Accommodating our Energy Generation Surplus with the use of ESS : A Government VGF Scheme

The Government of India released a Viability Gap Funding Scheme for Energy Storage Schemes worth over $1.1B USD
focusing on reducing the cost of storage systems. This scheme will include both Pumped Storage Systems (PSS) and
Battery Energy Storage Systems (BESS) awarding legal status and reducing regulations on ESS.
Expected Growth of BESS Introduction of Viability Gap Funding Scheme for Battery Energy Storage System Projects

CAGR : 17.8% Proposed Capacity: 4000MWh This enables the company to


OF the storage capacity
gain access to an Inter State
41.6 Capital Support: 40% must be allocated to
85% transmission Grid on priority
8.6 In GWh Distribution companies
basis. Rest 25% can be sold to
Total Capital: $452M USD if the scheme is taken
'26-’27 ’29-’30 other consumers

Benefits of ESS to the consumers Concessional Green Mandating new RE Increasing energy
Finance establishment projects (>5MW) to storage obligation
PROPOSED STRATEGIES

• Reduction in peak deficit 1 for long term finance by 3 install at least 5% ESS 5 from 1% (‘23-’24) to 4%
• Reduction in peak tariff bodies such as PFC, excluding Hydro power (‘29-’30) and
• Carbon emission reduction REC, IREDA. plants increasing total RPO.
• Buy Low, Use High

Benefits of ESS to Power Sector


Wavering Interstate Minimum percentage ESS developers and
transmission costs and of power to be intermediate agencies
• Reduced Fluctuations
2 new guidelines for 4 obtained through RE are permitted to offer
• Reliability and Stability 6
Round the Clock ESS within a particular other market based
• Increased use of RE
(RTC) RE bidding. area of distribution energy, power products*
• Energy Independence

Gowthamraja RM grm@180dc.org NIT Trichy Department of Electrical and Electronics Engineering *Spot Energy Market, Energy Arbitrage