob. static resistance toe 0.5 [MPa]
Maximum stresses in pile
Compression stress at level 1.500 [m] 14 [MPa]
Tension stress at level 2.5 [m] -2 [MPa]
Signal match quality
Up to toe 1.8 [%](Good)
Toe 1 2.5 [%](Good)
Toe 2 1.6 [%](Good)
After Toe 0.4 [%](Excellent)
Overall 1.6 [%](Good)
DLTWAVE, PDA/DLT Testing
Project ID :xxx
Project Date :
Project Time :
Program Version :8.1.73
File Version :"8.1.73"
Date Last Run :18-Jul-22
Time Last Run :10:12:31 AM

Input Data
----------
Dimensions Data

Part Number Type Dia.Top Dia.Bottom Length


[m] [m] [m]
Pile 1 Circular 0.5000 0.5000 26.000

Material Data
Part Number E - Density
Modulus
[MPa] [kg/m3]
Pile 1 40000 2400

Soil investigation data


Layer Level Depth Thick SPT Soil
No. ness Value Type
[m] [m]
1 Top -1.000 1.500 5.000 Clay
Bottom -2.500 5.000
2 Top -2.500 1.500 6.000 Clay
Bottom -4.000 6.000
3 Top -4.000 1.500 8.000 Clay
Bottom -5.500 8.000
4 Top -5.500 1.500 14.000 Clay
Bottom -7.000 14.000
5 Top -7.000 1.500 18.000 Clay
Bottom -8.500 18.000
6 Top -8.500 1.500 22.000 Sand
Bottom -10.000 22.000
7 Top -10.000 1.500 26.000 Sand
Bottom -11.500 26.000
8 Top -11.500 1.500 34.000 Sand
Bottom -13.000 34.000
9 Top -13.000 1.500 31.000 Sand
Bottom -14.500 31.000
10 Top -14.500 1.500 41.000 Sand
Bottom -16.000 41.000
11 Top -16.000 1.500 28.000 Sand
Bottom -17.500 28.000
12 Top -17.500 1.500 25.000 Sand
Bottom -19.000 25.000
13 Top -19.000 1.500 34.000 Sand
Bottom -20.500 34.000
14 Top -20.500 1.500 37.000 Sand
Bottom -22.000 37.000
15 Top -22.000 1.500 45.000 Sand
Bottom -23.500 45.000
16 Top -23.500 1.500 50.000 Sand
Bottom -25.000 50.000
17 Top -25.000 1.500 50.000 Sand
Bottom -26.500 50.000
18 Top -26.500 1.500 50.000 Sand
Bottom -28.000 50.000
19 Top -28.000 1.500 50.000 Sand
Bottom -29.500 50.000
20 Top -29.500 1.500 50.000 Sand
Bottom -31.000 50.000

Shaft soil model input


Soil Model = TNO Model
Layer Level Depth Yield Uq1 Uq2 Yield
Beta C1 C2 Alfa
No. stress factor
[m] [KPa] [mm] [mm] -
- [MNs/m3] [MNs/m3] -
Top -1.000 61.5 2.0 2.0 1.000
1.000 0.011 0.010 0.200
Bottom -2.500 43.1 2.0 2.0 1.000
1.000 0.004 0.010 0.200
Top -2.500 188.8 2.0 2.0 1.000
1.000 0.108 0.012 0.200
Bottom -4.000 15.0 2.0 2.0 1.000
1.000 0.337 0.012 0.200
Top -4.000 75.9 2.0 2.0 1.000
1.000 0.009 0.016 0.200
Bottom -5.500 178.4 2.0 2.0 1.000
1.000 0.043 0.016 0.200
Top -5.500 281.0 2.0 2.0 1.000
1.000 0.006 0.028 0.200
Bottom -7.000 5.9 2.0 2.0 1.000
1.000 0.018 0.028 0.200
Top -7.000 35.6 2.0 2.0 1.000
1.000 0.041 0.036 0.200
Bottom -8.500 220.8 2.0 2.0 1.000
1.000 0.013 0.036 0.200
Top -8.500 124.3 2.0 2.0 1.000
1.000 0.022 0.005 1.000
Bottom -10.000 47.8 2.0 2.0 1.000
1.000 0.007 0.005 1.000
Top -10.000 96.4 2.0 2.0 1.000
1.000 0.005 0.006 1.000
Bottom -11.500 14.2 2.0 2.0 1.000
1.000 0.018 0.006 1.000
Top -11.500 244.3 2.0 2.0 1.000
1.000 0.045 0.008 1.000
Bottom -13.000 95.5 2.0 2.0 1.000
1.000 0.080 0.008 1.000
Top -13.000 154.2 2.0 2.0 1.000
1.000 0.015 0.007 1.000
Bottom -14.500 324.7 2.0 2.0 1.000
1.000 0.016 0.007 1.000
Top -14.500 57.6 2.0 2.0 1.000
1.000 0.043 0.009 1.000
Bottom -16.000 289.7 2.0 2.0 1.000
1.000 0.007 0.009 1.000
Top -16.000 85.5 2.0 2.0 1.000
1.000 0.010 0.006 1.000
Bottom -17.500 162.1 2.0 2.0 1.000
1.000 0.008 0.006 1.000
Top -17.500 210.2 2.0 2.0 1.000
1.000 0.013 0.006 1.000
Bottom -19.000 150.7 2.0 2.0 1.000
1.000 0.062 0.006 1.000
Top -19.000 147.7 2.0 2.0 1.000
1.000 0.068 0.008 1.000
Bottom -20.500 3.6 2.0 2.0 1.000
1.000 0.029 0.008 1.000
Top -20.500 17.5 2.0 2.0 1.000
1.000 0.011 0.008 1.000
Bottom -22.000 4.0 2.0 2.0 1.000
1.000 0.014 0.008 1.000
Top -22.000 122.3 2.0 2.0 1.000
1.000 0.008 0.010 1.000
Bottom -23.500 41.0 2.0 2.0 1.000
1.000 0.010 0.010 1.000
Top -23.500 48.5 2.0 2.0 1.000
1.000 0.004 0.011 1.000
Bottom -25.000 41.4 2.0 2.0 1.000
1.000 0.004 0.011 1.000
Top -25.000 67.8 2.0 2.0 1.000
1.000 0.033 0.011 1.000
Bottom -26.500 4.4 2.0 2.0 1.000
1.000 0.029 0.011 1.000
Top -26.500 112.5 2.0 2.0 1.000
1.000 0.011 0.011 1.000
Bottom -28.000 112.5 2.0 2.0 1.000
1.000 0.011 0.011 1.000
Top -28.000 112.5 2.0 2.0 1.000
1.000 0.011 0.011 1.000
Bottom -29.500 112.5 2.0 2.0 1.000
1.000 0.011 0.011 1.000
Top -29.500 112.5 2.0 2.0 1.000
1.000 0.011 0.011 1.000
Bottom -31.000 112.5 2.0 2.0 1.000
1.000 0.011 0.011 1.000
Toe soil model input
Soil Model = TNO Model
Layer Level Depth Yield Uq1 Uq2 Yield
Beta C1 C2 Alfa
No. stress factor
[m] [MPa] [mm] [mm] -
- [MNs/m3] [MNs/m3] -
Top -25.000 2 4.6 4.6 0.100
1.000 1.653 0.522 1.000
Bottom -26.500 2 4.6 4.6 0.100
1.000 1.653 0.522 1.000

Output Data
-----------
Total mobilised static resistance 3.529 [MN]
Static mobilised shaft resistance 3.431 [MN]
Static mobilised toe resistance 0.098 [MN]

Modelled and mobilised static resistance


Layer Depth Modelled Res. Mobilised Res.
[m] [MN] [MN]
1 -1.000 0.123 0.123
2 -2.500 0.240 0.240
3 -4.000 0.300 0.300
4 -5.500 0.338 0.338
5 -7.000 0.302 0.302
6 -8.500 0.203 0.203
7 -10.000 0.130 0.123
8 -11.500 0.400 0.326
9 -13.000 0.564 0.399
10 -14.500 0.409 0.268
11 -16.000 0.292 0.185
12 -17.500 0.425 0.266
13 -19.000 0.178 0.112
14 -20.500 0.025 0.016
15 -22.000 0.192 0.120
16 -23.500 0.106 0.065
17 -25.000 0.073 0.045
18 -26.500 0.000 0.000
19 -28.000 0.000 0.000
20 -29.500 0.000 0.000
--------- ---------
Shaft 4.302 3.431 [MN]
Toe 0.372 0.098 [MN]
--------- ---------
Total 4.674 3.529 [MN]

Mobilised static resistance


Layer Depth Mobilised Res.
[m] [MN]
1 -1.000 0.123
2 -2.500 0.240
3 -4.000 0.300
4 -5.500 0.338
5 -7.000 0.302
6 -8.500 0.203
7 -10.000 0.123
8 -11.500 0.326
9 -13.000 0.399
10 -14.500 0.268
11 -16.000 0.185
12 -17.500 0.266
13 -19.000 0.112
14 -20.500 0.016
15 -22.000 0.120
16 -23.500 0.065
17 -25.000 0.045
18 -26.500 0.000
19 -28.000 0.000
20 -29.500 0.000
---------
Shaft 3.431 [MN]
Toe 0.098 [MN]
---------
Total 3.529 [MN]
South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

Soil Borelog

South End Appendix 2


EXPERT SOIL ENGINEERS & CONSULTANT
SITE:- DAG NO. C. S. & S. A. – 175, R. S. – 179, 179/252, DHAKA CITY JORIP – 318/361, 102, 318, KHATIAN NO. C. S. – 43, S. A. – 56, R. S. – 33, 09, DHAKA
CITY JORIP – 118, 14, 523, DHAKA CITY JORIP – 523, NAMJARI – 137/02, 524, JUTH NO. – 138/02, J. L. NO. C. S. – 207, S. A. – 02, R. S. – 02, DHAKA CITY
JORIP – 112, MOUZA – ASHUTIA, P. S. – TURAG, DIST. – DHAKA, BANGLADESH.

Date of Start :- 18/4/2022 Type of Drilling : Manual drive (Hand Wash)


Date of Completion :- 18/4/2022 TBM taken on top of Carpeting road, TBM = 100.00
Weather :- Sunny RL = 0'-0" GWL = - 9'-2"
Bore Hole No. : 04 (Four) Total Depth = 100' - 0"
Thickness in feet

S.P.T S.P.T. Graph


Depth in meter

Depth in feet

Sample Type
Boring Dia
Graphics
Discription of Classification (Visual)

15cm
15cm
15cm
30cm
0 10 20 30 40 50 60 70 80 90 100

1.52 5 Sand and Etc. Filling 1 1 1 2 D-1


6'-0"
3.04 10 1 2 3 5 D-2

4.56 15 Reddish medium stiff Plastic CLAY with 2 3 3 6 D-3


trace fine sand and some silt
6.08 20 3 3 5 8 D-4
27'-0"
7.60 25 Reddish stiff High Plastic CLAY with 5 6 8 14 D-5
trace fine sand and some silt
27'-0"
9.12 30 6 7 11 18 D-6

10.64 35 7 10 12 22 D-7

12.16 40 6 12 14 26 D-8

13.68 45 8 14 20 34 D-9
Light Brown medium dense to dense
fine SAND with little to trace some
15.20 50 silt and mica
9 13 18 31 D-10

16.72 55 12 19 22 41 D-11

18.24 60 7 9 19 28 D-12

19.76 65 8 10 15 25 D-13

21.28 70 69'-0" 10 15 19 34 D-14

22.80 75 12 17 20 37 D-15

24.32 80 13 20 25 45 D-16

25.84 85 Brown dense to very dense fine 15 25 25 50 D-17


SAND with trace some silt
27.36 90 17 28 22 50 D-18

28.88 95 19 30 20 50 D-19

30.40 100 100'-0" 22 35 15 50 D-20

SAND SAMPLES ……… CLAY SAMPLES ……… UNDISTURBED SAMPLES ………


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

Calibration Certificates

South End Appendix 3


Calibration Certificate of
the Profound acceleration sensor

Sensor data
Serial number AC1147
Type Piezoresistive accelerometer
Range > (-5000…+5000) g
Frequency range DC to > 8000 Hz
Damping ratio 0.7

Electrical Test:
Offset +/- [mV] @ 10V
Input impedance 1671 [Ω]
Output impedance 887 [Ω]
Operating temp. -40 to 120 [°C]
Max. excitation 12 [V]

Calibration data
Sensitivity @ 1000g, 700 Hz 0.0276 [mV/g] @ 10 V excitation

Wiring: Transducer Cable Connector Souriau 6p male


Input + Red Brown Input + Terminal B
Input - Black Yellow Input - Terminal C
Output + Green Green Output + Terminal E
Output - White White Output - Terminal D
TEDS Terminal A - C

Date: 8-10-2020 Signature:

Note: The above accelerometer has been calibrated against a reference instrument traceable to ISO 5347.
Calibration Certificate of
the Profound acceleration sensor

Sensor data
Serial number AC1149
Type Piezoresistive accelerometer
Range > (-5000…+5000) g
Frequency range DC to > 8000 Hz
Damping ratio 0.7

Electrical Test:
Offset +/- [mV] @ 10V
Input impedance 1670 [Ω]
Output impedance 886 [Ω]
Operating temp. -40 to 120 [°C]
Max. excitation 12 [V]

Calibration data
Sensitivity @ 1000g, 700 Hz 0.0265 [mV/g] @ 10 V excitation

Wiring: Transducer Cable Connector Souriau 6p male


Input + Red Brown Input + Terminal B
Input - Black Yellow Input - Terminal C
Output + Green Green Output + Terminal E
Output - White White Output - Terminal D
TEDS Terminal A - C

Date: 8-10-2020 Signature:

Note: The above accelerometer has been calibrated against a reference instrument traceable to ISO 5347.
Calibration Certificate of
the Profound strain sensor

Sensor data
Serial number ST1289
Strain range -2000…+2000 µm/m (IAW ASTM D4945-17)
Bridge resistance 350 Ohm
Strain gauges 4 foil gauges
Insulation resistance >10 GOhm
Cable Unitronic FD P plus 4x 0.14

Wiring:

Calibration data
Static Calibration Number 4.70
Sensitivity (S) 2.35 µV/V.µStrain
Zero load output 1.8 µV/Volt

Date: 14-10-2020 Signature:


Calibration Certificate of
the Profound strain sensor

Sensor data
Serial number ST1290
Strain range -2000…+2000 µm/m (IAW ASTM D4945-17)
Bridge resistance 350 Ohm
Strain gauges 4 foil gauges
Insulation resistance >10 GOhm
Cable Unitronic FD P plus 4x 0.14

Wiring:

Calibration data
Static Calibration Number 4.24
Sensitivity (S) 2.12 µV/V.µStrain
Zero load output 35.6 µV/Volt

Date: 14-10-2020 Signature:


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

Inspection Documents

South End Appendix 4


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

Pile Drawing

South End Appendix 5


South End Sweater Company ltd Unit-2 Report on High Strength Dynamic Load Test on CIP Pile

Test Image

South End Appendix 6

You might also like