1 DUMP TRUCK 3-4 M3 E-1 115.0 3.50 Ton 6.00 6.00 1,500.00 Rp E - 1 391,000,000.00
2 EXCAVATOR 80-140 HP E-2 135.0 0.90 M3 5.00 5.00 1,500.00 Rp E - 2 1,751,530,000.00
3 BULLDOZER 100-150 HP E-3 155.0 - - 5.00 5.00 1,500.00 Rp E - 3 3,315,180,000.00
4 MOTOR GRADER >100 HP E-4 135.0 - - 5.00 5.00 1,500.00 Rp E - 4 2,381,500,000.00
5 VIBRATOR ROLLER 5-8 T. E-5 100.0 8.00 Ton 5.00 5.00 1,500.00 Rp E - 5 1,240,000,000.00
6 PNEUMATIC T. ROLLER 8-15 T. E-6 129.0 8.00 Ton 5.00 5.00 1,500.00 Rp E - 6 1,423,300,000.00
7 TANDEM ROLER 6-8 T E-7 83.0 8.00 Ton 5.00 5.00 1,500.00 Rp E - 7 1,315,000,000.00
8 CONCRETE MIXER 0.3-0.6 M3 E-8 10.0 500.00 Liter 5.00 5.00 1,500.00 Rp E - 8 75,515,000.00
9 WATER PUMP 70-100 mm E-9 8.0 30.00 M3/hari 5.00 5.00 1,500.00 Rp E - 9 7,500,000.00
10 WATER TANKER 3000-4500 L. E - 10 115.0 4,000.00 Liter 5.00 5.00 1,500.00 Rp E - 10 350,000,000.00
11 CHAIN SAW (MESIN POTONG E - 11 10.0 - - 5.00 5.00 1,200.00 Rp E - 11 5,500,000.00
12 COMPRESSOR 4000-6500 L\M E - 12 80.0 - - 5.00 5.00 2,000.00 Rp E - 12 50,000,000.00
13 ASPHALT SPRAYER E - 13 15.0 800.00 Liter 5.00 5.00 1,200.00 Rp E - 13 45,000,000.00
14 FARM TRACTOR (ROTARI) M 5 E - 14 50.0 2.00 Ton 5.00 5.00 1,200.00 Rp E - 14 295,000,000.00
15 STAMPER E - 15 5.0 0.20 Ton 5.00 5.00 1,200.00 Rp E - 15 32,500,000.00
16 WHELL LOADER E - 16 95.0 1.50 M3 5.00 5.00 1,200.00 Rp E - 16 1,696,580,000.00
17 ASPHALT FINIZHER E - 17 144.0 - - 5.00 5.00 1,200.00 Rp E - 17 1,977,960,000.00
18 GENERATOR ZET E - 18 50.0 - - 5.00 5.00 1,200.00 Rp E - 18 35,000,000.00
19 ASPHAL MIXING PLANT (AMP) E - 19 150.0 30.00 Ton/Jam 10.00 10.00 1,200.00 Rp E - 19 3,220,525,000.00
20 MINI EXCAVATOR - COBELCO E - 20 50.0 - - 5.00 5.00 800.00 Rp E - 20 554,400,000.00
KETERANGAN :
1 Tingkat Suku Bunga i = 10.00 % per-tahun
2 Asuransi, Pajak, dll i = 0.0020
3 Jam kerja efektif per hari Tk = 7 Jam
4 Jarak Merauke ke lokasi Proyek L = 5.00 Kilo Meter
5 Upah Operator / Sopir / Mekanik L-6 = 24,000.00 Rupiah per-orang/jam
6 Upah Pembantu Operator/Sopir/Mekan L-7 = 16,858.00 Rupiah per-orang/jam
7 Harga Bahan Bakar Bensin MA.1 = 10,640.00 Rupiah per-liter
8 Harga Bahan Bakar Solar MA.2 = 10,099.00 Rupiah per-liter
9 Minyak Pelumas MA.4 = 34,846.00 Rupiah per-liter
10 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan = DUMP TRUCK 3-4 M3 E-1
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 3.5 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 391,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 391,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 145,173.13 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 40,072.90 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 32,583.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : EXCAVATOR 80-140 HP E-2
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp 0.90 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,751,530,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,751,530,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 170,420.63 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 47,042.10 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 145,960.83 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : BULLDOZER 100-150 HP E-3
2. Tenaga Pw 155.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 3,315,180,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 3,315,180,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 195,668.13 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 54,011.30 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 276,265.00 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : MOTOR GRADER >100 HP E-4
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 2,381,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 2,381,500,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 170,420.63 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 47,042.10 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 198,458.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : VIBRATOR ROLLER 5-8 T. E-5
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,240,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,240,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 126,237.50 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 34,846.00 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 103,333.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : PNEUMATIC T. ROLLER 8-15 T. E-6
2. Tenaga Pw 129.0 HP
3. Kapasitas Cp 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,423,300,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,423,300,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 162,846.38 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 44,951.34 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 118,608.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : TANDEM ROLER 6-8 T E-7
2. Tenaga Pw 83.0 HP
3. Kapasitas Cp 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,315,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,315,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 104,777.13 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 28,922.18 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 109,583.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E-8
2. Tenaga Pw 10.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 75,515,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 75,515,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 12,623.75 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 3,484.60 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 6,292.92 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm E-9
2. Tenaga Pw 8.0 HP
3. Kapasitas Cp 30.0 M3/hari
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 7,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 7,500,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H 10,640.00 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 2,787.68 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 625.00 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E - 10
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 350,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 350,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 145,173.13 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 40,072.90 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 29,166.67 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : CHAIN SAW (MESIN POTONG KAYU) E - 11
2. Tenaga Pw 10.0 HP
3. Kapasitas Cp -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 5,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 5,500,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H 13,300.00 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 3,484.60 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 572.92 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E - 12
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 50,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 50,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H 106,400.00 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 27,876.80 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 3,125.00 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E - 13
2. Tenaga Pw 15.0 HP
3. Kapasitas Cp 800.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 45,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 45,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 18,935.63 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 5,226.90 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 4,687.50 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan FARM TRACTOR (ROTARI) M 5000 E - 14
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp 2.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 295,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 295,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 63,118.75 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 17,423.00 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 30,729.17 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan STAMPER E - 15
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 0.2 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 32,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 32,500,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 6,650.00 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 1,742.30 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 3,385.42 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WHELL LOADER E - 16
2. Tenaga Pw 95.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 1,696,580,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 1,696,580,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 119,925.63 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 33,103.70 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 176,727.08 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINIZHER E - 17
2. Tenaga Pw 144.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 1,977,960,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 1,977,960,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 181,782.00 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 50,178.24 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 206,037.50 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR ZET E - 18
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 35,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 35,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 63,118.75 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 17,423.00 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 3,645.83 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHAL MIXING PLANT (AMP) E - 19
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 30.0 Ton/Jam
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 3,220,525,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 3,220,525,000 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 78,403.50 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 402,565.63 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 24,000.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 16,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan MINI EXCAVATOR - COBELCO E - 20
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 800.0 Jam
c. Harga Alat B 554,400,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 800.0 Jam
c. Harga Alat (*) B' 554,400,000 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 24,000.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.So L-7 16,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 10,640.00 Liter
6 Bahan Bakar Solar MA.2 10,099.00 Liter
7 Minyak Pelumas MA.4 34,846.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Harga Satuan Bahan, Upah dan Alat
1 DUMP TRUCK 3-4 M3 E-1 115 3.50 Ton 391,000,000.00 6 1500 391,000,000.00 39,100,000.00 0.22961 53,865.89 521.33 54,387.22 0.125 0.010 185,246.03 0.125 32,583.33 24,000.00 16,858.00 258,687.36 313,074.00 0
2 EXCAVATOR 80-140 HP E-2 135 0.90 M3 1,751,530,000.00 5 1500 1,751,530,000.00 175,153,000.00 0.26380 277,229.52 2,335.37 279,564.89 0.125 0.010 217,462.73 0.125 145,960.83 24,000.00 16,858.00 404,281.56 683,846.00 0
3 BULLDOZER 100-150 HP E-3 155 - - 3,315,180,000.00 5 1500 3,315,180,000.00 331,518,000.00 0.26380 524,721.68 4,420.24 529,141.92 0.125 0.010 249,679.43 0.125 276,265.00 24,000.00 16,858.00 566,802.43 1,095,944.00 0
4 MOTOR GRADER >100 HP E-4 135 - - 2,381,500,000.00 5 1500 2,381,500,000.00 238,150,000.00 0.26380 376,940.22 3,175.33 380,115.55 0.125 0.010 217,462.73 0.125 198,458.33 24,000.00 16,858.00 456,779.06 836,894.00 0
5 VIBRATOR ROLLER 5-8 T. E-5 100 8.00 Ton 1,240,000,000.00 5 1500 1,240,000,000.00 124,000,000.00 0.26380 196,265.33 1,653.33 197,918.66 0.125 0.010 161,083.50 0.125 103,333.33 24,000.00 16,858.00 305,274.83 503,193.00 0
6 PNEUMATIC T. ROLLER 8-15 T. E-6 129 8.00 Ton 1,423,300,000.00 5 1500 1,423,300,000.00 142,330,000.00 0.26380 225,277.77 1,897.73 227,175.51 0.125 0.010 207,797.72 0.125 118,608.33 24,000.00 16,858.00 367,264.05 594,439.00 0
7 TANDEM ROLER 6-8 T E-7 83 8.00 Ton 1,315,000,000.00 5 1500 1,315,000,000.00 131,500,000.00 0.26380 208,136.21 1,753.33 209,889.55 0.125 0.010 133,699.31 0.125 109,583.33 24,000.00 16,858.00 284,140.64 494,030.00 0
8 CONCRETE MIXER 0.3-0.6 M3 E-8 10 500.00 Liter 75,515,000.00 5 1500 75,515,000.00 7,551,500.00 0.26380 11,952.40 100.69 12,053.09 0.125 0.010 16,108.35 0.125 6,292.92 24,000.00 16,858.00 63,259.27 75,312.00 0
9 WATER PUMP 70-100 mm E-9 8 30.00M3/hari 7,500,000.00 5 1500 7,500,000.00 750,000.00 0.26380 1,187.09 10.00 1,197.09 0.125 0.010 13,427.68 0.125 625.00 24,000.00 16,858.00 54,910.68 56,107.00 0
10 WATER TANKER 3000-4500 L. E - 10 115 4000.00 Liter 350,000,000.00 5 1500 350,000,000.00 35,000,000.00 0.26380 55,397.47 466.67 55,864.14 0.125 0.010 185,246.03 0.125 29,166.67 24,000.00 16,858.00 255,270.69 311,134.00 0
11 CHAIN SAW (MESIN POTONG KAYU) E - 11 10 - - 5,500,000.00 5 1200 5,500,000.00 550,000.00 0.26380 1,088.16 9.17 1,097.33 0.125 0.010 16,784.60 0.125 572.92 24,000.00 16,858.00 58,215.52 59,312.00 0
12 COMPRESSOR 4000-6500 L\M E - 12 80 - - 50,000,000.00 5 2000 50,000,000.00 5,000,000.00 0.26380 5,935.44 50.00 5,985.44 0.125 0.010 134,276.80 0.125 3,125.00 24,000.00 16,858.00 178,259.80 184,245.00 0
13 ASPHALT SPRAYER E - 13 15 800.00 Liter 45,000,000.00 5 1200 45,000,000.00 4,500,000.00 0.26380 8,903.16 75.00 8,978.16 0.125 0.010 24,162.53 0.125 4,687.50 24,000.00 16,858.00 69,708.03 78,686.00 0
14 FARM TRACTOR (ROTARI) M 5000 E - 14 50 2.00 Ton 295,000,000.00 5 1200 295,000,000.00 29,500,000.00 0.26380 58,365.19 491.67 58,856.86 0.125 0.010 80,541.75 0.125 30,729.17 24,000.00 16,858.00 152,128.92 210,985.00 0
15 STAMPER E - 15 5 0.20 Ton 32,500,000.00 5 1200 32,500,000.00 3,250,000.00 0.26380 6,430.06 54.17 6,484.23 0.125 0.010 8,392.30 0.125 3,385.42 24,000.00 16,858.00 52,635.72 59,119.00 0
16 WHELL LOADER E - 16 95 1.50 M3 1,696,580,000.00 5 1200 1,696,580,000.00 169,658,000.00 0.26380 335,665.15 2,827.63 338,492.78 0.125 0.010 153,029.33 0.125 176,727.08 24,000.00 16,858.00 370,614.41 709,107.00 0
17 ASPHALT FINIZHER E - 17 144 - - 1,977,960,000.00 5 1200 1,977,960,000.00 197,796,000.00 0.26380 391,335.65 3,296.60 394,632.25 0.125 0.010 231,960.24 0.125 206,037.50 24,000.00 16,858.00 478,855.74 873,487.00 0
18 GENERATOR ZET E - 18 50 - - 35,000,000.00 5 1200 35,000,000.00 3,500,000.00 0.26380 6,924.68 58.33 6,983.02 0.125 0.010 80,541.75 0.125 3,645.83 24,000.00 16,858.00 125,045.58 132,028.00 0
19 ASPHAL MIXING PLANT (AMP) E - 19 150 30.00Ton/Jam 3,220,525,000.00 10 1200 3,220,525,000.00 322,052,500.00 0.16275 393,094.21 5,367.54 398,461.75 0.150 0.015 6,365,031.00 0.150 402,565.63 24,000.00 16,858.00 6,808,454.63 7,206,916.00 0
20 MINI EXCAVATOR - COBELCO E - 20 50 - - 554,400,000.00 5 800 554,400,000.00 55,440,000.00 0.26380 164,530.49 1,386.00 165,916.49 0.125 0.010 80,541.75 0.125 86,625.00 24,000.00 16,858.00 208,024.75 373,941.00 0
26 Kawat burung MN.26 M² 22,000 0.00% AAL.D.26 13,620.00 M - - - - - - 540.00 M - - - - - - AAD.D.26 5.00 - 0.0538 0.1023 1.0000 - 0.4838 - 14,988.72 - - 7,050.36 - 734.00 734.00 22,734.00 3,410.00 26,144.00
27 Kawat Duri Baja 30 M MD.27 KG 15,280 0.00% AAL.D.27 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.27 5.00 - 0.0006 0.0011 1.0000 - 0.0035 - 162.16 - - 50.85 - 210.00 210.00 15,490.00 2,323.00 17,813.00
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23
28 Kawat Las 0.26 MD.28 Dos 155,000 0.00% AAL.D.28 25,000.00 Dus - - - - - - 1,000.00 Dus - - - - - - AAD.D.28 5.00 - 0.0007 0.0013 1.0000 - 0.0039 - 182.29 - - 57.16 - 230.00 230.00 155,230.00 23,284.00 178,514.00
29 Timah Solder MD.29 Kg 56,250 0.00% AAL.D.29 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.29 5.00 - 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 56,330.00 8,449.00 64,779.00
30 Baut Jembatan Dia. 19 mm MD.30 Kg 15,000 0.00% AAL.D.30 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.30 5.00 - 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 15,230.00 2,284.00 17,514.00
31 Baut Dia, 3/8" - 17.5 + Mur - Ring MD.31 Buah 4,500 0.00% AAL.D.31 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.31 5.00 - 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 4,730.00 709.00 5,439.00
32 Baut Dia, 3/8" - 12.0/15.0 + Mur - Ring MD.32 Buah 3,333 0.00% AAL.D.32 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.32 5.00 - 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 3,563.00 534.00 4,097.00
33 Baut Dia, 3/8" - 20.0 + Mur - Ring MD.33 Buah 4,262 0.00% AAL.D.33 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.33 5.00 - 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 4,492.00 673.00 5,165.00
34 Baut Dia, 3/8" - 35.0 + Mur - Ring MD.34 Buah 6,000 0.00% AAL.D.34 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.34 5.00 - 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 6,230.00 934.00 7,164.00
35 Besi angkur dia. 8 mm MN.35 Buah 10,000 0.00% AAL.D.35 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.D.35 5.00 - 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 10,230.00 1,534.00 11,764.00
36 Kasa (Ram Ayam) Dia, 10 mm MD.36 M 21,375 0.00% AAL.D.36 60,000.00 M - - - - - - 2,000.00 M - - - - - - AAD.D.36 5.00 - 0.0277 0.0145 1.0000 - 0.1107 - 7,716.61 - - 1,613.21 - 310.00 310.00 21,685.00 3,252.00 24,937.00
37 Besi Siku 30 . 30 . 3 - L = 6 Meter MD.37 Batang 74,833 0.00% AAL.D.37 5,927.00 Batang - - - - - - 237.00 Batang - - - - - - AAD.D.37 5.00 - 0.0064 0.0050 1.0000 - 0.0256 - 1,784.82 - - 373.13 - 2,150.00 2,150.00 76,983.00 11,547.00 88,530.00
38 Besi Siku 50 . 50 . 5 - L = 6 Meter MD.38 Batang 159,375 0.00% AAL.D.38 2,134.00 Batang - - - - - - 85.00 Batang - - - - - - AAD.D.38 5.00 - 0.0189 0.0147 1.0000 - 0.0755 - 5,261.08 - - 1,099.87 - 6,360.00 6,360.00 165,735.00 24,860.00 190,595.00
39 Besi Siku 50 . 50 . 6 - L = 6 Meter MD.39 Batang 189,000 0.00% AAL.D.39 1,778.00 Batang - - - - - - 71.00 Batang - - - - - - AAD.D.39 5.00 - 0.0198 0.0153 1.0000 - 0.0790 - 5,509.46 - - 1,151.79 - 6,660.00 6,660.00 195,660.00 29,349.00 225,009.00
40 Besi Siku 40 . 40 . 4 - L = 6 Meter MD.40 Batang 128,750 0.00% AAL.D.40 3,334.00 Batang - - - - - - 133.00 Batang - - - - - - AAD.D.40 5.00 - 0.0100 0.0077 1.0000 - 0.0402 - 2,799.55 - - 585.27 - 3,380.00 3,380.00 132,130.00 19,819.00 151,949.00
41 Besi Siku 40 . 40 . 5 - L = 6 Meter MD.41 Batang 95,000 0.00% AAL.D.41 2,667.00 Batang - - - - - - 106.00 Batang - - - - - - AAD.D.41 5.00 - 0.0180 0.0142 1.0000 - 0.0720 - 5,017.02 - - 1,048.84 - 6,060.00 6,060.00 101,060.00 15,159.00 116,219.00
42 Besi Siku 20 . 20 . 3 - L = 6 Meter MD.42 Batang 67,500 0.00% AAL.D.42 8,891.00 Batang - - - - - - 355.00 Batang - - - - - - AAD.D.42 5.00 - 0.0039 0.0031 1.0000 - 0.0158 - 1,099.83 - - 229.93 - 1,320.00 1,320.00 68,820.00 10,323.00 79,143.00
43 Besi Plat 1.0 mm - 120 x 240 Cm MD.43 Lembar 330,000 0.00% AAL.D.43 2,222.00 Lembar - - - - - - 88.00 Lembar - - - - - - AAD.D.43 5.00 - 0.0187 0.0171 1.0000 - 0.0747 - 5,209.52 - - 1,089.09 - 6,290.00 6,290.00 336,290.00 50,443.00 386,733.00
44 Besi Plat 1.2 mm - 120 x 240 Cm MD.44 Lembar 376,250 0.00% AAL.D.44 1,852.00 Lembar - - - - - - 74.00 Lembar - - - - - - AAD.D.44 5.00 - 0.0195 0.0176 1.0000 - 0.0781 - 5,447.23 - - 1,138.78 - 6,580.00 6,580.00 382,830.00 57,424.00 440,254.00
45 Besi Plat 2.0 mm - 120 x 240 Cm MD.45 Lembar 556,750 0.00% AAL.D.45 1,111.00 Lembar - - - - - - 44.00 Lembar - - - - - - AAD.D.45 5.00 - 0.0253 0.0197 1.0000 - 0.2023 - 7,051.72 - - 2,948.42 - 10,000.00 10,000.00 566,750.00 85,012.00 651,762.00
46 Besi Plat 3.0 mm - 120 x 240 Cm MD.46 Lembar 874,500 0.00% AAL.D.46 740.00 Lembar - - - - - - 29.00 Lembar - - - - - - AAD.D.46 5.00 - 0.0296 0.0181 1.0000 - 0.2366 - 8,245.33 - - 3,447.48 - 11,690.00 11,690.00 886,190.00 132,928.00 1,019,118.00
47 Besi Plat 12 mm -120 x 240 cm MD.47 Lembar 400,000 0.00% AAL.D.47 185.00 Lembar - - - - - - 7.00 Lembar - - - - - - AAD.D.47 5.00 - 0.0879 0.0435 1.0000 - 0.8793 - 24,515.83 - - 12,813.01 - 37,320.00 37,320.00 437,320.00 65,598.00 502,918.00
48 Besi Strip 20.2 MD.48 Batang 30,166 0.00% AAL.D.48 32,010.00 Batang - - - - - - 1,280.00 Batang - - - - - - AAD.D.48 5.00 - 0.0011 0.0010 1.0000 - 0.0042 - 293.71 - - 61.40 - 350.00 350.00 30,516.00 4,577.00 35,093.00
49 Besi Strip 30.3 MD.49 Batang 43,500 0.00% AAL.D.49 14,226.00 Batang - - - - - - 569.00 Batang - - - - - - AAD.D.49 5.00 - 0.0025 0.0024 1.0000 - 0.0099 - 687.47 - - 143.72 - 830.00 830.00 44,330.00 6,649.00 50,979.00
50 Besi Strip 40.4 MD.50 Batang 50,166 0.00% AAL.D.50 8,002.00 Batang - - - - - - 320.00 Batang - - - - - - AAD.D.50 5.00 - 0.0048 0.0047 1.0000 - 0.0191 - 1,334.34 - - 278.95 - 1,610.00 1,610.00 51,776.00 7,766.00 59,542.00
51 Besi Strip 50.5 MD.51 Batang 72,500 0.00% AAL.D.51 5,121.00 Batang - - - - - - 204.00 Batang - - - - - - AAD.D.51 5.00 - 0.0066 0.0065 1.0000 - 0.0264 - 1,842.33 - - 385.15 - 2,220.00 2,220.00 74,720.00 11,208.00 85,928.00
52 Waltermur Dia 16 mm MD.52 Buah 13,500 0.00% AAL.D.52 5,000.00 Buah - - - - - - 200.00 Buah - - - - - - AAD.D.52 5.00 - 0.0096 0.0159 1.0000 - 0.0384 - 2,679.30 - - 560.13 - 3,230.00 3,230.00 16,730.00 2,509.00 19,239.00
53 Gording lips chanel 150.65.20.2,3 ( 6 N ) MD.53 Batang 725,000 0.00% AAL.D.53 5,000.00 Batang - - - - - - 200.00 Batang - - - - - - AAD.D.53 5.00 - 0.0096 0.0159 1.0000 - 0.0384 - 2,679.30 - - 560.13 - 3,230.00 3,230.00 728,230.00 109,234.00 837,464.00
54 Baja profil IWF MD.54 KG 21,000 0.00% AAL.D.54 46,860.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.54 5.00 - 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 21,190.00 3,178.00 24,368.00
55 Besi gording canal MD.55 KG 21,500 0.00% AAL.D.55 46,860.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.55 5.00 - 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 21,690.00 3,253.00 24,943.00
56 Water mur MD.56 KG 5,000 0.00% AAL.D.56 46,860.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.56 5.00 - 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 5,190.00 778.00 5,968.00
57 Sealent MD.57 Tube 15,000 0.00% AAL.D.57 46,860.00 Tube - - - - - - 2,000.00 Tube - - - - - - AAD.D.57 5.00 - 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 15,190.00 2,278.00 17,468.00
F. BAHAN KERAMIK -
1 Ubin Abu-Abu 20 x 20 Cm MF.1 Buah 2,606 0.00% AAL.F.1 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.1 5.00 - 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 2,706.00 405.00 3,111.00
2 Ubin Abu-Abu 30 x 30 Cm MF.2 Buah 6,590 0.00% AAL.F.2 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.2 5.00 - 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 6,760.00 1,014.00 7,774.00
3 Ubin Abu-Abu 40 x 40 Cm MF.3 Buah 14,208 0.00% AAL.F.3 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.3 5.00 - 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 14,508.00 2,176.00 16,684.00
4 Ubin Warna 20 x 20 Cm MF.4 Buah 2,650 0.00% AAL.F.4 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.4 5.00 - 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 2,750.00 412.00 3,162.00
5 Ubin Warna 30 x 30 Cm MF.5 Buah 5,848 0.00% AAL.F.5 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.5 5.00 - 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 6,018.00 902.00 6,920.00
6 Ubin Warna 40 x 40 Cm MF.6 Buah 13,958 0.00% AAL.F.6 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.6 5.00 - 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 14,258.00 2,138.00 16,396.00
7 Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah 6,045 0.00% AAL.F.7 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.7 5.00 - 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 6,215.00 932.00 7,147.00
8 Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah 14,958 0.00% AAL.F.8 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.8 5.00 - 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 15,258.00 2,288.00 17,546.00
9 Ubin Granito Ukuran 30 x 30 cm MF.9 Buah 5,909 0.00% AAL.F.9 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.9 5.00 - 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 6,079.00 911.00 6,990.00
10 Ubin Granito Ukuran 40 x 40 cm MF.10 Buah 22,500 0.00% AAL.F.10 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.10 5.00 - 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 22,800.00 3,420.00 26,220.00
11 Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah 6,704 0.00% AAL.F.11 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.11 5.00 - 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 6,874.00 1,031.00 7,905.00
12 Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah 13,958 0.00% AAL.F.12 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.12 5.00 - 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 14,258.00 2,138.00 16,396.00
13 Ubin Teralux Marmer Ukuran 30 x 30 cm MF.13 Buah 8,750 0.00% AAL.F.13 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.13 5.00 - 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 8,920.00 1,338.00 10,258.00
14 Ubin Teralux Marmer Ukuran 40 x 40 cm MF.14 Buah 21,458 0.00% AAL.F.14 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.14 5.00 - 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 21,758.00 3,263.00 25,021.00
15 Ubin Teralux Marmer Ukuran 60 x 60 cm MF.15 Buah 63,500 0.00% AAL.F.15 5,000.00 Buah - - - - - - 200.00 Buah - - - - - - AAD.F.15 5.00 - 0.0035 0.0024 1.0000 - 0.0141 - 985.73 - - 206.07 - 1,190.00 1,190.00 64,690.00 9,703.00 74,393.00
16 Keramik Artistik 10x20; 15x15 cm MF.16 Buah 1,175 0.00% AAL.F.16 294,117.00 Buah - - - - - - 11,764.00 Buah - - - - - - AAD.F.16 5.00 - 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 1,255.00 188.00 1,443.00
17 Keramik Artistik 10x10 atau 5x20 cm MF.17 Buah 650 0.00% AAL.F.17 588,235.00 Buah - - - - - - 23,529.00 Buah - - - - - - AAD.F.17 5.00 - 0.0003 0.0003 1.0000 - 0.0010 - 70.59 - - 14.76 - 80.00 80.00 730.00 109.00 839.00
18 Keramik Lantai 20 x 20 cm MF.18 Buah 2,686 0.00% AAL.F.18 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.18 5.00 - 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 2,786.00 417.00 3,203.00
19 Keramik Lantai 20 x 30 cm MF.19 Buah 3,750 0.00% AAL.F.19 72,727.00 Buah - - - - - - 2,909.00 Buah - - - - - - AAD.F.19 5.00 - 0.0004 0.0004 1.0000 - 0.0017 - 115.44 - - 24.13 - 130.00 130.00 3,880.00 582.00 4,462.00
20 Keramik Lantai 30 x 30 cm MF.20 Buah 5,962 0.00% AAL.F.20 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.20 5.00 - 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 6,132.00 919.00 7,051.00
21 Keramik Lantai 30 x 30 berglasir MF.21 Buah 5,909 0.00% AAL.F.21 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.21 5.00 - 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 6,079.00 911.00 6,990.00
22 Keramik Lantai 30 x 30 berglasir (Mozaik) MF.22 Buah 6,136 0.00% AAL.F.22 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.22 5.00 - 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 6,306.00 945.00 7,251.00
23 Keramik Lantai 40 x 40 cm MF.23 Buah 12,847 0.00% AAL.F.23 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.23 5.00 - 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 13,147.00 1,972.00 15,119.00
24 Keramik Lantai 50 x 50 cm MF.24 Buah 22,937 0.00% AAL.F.24 8,888.00 Buah - - - - - - 355.00 Buah - - - - - - AAD.F.24 5.00 - 0.0018 0.0015 1.0000 - 0.0072 - 501.15 - - 104.77 - 600.00 600.00 23,537.00 3,530.00 27,067.00
25 Keramik Lantai 60 x 60 cm MF.25 Buah 65,555 0.00% AAL.F.25 5,000.00 Buah - - - - - - 200.00 Buah - - - - - - AAD.F.25 5.00 - 0.0035 0.0024 1.0000 - 0.0141 - 985.73 - - 206.07 - 1,190.00 1,190.00 66,745.00 10,011.00 76,756.00
26 Keramik Dinding 10 x 20 cm MF.26 Buah 1,250 0.00% AAL.F.26 294,117.00 Buah - - - - - - 11,764.00 Buah - - - - - - AAD.F.26 5.00 - 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 1,330.00 199.00 1,529.00
27 Keramik Dinding 20x20 atau 20x25 cm MF.27 Buah 2,753 0.00% AAL.F.27 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.27 5.00 - 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 2,853.00 427.00 3,280.00
28 Ubin Dinding Porselin 11 x 11 MF.28 Buah 670 0.00% AAL.F.28 410,000.00 Buah - - - - - - 16,400.00 Buah - - - - - - AAD.F.28 5.00 - 0.0003 0.0003 1.0000 - 0.0010 - 70.59 - - 14.76 - 80.00 80.00 750.00 112.00 862.00
29 Ubin Dinding Porselin 10 x 20 cm MF.29 Buah 853 0.00% AAL.F.29 410,000.00 Buah - - - - - - 16,400.00 Buah - - - - - - AAD.F.29 5.00 - 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 933.00 139.00 1,072.00
30 Ubin Dinding Porselin 20 x 20 MF.30 Buah 2,650 0.00% AAL.F.30 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.30 5.00 - 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 2,750.00 412.00 3,162.00
31 Plint Ubin Abu-Abu 15 x 20 cm MF.31 Buah 12,500 0.00% AAL.F.31 103,125.00 Buah - - - - - - 4,125.00 Buah - - - - - - AAD.F.31 5.00 - 0.0004 0.0004 1.0000 - 0.0016 - 111.57 - - 23.32 - 130.00 130.00 12,630.00 1,894.00 14,524.00
32 Plint Ubin Abu-Abu 10 x 30 cm MF.32 Buah 10,000 0.00% AAL.F.32 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.32 5.00 - 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 10,130.00 1,519.00 11,649.00
33 Plint Ubin Abu-Abu 10 x 40 cm MF.33 Buah 11,500 0.00% AAL.F.33 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.33 5.00 - 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 11,630.00 1,744.00 13,374.00
34 Plint Ubin Warna 10 x 20 cm MF.34 Buah 5,000 0.00% AAL.F.34 175,000.00 Buah - - - - - - 7,000.00 Buah - - - - - - AAD.F.34 5.00 - 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 5,080.00 762.00 5,842.00
35 Plint Ubin Warna 10 x 30 cm MF.35 Buah 7,500 0.00% AAL.F.35 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.35 5.00 - 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 7,630.00 1,144.00 8,774.00
36 Plint Ubin Warna 10 x 40 cm MF.36 Buah 7,500 0.00% AAL.F.36 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.36 5.00 - 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 7,630.00 1,144.00 8,774.00
37 Plint Ubin Teraso 10 x 30 cm MF.37 Buah 7,500 0.00% AAL.F.37 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.37
U m M %
U G m M %
U G m M %
U K m M %
U K m M %
U M m m M %
U M m m M %
U M m m M %
K m A m M %
K m A m M %
K m A m M %
K m A m M %
M m U m M %
W m M M % M M
M %
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23
53 Batu Tempel Hitam MF.53 Buah 15,000 0.00% AAL.F.53 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.53 5.00 - 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 15,170.00 2,275.00 17,445.00
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23
G. BAHAN KACA
1 Kaca Polos 3 mm MG.1 M2 150,000 0.00% AAL.G.1 6,462.00 M2 - - - - - - 258.00 M2 - - - - - - AAD.G.1 5.00 - 0.0039 0.0074 1.0000 - 0.0310 - 1,080.20 - - 451.65 - 1,530.00 1,530.00 151,530.00 22,729.00 174,259.00
2 Kaca Polos 5 mm MG.2 M2 173,000 0.00% AAL.G.2 3,877.00 M2 - - - - - - 155.00 M2 - - - - - - AAD.G.2 5.00 - 0.0054 0.0083 1.0000 - 0.0436 - 1,519.17 - - 635.19 - 2,150.00 2,150.00 175,150.00 26,272.00 201,422.00
3 Kaca Buram 3 mm MG.3 M2 100,000 0.00% AAL.G.3 6,462.00 M2 - - - - - - 258.00 M2 - - - - - - AAD.G.3 5.00 - 0.0039 0.0074 1.0000 - 0.0310 - 1,080.20 - - 451.65 - 1,530.00 1,530.00 101,530.00 15,229.00 116,759.00
4 Kaca Buram 4 mm MG.4 M2 150,000 0.00% AAL.G.4 4,846.00 M2 - - - - - - 193.00 M2 - - - - - - AAD.G.4 5.00 - 0.0047 0.0078 1.0000 - 0.0373 - 1,299.52 - - 543.35 - 1,840.00 1,840.00 151,840.00 22,776.00 174,616.00
5 Kaca Buram 5 mm MG.5 M2 190,000 0.00% AAL.G.5 3,877.00 M2 - - - - - - 155.00 M2 - - - - - - AAD.G.5 5.00 - 0.0054 0.0083 1.0000 - 0.0436 - 1,519.17 - - 635.19 - 2,150.00 2,150.00 192,150.00 28,822.00 220,972.00
6 Kaca Naco / Louver - 7 Clips (polos) MG.6 Buah 137,200 0.00% AAL.G.6 2,934.00 Buah - - - - - - 117.00 Buah - - - - - - AAD.G.6 5.00 - 0.0059 0.0090 1.0000 - 0.0475 - 1,655.94 - - 692.37 - 2,340.00 2,340.00 139,540.00 20,931.00 160,471.00
7 Kaca Naco / Louver - 8 Clips (polos) MG.7 Buah 157,000 0.00% AAL.G.7 2,567.00 Buah - - - - - - 102.00 Buah - - - - - - AAD.G.7 5.00 - 0.0067 0.0094 1.0000 - 0.0535 - 1,866.10 - - 780.24 - 2,640.00 2,640.00 159,640.00 23,946.00 183,586.00
8 Kaca Naco / Louver - 9 Clips (polos) MG.8 Buah 173,333 0.00% AAL.G.8 2,282.00 Buah - - - - - - 91.00 Buah - - - - - - AAD.G.8 5.00 - 0.0074 0.0099 1.0000 - 0.0596 - 2,076.57 - - 868.24 - 2,940.00 2,940.00 176,273.00 26,440.00 202,713.00
9 Kaca Naco / Louver - 10 Clips (polos) MG.9 Buah 196,500 0.00% AAL.G.9 2,054.00 Buah - - - - - - 82.00 Buah - - - - - - AAD.G.9 5.00 - 0.0082 0.0103 1.0000 - 0.0658 - 2,292.49 - - 958.52 - 3,250.00 3,250.00 199,750.00 29,962.00 229,712.00
10 Kaca Rayban 25 % - tebal 5 mm MG.10 M2 150,000 0.00% AAL.G.10 3,877.00 M2 - - - - - - 155.00 M2 - - - - - - AAD.G.10 5.00 - 0.0054 0.0083 1.0000 - 0.0436 - 1,519.17 - - 635.19 - 2,150.00 2,150.00 152,150.00 22,822.00 174,972.00
11 Kaca Acrylic (Kaca Plastik) - 5 mm MG.11 Lembar 1,000,000 0.00% AAL.G.11 4,761.00 Lembar - - - - - - 190.00 Lembar - - - - - - AAD.G.11 5.00 - 0.0053 0.0079 1.0000 - 0.0424 - 1,478.58 - - 618.22 - 2,090.00 2,090.00 1,002,090.00 150,313.00 1,152,403.00
H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang) MH.1 Set 73,642 0.00% AAL.H.1 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.1 5.00 - 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 73,902.00 11,085.00 84,987.00
2 Kunci Tanam - 2 Slaagh MH.2 Set 122,500 0.00% AAL.H.2 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.2 5.00 - 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 122,760.00 18,414.00 141,174.00
3 Kunci Tanam - 1 Slaagh MH.3 Set 50,000 0.00% AAL.H.3 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.3 5.00 - 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 50,260.00 7,539.00 57,799.00
4 Kunci Tanam (Setara Cap Anchor / Yale) MH.4 Set 83,000 0.00% AAL.H.4 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.4 5.00 - 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 83,260.00 12,489.00 95,749.00
5 Kunci Gembok 1" MH.5 Set 85,000 0.00% AAL.H.5 100,000.00 Set - - - - - - 4,000.00 Set - - - - - - AAD.H.5 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 85,130.00 12,769.00 97,899.00
6 Engsel 4" Kuningan (Untuk Pintu) MH.6 Pasang 24,200 0.00% AAL.H.6 100,000.00 Pasang - - - - - - 4,000.00 Pasang - - - - - - AAD.H.6 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 24,330.00 3,649.00 27,979.00
7 Engsel 3" Kuningan (Untuk Jendela) MH.7 Pasang 18,700 0.00% AAL.H.7 100,000.00 Pasang - - - - - - 4,000.00 Pasang - - - - - - AAD.H.7 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 18,830.00 2,824.00 21,654.00
8 Engsel Kupu-Kupu T MH.8 Pasang 13,500 0.00% AAL.H.8 250,000.00 Pasang - - - - - - 10,000.00 Pasang - - - - - - AAD.H.8 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 13,630.00 2,044.00 15,674.00
9 Engsel Nylon Kuningan 4" MH.9 Pasang 11,625 0.00% AAL.H.9 250,000.00 Pasang - - - - - - 10,000.00 Pasang - - - - - - AAD.H.9 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 11,755.00 1,763.00 13,518.00
10 Engsel Biasa 3" (Untuk Jendela) MH.10 Pasang 8,333 0.00% AAL.H.10 250,000.00 Pasang - - - - - - 10,000.00 Pasang - - - - - - AAD.H.10 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 8,463.00 1,269.00 9,732.00
11 Hak Angin / Kait Angin MH.11 Buah 7,000 0.00% AAL.H.11 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.H.11 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 7,130.00 1,069.00 8,199.00
12 Espagnolet MH.12 Set 65,000 0.00% AAL.H.12 200,000.00 Set - - - - - - 8,000.00 Set - - - - - - AAD.H.12 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 65,130.00 9,769.00 74,899.00
13 Grendel Tanam (Pintu) MH.13 Buah 66,875 0.00% AAL.H.13 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.H.13 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 67,005.00 10,050.00 77,055.00
14 Grendel Besar / Kecil MH.14 Buah 14,666 0.00% AAL.H.14 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.H.14 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 14,796.00 2,219.00 17,015.00
15 Tarikan Pintu MH.15 Buah 3,333 0.00% AAL.H.15 250,000.00 Buah - - - - - - 10,000.00 Buah - - - - - - AAD.H.15 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 3,463.00 519.00 3,982.00
16 Tarikan Jendela MH.16 Buah 2,833 0.00% AAL.H.16 250,000.00 Buah - - - - - - 10,000.00 Buah - - - - - - AAD.H.16 5.00 - 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 2,963.00 444.00 3,407.00
I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) MI.1 Lembar 4,142 0.00% AAL.I.1 1,250,000.00 Lembar - - - - - - 50,000.00 Lembar - - - - - - AAD.I.1 5.00 - 0.0019 0.0032 1.0000 - 0.0077 - 535.51 - - 111.95 - 13.00 13.00 4,155.00 623.00 4,778.00
2 Amplas Besi MI.2 Lembar 4,214 0.00% AAL.I.2 1,250,000.00 Lembar - - - - - - 50,000.00 Lembar - - - - - - AAD.I.2 5.00 - 0.0019 0.0032 1.0000 - 0.0077 - 535.51 - - 111.95 - 13.00 13.00 4,227.00 634.00 4,861.00
3 Dempul Kayu MI.3 Kg 30,285 0.00% AAL.I.3 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.3 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 30,535.00 4,580.00 35,115.00
4 Cat Meny Kayu MI.4 Kg 29,714 0.00% AAL.I.4 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.4 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 29,964.00 4,494.00 34,458.00
5 Cat Meny Besi MI.5 Kg 29,671 0.00% AAL.I.5 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.5 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 29,921.00 4,488.00 34,409.00
6 Cat Kayu MI.6 Kg 58,785 0.00% AAL.I.6 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.6 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 59,035.00 8,855.00 67,890.00
7 Cat Besi MI.7 Kg 58,500 0.00% AAL.I.7 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.7 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 58,750.00 8,812.00 67,562.00
8 Cat Kilat LN MI.8 Kg 55,000 0.00% AAL.I.8 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.8 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 55,250.00 8,287.00 63,537.00
9 Minyak Cat / Thinner (Setara Lauguer) MI.9 Kg 28,000 0.00% AAL.I.9 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.9 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 28,250.00 4,237.00 32,487.00
10 Minyak Cat / Thinner (Biasa) Afduner MI.10 Kg 21,220 0.00% AAL.I.10 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.10 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 21,470.00 3,220.00 24,690.00
11 Palmur Tembok MI.11 Zak 186,750 0.00% AAL.I.11 2,500.00 Zak - - - - - - 100.00 Zak - - - - - - AAD.I.11 5.00 - 0.0219 0.0203 1.0000 - 0.0438 - 6,103.23 - - 637.96 - 6,740.00 6,740.00 193,490.00 29,023.00 222,513.00
12 Cat Tembok (1 Klg @ 5 Kg) MI.12 Kaleng 54,125 0.00% AAL.I.12 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.12 5.00 - 0.0041 0.0089 1.0000 - 0.0165 - 1,149.04 - - 240.22 - 1,380.00 1,380.00 55,505.00 8,325.00 63,830.00
13 Cat Besi Crom MI.13 Kg 44,928 0.00% AAL.I.13 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.13 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 45,178.00 6,776.00 51,954.00
14 Cat Besi (Setara Nippon Paint) MI.14 Kg 61,500 0.00% AAL.I.14 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.14 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 61,750.00 9,262.00 71,012.00
15 Politur Kaleng (Setara Apache) MI.15 Kg 61,900 0.00% AAL.I.15 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.15 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 62,150.00 9,322.00 71,472.00
16 Floor Hardener MI.16 KG 60,000 0.00% AAL.I.16 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.I.16 5.00 - 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 60,250.00 9,037.00 69,287.00
V D M MK %
V D M MK %
V O M MK %
V O M MK %
V K M MK %
V K M MK %
D K m MK %
m MK %
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23
24 Closed Jongkok Porselin (Standar) MK.24 Buah 188,333 0.00% AAL.K.24 6,666.00 Buah - - - - - - 266.00 Buah - - - - - - AAD.K.24 5.00 - 0.0084 0.0065 1.0000 - 0.0336 - 2,345.39 - - 490.32 - 2,830.00 2,830.00 191,163.00 28,674.00 219,837.00
25 Closed Jongkok Fiber Glass / Plastik MK.25 Buah 84,083 0.00% AAL.K.25 14,285.00 Buah - - - - - - 571.00 Buah - - - - - - AAD.K.25 5.00 - 0.0041 0.0029 1.0000 - 0.0166 - 1,155.99 - - 241.67 - 1,390.00 1,390.00 85,473.00 12,820.00 98,293.00
26 Urinoir MK.26 Buah 1,147,500 0.00% AAL.K.26 8,333.00 Buah - - - - - - 333.00 Buah - - - - - - AAD.K.26 5.00 - 0.0067 0.0062 1.0000 - 0.0269 - 1,875.93 - - 392.18 - 2,260.00 2,260.00 1,149,760.00 172,464.00 1,322,224.00
27 Wastafel Porselin MK.27 Buah 465,000 0.00% AAL.K.27 8,333.00 Buah - - - - - - 333.00 Buah - - - - - - AAD.K.27 5.00 - 0.0067 0.0062 1.0000 - 0.0269 - 1,875.93 - - 392.18 - 2,260.00 2,260.00 467,260.00 70,089.00 537,349.00
28 Bak Air / Fiber Glass 1 M3 MK.28 Buah 495,000 0.00% AAL.K.28 6,666.00 Buah - - - - - - 266.00 Buah - - - - - - AAD.K.28 5.00 - 0.0084 0.0065 1.0000 - 0.0336 - 2,345.39 - - 490.32 - 2,830.00 2,830.00 497,830.00 74,674.00 572,504.00
29 Bak Air / Fiber Glass 1/2 M3 MK.29 Buah 250,000 0.00% AAL.K.29 8,333.00 Buah - - - - - - 333.00 Buah - - - - - - AAD.K.29 5.00 - 0.0067 0.0052 1.0000 - 0.0269 - 1,875.93 - - 392.18 - 2,260.00 2,260.00 252,260.00 37,839.00 290,099.00
30 Bak Air / Fiber Glass 1/4 M3 MK.30 Buah 277,500 0.00% AAL.K.30 10,000.00 Buah - - - - - - 400.00 Buah - - - - - - AAD.K.30 5.00 - 0.0056 0.0043 1.0000 - 0.0224 - 1,563.60 - - 326.88 - 1,890.00 1,890.00 279,390.00 41,908.00 321,298.00
31 Tangki Air / Fiber Glass 1 M3 MK.31 Buah 1,842,500 0.00% AAL.K.31 3,333.00 Buah - - - - - - 133.00 Buah - - - - - - AAD.K.31 5.00 - 0.0168 0.0130 1.0000 - 0.0673 - 4,690.79 - - 980.64 - 5,670.00 5,670.00 1,848,170.00 277,225.00 2,125,395.00
32 Kran Air 3/4" MK.32 Buah 24,250 0.00% AAL.K.32 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.32 5.00 - 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 24,380.00 3,657.00 28,037.00
33 Kran Air 1/2" MK.33 Buah 19,916 0.00% AAL.K.33 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.33 5.00 - 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 20,046.00 3,006.00 23,052.00
34 Kran Air 1" MK.34 Buah 22,000 0.00% AAL.K.34 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.34 5.00 - 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 22,130.00 3,319.00 25,449.00
35 Stop Kran 1/2" MK.35 Buah 17,875 0.00% AAL.K.35 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.35 5.00 - 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 18,005.00 2,700.00 20,705.00
36 Doble Neple GIP 1/2" MK.36 Buah 47,500 0.00% AAL.K.36 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.36 5.00 - 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 47,630.00 7,144.00 54,774.00
37 Soccet 1/2" MK.37 Buah 20,000 0.00% AAL.K.37 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.37 5.00 - 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 20,130.00 3,019.00 23,149.00
38 Elbow GIP 90º x 1/2" ( PE ) MK.38 Buah 17,500 0.00% AAL.K.38 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.38 5.00 - 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 17,630.00 2,644.00 20,274.00
39 Tee 1/2" x 1/2" MK.39 Buah 17,500 0.00% AAL.K.39 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.39 5.00 - 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 17,630.00 2,644.00 20,274.00
40 Hand Kran 1/2" Besi MK.40 Buah 100,000 0.00% AAL.K.40 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.40 5.00 - 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 100,130.00 15,019.00 115,149.00
41 Dop GIP 1/2" MK.41 Buah 17,500 0.00% AAL.K.41 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.41 5.00 - 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 17,630.00 2,644.00 20,274.00
42 Water Meter 1/2" MK.42 Buah 450,000 0.00% AAL.K.42 20,000.00 Buah - - - - - - 800.00 Buah - - - - - - AAD.K.42 5.00 - 0.0028 0.0040 1.0000 - 0.0112 - 781.66 - - 163.41 - 940.00 940.00 450,940.00 67,641.00 518,581.00
43 Clamp Sadle 2" mm x 1/2" ( PE ) MK.43 Buah 80,000 0.00% AAL.K.43 20,000.00 Buah - - - - - - 800.00 Buah - - - - - - AAD.K.43 5.00 - 0.0028 0.0040 1.0000 - 0.0112 - 781.66 - - 163.41 - 940.00 940.00 80,940.00 12,141.00 93,081.00
44 Pengaman Box Meter MK.44 Buah 250,000 0.00% AAL.K.44 20,000.00 Buah - - - - - - 800.00 Buah - - - - - - AAD.K.44 5.00 - 0.0028 0.0040 1.0000 - 0.0112 - 781.66 - - 163.41 - 940.00 940.00 250,940.00 37,641.00 288,581.00
45 Pipa HDPE Ø 150 mm MK.45 M 398,000 0.00% AAL.K.45 10,660.00 M - - - - - - 426.00 M - - - - - - AAD.K.45 5.00 - 0.0049 0.0048 1.0000 - 0.0196 - 1,363.37 - - 285.02 - 1,640.00 1,640.00 399,640.00 59,946.00 459,586.00
46 Pipa HDPE Ø 100 mm MK.46 M 196,000 0.00% AAL.K.46 22,421.00 M - - - - - - 896.00 M - - - - - - AAD.K.46 5.00 - 0.0019 0.0024 1.0000 - 0.0076 - 526.28 - - 110.02 - 630.00 630.00 196,630.00 29,494.00 226,124.00
47 Pipa HDPE Ø 75 mm MK.47 M 107,000 0.00% AAL.K.47 48,076.00 M - - - - - - 1,923.00 M - - - - - - AAD.K.47 5.00 - 0.0009 0.0011 1.0000 - 0.0035 - 244.59 - - 51.13 - 290.00 290.00 107,290.00 16,093.00 123,383.00
48 Pipa HDPE Ø 50 mm MK.48 M 60,000 0.00% AAL.K.48 106,382.00 M - - - - - - 4,255.00 M - - - - - - AAD.K.48 5.00 - 0.0004 0.0005 1.0000 - 0.0014 - 98.40 - - 20.57 - 110.00 110.00 60,110.00 9,016.00 69,126.00
49 Tee All Flange Ø 50 x 50 mm MK.49 Buah 450,000 0.00% AAL.K.49 4,761.00 Buah - - - - - - 190.00 Buah - - - - - - AAD.K.49 5.00 - 0.0130 0.0160 1.0000 - 0.0519 - 3,615.17 - - 755.78 - 4,370.00 4,370.00 454,370.00 68,155.00 522,525.00
50 Tee All Flange Ø 75 x 50 mm MK.50 Buah 475,000 0.00% AAL.K.50 4,291.00 Buah - - - - - - 171.00 Buah - - - - - - AAD.K.50 5.00 - 0.0132 0.0162 1.0000 - 0.0528 - 3,678.98 - - 769.12 - 4,440.00 4,440.00 479,440.00 71,916.00 551,356.00
51 Tee All Flange Ø 75 x 75 mm MK.51 Buah 500,000 0.00% AAL.K.51 3,937.00 Buah - - - - - - 157.00 Buah - - - - - - AAD.K.51 5.00 - 0.0134 0.0163 1.0000 - 0.0536 - 3,736.12 - - 781.06 - 4,510.00 4,510.00 504,510.00 75,676.00 580,186.00
52 Tee All Flange Ø 100 x 75 mm MK.52 Buah 650,000 0.00% AAL.K.52 3,617.00 Buah - - - - - - 144.00 Buah - - - - - - AAD.K.52 5.00 - 0.0136 0.0165 1.0000 - 0.0545 - 3,801.06 - - 794.64 - 4,590.00 4,590.00 654,590.00 98,188.00 752,778.00
53 Bend 90 All Flange Ø 50 mm MK.53 Buah 210,000 0.00% AAL.K.53 12,500.00 Buah - - - - - - 500.00 Buah - - - - - - AAD.K.53 5.00 - 0.0036 0.0054 1.0000 - 0.0142 - 991.80 - - 207.34 - 1,190.00 1,190.00 211,190.00 31,678.00 242,868.00
54 Bend 90 All Flange Ø 75 mm MK.54 Buah 335,000 0.00% AAL.K.54 4,901.00 Buah - - - - - - 196.00 Buah - - - - - - AAD.K.54 5.00 - 0.0117 0.0143 1.0000 - 0.0468 - 3,260.45 - - 681.62 - 3,940.00 3,940.00 338,940.00 50,841.00 389,781.00
55 Bend 90 All Flange Ø 100 mm MK.55 Buah 50,000 0.00% AAL.K.55 4,166.00 Buah - - - - - - 166.00 Buah - - - - - - AAD.K.55 5.00 - 0.0121 0.0146 1.0000 - 0.0482 - 3,361.04 - - 702.65 - 4,060.00 4,060.00 54,060.00 8,109.00 62,169.00
56 Gate Valve Flange Ø 50 mm MK.56 Buah 1,850,000 0.00% AAL.K.56 2,649.00 Buah - - - - - - 105.00 Buah - - - - - - AAD.K.56 5.00 - 0.0303 0.0293 1.0000 - 0.1214 - 8,460.35 - - 1,768.70 - 10,220.00 10,220.00 1,860,220.00 279,033.00 2,139,253.00
57 Gate Valve Flange Ø 75 mm MK.57 Buah 2,350,000 0.00% AAL.K.57 1,851.00 Buah - - - - - - 74.00 Buah - - - - - - AAD.K.57 5.00 - 0.0320 0.0304 1.0000 - 0.1279 - 8,917.48 - - 1,864.26 - 10,780.00 10,780.00 2,360,780.00 354,117.00 2,714,897.00
58 Gate Valve Flange Ø 1/2" MK.58 Buah 200,000 0.00% AAL.K.58 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.K.58 5.00 - 0.0004 0.0007 1.0000 - 0.0017 - 117.56 - - 24.58 - 140.00 140.00 200,140.00 30,021.00 230,161.00
59 Stub Flange Ø 50 mm MK.59 Buah 200,000 0.00% AAL.K.59 16,666.00 Buah - - - - - - 666.00 Buah - - - - - - AAD.K.59 5.00 - 0.0025 0.0043 1.0000 - 0.0101 - 705.42 - - 147.47 - 850.00 850.00 200,850.00 30,127.00 230,977.00
60 Stub Flange Ø 75 mm MK.60 Buah 600,000 0.00% AAL.K.60 9,596.00 Buah - - - - - - 383.00 Buah - - - - - - AAD.K.60 5.00 - 0.0049 0.0072 1.0000 - 0.0196 - 1,367.08 - - 285.80 - 1,650.00 1,650.00 601,650.00 90,247.00 691,897.00
61 Stub Flange Ø 100 mm MK.61 Buah 840,000 0.00% AAL.K.61 7,936.00 Buah - - - - - - 317.00 Buah - - - - - - AAD.K.61 5.00 - 0.0061 0.0086 1.0000 - 0.0243 - 1,697.01 - - 354.77 - 2,050.00 2,050.00 842,050.00 126,307.00 968,357.00
62 End Cap (Dop) Ø 50 mm MK.62 Buah 37,009 0.00% AAL.K.62 66,666.00 Buah - - - - - - 2,666.00 Buah - - - - - - AAD.K.62 5.00 - 0.0006 0.0011 1.0000 - 0.0025 - 176.34 - - 36.86 - 210.00 210.00 37,219.00 5,582.00 42,801.00
63 End Cap (Dop) Ø 75 mm MK.63 Buah 86,873 0.00% AAL.K.63 16,666.00 Buah - - - - - - 666.00 Buah - - - - - - AAD.K.63 5.00 - 0.0025 0.0043 1.0000 - 0.0101 - 705.42 - - 147.47 - 850.00 850.00 87,723.00 13,158.00 100,881.00
64 Stop Cock (PIT Kran) 1/2" MK.64 Buah 950,000 0.00% AAL.K.64 50,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.K.64 5.00 - 0.0009 0.0016 1.0000 - 0.0037 - 257.57 - - 53.85 - 310.00 310.00 950,310.00 142,546.00 1,092,856.00
65 Reducer All Flange Ø 75 x 75 mm MK.65 Buah 525,000 0.00% AAL.K.65 5,555.00 Buah - - - - - - 222.00 Buah - - - - - - AAD.K.65 5.00 - 0.0090 0.0122 1.0000 - 0.0362 - 2,520.78 - - 526.99 - 3,040.00 3,040.00 528,040.00 79,206.00 607,246.00
66 Reducer All Flange Ø 75 x 50 mm MK.66 Buah 500,000 0.00% AAL.K.66 5,952.00 Buah - - - - - - 238.00 Buah - - - - - - AAD.K.66 5.00 - 0.0089 0.0121 1.0000 - 0.0357 - 2,487.76 - - 520.08 - 3,000.00 3,000.00 503,000.00 75,450.00 578,450.00
67 Quil Elbow HDPE (adaptor) Ø 15 mm (1/2") MK.67 Buah 48,000 0.00% AAL.K.67 12,500.00 Buah - - - - - - 500.00 Buah - - - - - - AAD.K.67 5.00 - 0.0036 0.0054 1.0000 - 0.0142 - 991.80 - - 207.34 - 1,190.00 1,190.00 49,190.00 7,378.00 56,568.00
68 Pipa Input HDPE Ø 1/2" MK.68 Buah 38,400 0.00% AAL.K.68 12,500.00 Buah - - - - - - 500.00 Buah - - - - - - AAD.K.68 5.00 - 0.0036 0.0054 1.0000 - 0.0142 - 991.80 - - 207.34 - 1,190.00 1,190.00 39,590.00 5,938.00 45,528.00
M. BETON PRACETAK
1 Dwiker Sumur/Gorong2 Ø 1 m, H 60 cm MM.1 Buah 425,000 0.00% AAL.M.1 110.00 Buah - - - - - - 4.00 Buah - - - - - - AAD.M.1 5.00 - 0.1095 0.1268 1.0000 - 0.3286 - 30,539.52 - - 4,788.37 - 35,320.00 35,320.00 460,320.00 69,048.00 529,368.00
2 Dwiker Sumur/Gorong2 Ø 0,8 m, H 60 cm MM.2 Buah 375,000 0.00% AAL.M.2 138.00 Buah - - - - - - 5.00 Buah - - - - - - AAD.M.2 5.00 - 0.0911 0.1130 1.0000 - 0.2733 - 25,399.20 - - 3,982.41 - 29,380.00 29,380.00 404,380.00 60,657.00 465,037.00
3 Dwiker Sumur/Gorong2 Ø 0,6 m, H 80 cm MM.3 Buah 375,000 0.00% AAL.M.3 138.00 Buah - - - - - - 5.00 Buah - - - - - - AAD.M.3 5.00 - 0.0959 0.1130 1.0000 - 0.2878 - 26,746.13 - - 4,193.60 - 30,930.00 30,930.00 405,930.00 60,889.00 466,819.00
4 Dwiker Sumur/Gorong2 Ø 0,4 m, H 80 cm MM.4 Buah 325,000 0.00% AAL.M.4 276.00 Buah - - - - - - 11.00 Buah - - - - - - AAD.M.4 5.00 - 0.0721 0.0855 1.0000 - 0.2164 - 20,107.70 - - 3,152.74 - 23,260.00 23,260.00 348,260.00 52,239.00 400,499.00
KEGIATAN :
HARGA SATUAN DINAS PEKERJAAN UMUM
KABUPATEN MERAUKE
ANALISA
ONGKOS ANGKUT BAHAN
LOKASI :
TAHUN ANGGARAN :
2016
PERIODE
JANUARI - JUNI 2016
Harga Satuan Bahan, Upah dan Alat
1 Mandor Bangunan / Lapangan L-1 160,000.00 184,000.00 26,286.00 HPS PU. 2016
2 Kepala Tukang (Batu, Pasir, Kayu, dsb) L-2 146,000.00 168,000.00 24,000.00 HPS PU. 2016
3 Tukang (Batu, Pasir, Kayu, dsb) L-3 131,000.00 151,000.00 21,572.00 HPS PU. 2016
4 Pekerja L-4 102,000.00 118,000.00 16,858.00 HPS PU. 2016
5 Mandor Alat Berat (F. Equipment) L-5 216,000.00 249,000.00 35,572.00 HPS PU. 2016
6 Operator Alat Berat L-6 146,000.00 168,000.00 24,000.00 HPS PU. 2016
7 Pembantu Operator L-7 102,000.00 118,000.00 16,858.00 HPS PU. 2016
8 Sopir / Driver L-8 131,000.00 151,000.00 21,572.00 HPS PU. 2016
9 Pembantu Sopir / Driver L-9 102,000.00 118,000.00 16,858.00 HPS PU. 2016
10 Mekanik L - 10 131,000.00 151,000.00 21,572.00 HPS PU. 2016
11 Pembantu Mekanik L - 11 102,000.00 118,000.00 16,858.00 HPS PU. 2016
12 Surveyor L - 12 146,000.00 168,000.00 24,000.00 HPS PU. 2016
13 Pembantu Surveyor L - 13 102,000.00 118,000.00 16,858.00 HPS PU. 2016
1 DUMP TRUCK 3-4 M3 E-1 391,000,000.00 Jam 313,074.00 HPS PU. 2016
2 EXCAVATOR 80-140 HP E-2 1,751,530,000.00 Jam 683,846.00 HPS PU. 2016
3 BULLDOZER 100-150 HP E-3 3,315,180,000.00 Jam 1,095,944.00 HPS PU. 2016
4 MOTOR GRADER >100 HP E-4 2,381,500,000.00 Jam 836,894.00 HPS PU. 2016
5 VIBRATOR ROLLER 5-8 T. E-5 1,240,000,000.00 Jam 503,193.00 HPS PU. 2016
6 PNEUMATIC T. ROLLER 8-15 T. E-6 1,423,300,000.00 Jam 594,439.00 HPS PU. 2016
7 TANDEM ROLER 6-8 T E-7 1,315,000,000.00 Jam 494,030.00 HPS PU. 2016
8 CONCRETE MIXER 0.3-0.6 M3 E-8 75,515,000.00 Jam 75,312.00 HPS PU. 2016
9 WATER PUMP 70-100 mm E-9 7,500,000.00 Jam 56,107.00 HPS PU. 2016
10 WATER TANKER 3000-4500 L. E - 10 350,000,000.00 Jam 311,134.00 HPS PU. 2016
11 CHAIN SAW (MESIN POTONG KAYU) E - 11 5,500,000.00 Jam 59,312.00 HPS PU. 2016
12 COMPRESSOR 4000-6500 L\M E - 12 50,000,000.00 Jam 184,245.00 HPS PU. 2016
13 ASPHALT SPRAYER E - 13 45,000,000.00 Jam 78,686.00 HPS PU. 2016
14 FARM TRACTOR (ROTARI) M 5000 E - 14 295,000,000.00 Jam 210,985.00 HPS PU. 2016
15 STAMPER E - 15 32,500,000.00 Jam 59,119.00 HPS PU. 2016
16 WHELL LOADER E - 16 1,696,580,000.00 Jam 709,107.00 HPS PU. 2016
17 ASPHALT FINIZHER E - 17 1,977,960,000.00 Jam 873,487.00 HPS PU. 2016
18 GENERATOR ZET E - 18 35,000,000.00 Jam 132,028.00 HPS PU. 2016
19 ASPHAL MIXING PLANT (AMP) E - 19 3,220,525,000.00 Jam 7,206,916.00 HPS PU. 2016
20 MINI EXCAVATOR - COBELCO E - 20 554,400,000.00 Jam 373,941.00 HPS PU. 2016
Catatan :
- Harga satuan belum termasuk pajak PPN dan PPH
- Harga satuan sudah termasuk Over Head + Profit
- Harga - harga hanya sebagai pedoman / pendukung, dalam perhitungan konstruksi ( tidak mengikat ).
- Undang -undang no. 13 tahun 2003 tentang Ketenagakerjaan (Bab X Pasal 77)
Jika dalam 1 hari bekerja selama 8 jam (5 hari kerja/ senin s/d jumat) maka dalam 1 bulan bekerja selama 21 hari
Jika dalam 1 hari bekerja selama 7 jam (6 hari kerja/ senin s/d sabtu) maka dalam 1 bulan bekerja selama 25 hari
Harga Satuan Bahan, Upah dan Alat
F. BAHAN KERAMIK
1 Ubin Abu-Abu 20 x 20 Cm MF.1 Buah 2,606.00 0.00% Merauke 5.00 - 100.00 2,706.00 405.00 3,111.00 -
2 Ubin Abu-Abu 30 x 30 Cm MF.2 Buah 6,590.00 0.00% Merauke 5.00 - 170.00 6,760.00 1,014.00 7,774.00 -
3 Ubin Abu-Abu 40 x 40 Cm MF.3 Buah 14,208.00 0.00% Merauke 5.00 - 300.00 14,508.00 2,176.00 16,684.00 -
4 Ubin Warna 20 x 20 Cm MF.4 Buah 2,650.00 0.00% Merauke 5.00 - 100.00 2,750.00 412.00 3,162.00 -
5 Ubin Warna 30 x 30 Cm MF.5 Buah 5,848.00 0.00% Merauke 5.00 - 170.00 6,018.00 902.00 6,920.00 -
6 Ubin Warna 40 x 40 Cm MF.6 Buah 13,958.00 0.00% Merauke 5.00 - 300.00 14,258.00 2,138.00 16,396.00 -
7 Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah 6,045.00 0.00% Merauke 5.00 - 170.00 6,215.00 932.00 7,147.00 -
8 Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah 14,958.00 0.00% Merauke 5.00 - 300.00 15,258.00 2,288.00 17,546.00 -
9 Ubin Granito Ukuran 30 x 30 cm MF.9 Buah 5,909.00 0.00% Merauke 5.00 - 170.00 6,079.00 911.00 6,990.00 -
10 Ubin Granito Ukuran 40 x 40 cm MF.10 Buah 22,500.00 0.00% Merauke 5.00 - 300.00 22,800.00 3,420.00 26,220.00 -
11 Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah 6,704.00 0.00% Merauke 5.00 - 170.00 6,874.00 1,031.00 7,905.00 -
12 Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah 13,958.00 0.00% Merauke 5.00 - 300.00 14,258.00 2,138.00 16,396.00 -
13 Ubin Teralux Marmer Ukuran 30 x 30 cm MF.13 Buah 8,750.00 0.00% Merauke 5.00 - 170.00 8,920.00 1,338.00 10,258.00 -
14 Ubin Teralux Marmer Ukuran 40 x 40 cm MF.14 Buah 21,458.00 0.00% Merauke 5.00 - 300.00 21,758.00 3,263.00 25,021.00 -
15 Ubin Teralux Marmer Ukuran 60 x 60 cm MF.15 Buah 63,500.00 0.00% Merauke 5.00 - 1,190.00 64,690.00 9,703.00 74,393.00 -
16 Keramik Artistik 10x20; 15x15 cm MF.16 Buah 1,175.00 0.00% Merauke 5.00 - 80.00 1,255.00 188.00 1,443.00 -
17 Keramik Artistik 10x10 atau 5x20 cm MF.17 Buah 650.00 0.00% Merauke 5.00 - 80.00 730.00 109.00 839.00 -
18 Keramik Lantai 20 x 20 cm MF.18 Buah 2,686.00 0.00% Merauke 5.00 - 100.00 2,786.00 417.00 3,203.00 -
19 Keramik Lantai 20 x 30 cm MF.19 Buah 3,750.00 0.00% Merauke 5.00 - 130.00 3,880.00 582.00 4,462.00 -
20 Keramik Lantai 30 x 30 cm MF.20 Buah 5,962.00 0.00% Merauke 5.00 - 170.00 6,132.00 919.00 7,051.00 -
21 Keramik Lantai 30 x 30 berglasir MF.21 Buah 5,909.00 0.00% Merauke 5.00 - 170.00 6,079.00 911.00 6,990.00 -
22 Keramik Lantai 30 x 30 berglasir (Mozaik) MF.22 Buah 6,136.00 0.00% Merauke 5.00 - 170.00 6,306.00 945.00 7,251.00 -
23 Keramik Lantai 40 x 40 cm MF.23 Buah 12,847.00 0.00% Merauke 5.00 - 300.00 13,147.00 1,972.00 15,119.00 -
24 Keramik Lantai 50 x 50 cm MF.24 Buah 22,937.00 0.00% Merauke 5.00 - 600.00 23,537.00 3,530.00 27,067.00 -
25 Keramik Lantai 60 x 60 cm MF.25 Buah 65,555.00 0.00% Merauke 5.00 - 1,190.00 66,745.00 10,011.00 76,756.00 -
26 Keramik Dinding 10 x 20 cm MF.26 Buah 1,250.00 0.00% Merauke 5.00 - 80.00 1,330.00 199.00 1,529.00 -
27 Keramik Dinding 20x20 atau 20x25 cm MF.27 Buah 2,753.00 0.00% Merauke 5.00 - 100.00 2,853.00 427.00 3,280.00 -
28 Ubin Dinding Porselin 11 x 11 MF.28 Buah 670.00 0.00% Merauke 5.00 - 80.00 750.00 112.00 862.00 -
29 Ubin Dinding Porselin 10 x 20 cm MF.29 Buah 853.00 0.00% Merauke 5.00 - 80.00 933.00 139.00 1,072.00 -
30 Ubin Dinding Porselin 20 x 20 MF.30 Buah 2,650.00 0.00% Merauke 5.00 - 100.00 2,750.00 412.00 3,162.00 -
31 Plint Ubin Abu-Abu 15 x 20 cm MF.31 Buah 12,500.00 0.00% Merauke 5.00 - 130.00 12,630.00 1,894.00 14,524.00 -
32 Plint Ubin Abu-Abu 10 x 30 cm MF.32 Buah 10,000.00 0.00% Merauke 5.00 - 130.00 10,130.00 1,519.00 11,649.00 -
33 Plint Ubin Abu-Abu 10 x 40 cm MF.33 Buah 11,500.00 0.00% Merauke 5.00 - 130.00 11,630.00 1,744.00 13,374.00 -
34 Plint Ubin Warna 10 x 20 cm MF.34 Buah 5,000.00 0.00% Merauke 5.00 - 80.00 5,080.00 762.00 5,842.00 -
35 Plint Ubin Warna 10 x 30 cm MF.35 Buah 7,500.00 0.00% Merauke 5.00 - 130.00 7,630.00 1,144.00 8,774.00 -
36 Plint Ubin Warna 10 x 40 cm MF.36 Buah 7,500.00 0.00% Merauke 5.00 - 130.00 7,630.00 1,144.00 8,774.00 -
37 Plint Ubin Teraso 10 x 30 cm MF.37 Buah 7,500.00 0.00% Merauke 5.00 - 130.00 7,630.00 1,144.00 8,774.00 -
38 Plint Ubin Teraso 10 x 40 cm MF.38 Buah 12,500.00 0.00% Merauke 5.00 - 130.00 12,630.00 1,894.00 14,524.00 -
39 Plint Ubin Granito 10 x 40 cm MF.39 Buah 12,500.00 0.00% Merauke 5.00 - 130.00 12,630.00 1,894.00 14,524.00 -
40 Plint Ubin Granito 10 x 30 cm MF.40 Buah 7,500.00 0.00% Merauke 5.00 - 130.00 7,630.00 1,144.00 8,774.00 -
41 Plint Ubin Teralux Kerang 10 x 40 cm MF.41 Buah 7,500.00 0.00% Merauke 5.00 - 130.00 7,630.00 1,144.00 8,774.00 -
42 Plint Ubin Teralux Kerang 10 x 30 cm MF.42 Buah 7,500.00 0.00% Merauke 5.00 - 130.00 7,630.00 1,144.00 8,774.00 -
43 Plint Ubin Teralux Marmer 10 x 60 cm MF.43 Buah 15,000.00 0.00% Merauke 5.00 - 140.00 15,140.00 2,271.00 17,411.00 -
44 Plint Ubin Teralux Marmer 10 x 40 cm MF.44 Buah 10,000.00 0.00% Merauke 5.00 - 130.00 10,130.00 1,519.00 11,649.00 -
45 Plint Ubin Teralux Marmer 10 x 30 cm MF.45 Buah 7,500.00 0.00% Merauke 5.00 - 130.00 7,630.00 1,144.00 8,774.00 -
Harga Satuan Bahan, Upah dan Alat
G. BAHAN KACA
1 Kaca Polos 3 mm MG.1 M2 150,000.00 0.00% Merauke 5.00 - 1,530.00 151,530.00 22,729.00 174,259.00 -
2 Kaca Polos 5 mm MG.2 M2 173,000.00 0.00% Merauke 5.00 - 2,150.00 175,150.00 26,272.00 201,422.00 -
3 Kaca Buram 3 mm MG.3 M2 100,000.00 0.00% Merauke 5.00 - 1,530.00 101,530.00 15,229.00 116,759.00 -
4 Kaca Buram 4 mm MG.4 M2 150,000.00 0.00% Merauke 5.00 - 1,840.00 151,840.00 22,776.00 174,616.00 -
5 Kaca Buram 5 mm MG.5 M2 190,000.00 0.00% Merauke 5.00 - 2,150.00 192,150.00 28,822.00 220,972.00 -
6 Kaca Naco / Louver - 7 Clips (polos) MG.6 Buah 137,200.00 0.00% Merauke 5.00 - 2,340.00 139,540.00 20,931.00 160,471.00 -
7 Kaca Naco / Louver - 8 Clips (polos) MG.7 Buah 157,000.00 0.00% Merauke 5.00 - 2,640.00 159,640.00 23,946.00 183,586.00 -
8 Kaca Naco / Louver - 9 Clips (polos) MG.8 Buah 173,333.00 0.00% Merauke 5.00 - 2,940.00 176,273.00 26,440.00 202,713.00 -
9 Kaca Naco / Louver - 10 Clips (polos) MG.9 Buah 196,500.00 0.00% Merauke 5.00 - 3,250.00 199,750.00 29,962.00 229,712.00 -
10 Kaca Rayban 25 % - tebal 5 mm MG.10 M2 150,000.00 0.00% Merauke 5.00 - 2,150.00 152,150.00 22,822.00 174,972.00 -
11 Kaca Acrylic (Kaca Plastik) - 5 mm MG.11 Lembar 1,000,000.00 0.00% Merauke 5.00 - 2,090.00 1,002,090.00 150,313.00 1,152,403.00 -
H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang) MH.1 Set 73,642.00 0.00% Merauke 5.00 - 260.00 73,902.00 11,085.00 84,987.00 -
2 Kunci Tanam - 2 Slaagh MH.2 Set 122,500.00 0.00% Merauke 5.00 - 260.00 122,760.00 18,414.00 141,174.00 -
3 Kunci Tanam - 1 Slaagh MH.3 Set 50,000.00 0.00% Merauke 5.00 - 260.00 50,260.00 7,539.00 57,799.00 -
4 Kunci Tanam (Setara Cap Anchor / Yale) MH.4 Set 83,000.00 0.00% Merauke 5.00 - 260.00 83,260.00 12,489.00 95,749.00 -
5 Kunci Gembok 1" MH.5 Set 85,000.00 0.00% Merauke 5.00 - 130.00 85,130.00 12,769.00 97,899.00 -
6 Engsel 4" Kuningan (Untuk Pintu) MH.6 Pasang 24,200.00 0.00% Merauke 5.00 - 130.00 24,330.00 3,649.00 27,979.00 -
7 Engsel 3" Kuningan (Untuk Jendela) MH.7 Pasang 18,700.00 0.00% Merauke 5.00 - 130.00 18,830.00 2,824.00 21,654.00 -
8 Engsel Kupu-Kupu T MH.8 Pasang 13,500.00 0.00% Merauke 5.00 - 130.00 13,630.00 2,044.00 15,674.00 -
9 Engsel Nylon Kuningan 4" MH.9 Pasang 11,625.00 0.00% Merauke 5.00 - 130.00 11,755.00 1,763.00 13,518.00 -
10 Engsel Biasa 3" (Untuk Jendela) MH.10 Pasang 8,333.00 0.00% Merauke 5.00 - 130.00 8,463.00 1,269.00 9,732.00 -
11 Hak Angin / Kait Angin MH.11 Buah 7,000.00 0.00% Merauke 5.00 - 130.00 7,130.00 1,069.00 8,199.00 -
12 Espagnolet MH.12 Set 65,000.00 0.00% Merauke 5.00 - 130.00 65,130.00 9,769.00 74,899.00 -
13 Grendel Tanam (Pintu) MH.13 Buah 66,875.00 0.00% Merauke 5.00 - 130.00 67,005.00 10,050.00 77,055.00 -
14 Grendel Besar / Kecil MH.14 Buah 14,666.00 0.00% Merauke 5.00 - 130.00 14,796.00 2,219.00 17,015.00 -
15 Tarikan Pintu MH.15 Buah 3,333.00 0.00% Merauke 5.00 - 130.00 3,463.00 519.00 3,982.00 -
16 Tarikan Jendela MH.16 Buah 2,833.00 0.00% Merauke 5.00 - 130.00 2,963.00 444.00 3,407.00 -
I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) MI.1 Lembar 4,142.00 0.00% Merauke 5.00 - 13.00 4,155.00 623.00 4,778.00 -
2 Amplas Besi MI.2 Lembar 4,214.00 0.00% Merauke 5.00 - 13.00 4,227.00 634.00 4,861.00 -
3 Dempul Kayu MI.3 Kg 30,285.00 0.00% Merauke 5.00 - 250.00 30,535.00 4,580.00 35,115.00 -
4 Cat Meny Kayu MI.4 Kg 29,714.00 0.00% Merauke 5.00 - 250.00 29,964.00 4,494.00 34,458.00 -
5 Cat Meny Besi MI.5 Kg 29,671.00 0.00% Merauke 5.00 - 250.00 29,921.00 4,488.00 34,409.00 -
6 Cat Kayu MI.6 Kg 58,785.00 0.00% Merauke 5.00 - 250.00 59,035.00 8,855.00 67,890.00 -
7 Cat Besi MI.7 Kg 58,500.00 0.00% Merauke 5.00 - 250.00 58,750.00 8,812.00 67,562.00 -
8 Cat Kilat LN MI.8 Kg 55,000.00 0.00% Merauke 5.00 - 250.00 55,250.00 8,287.00 63,537.00 -
9 Minyak Cat / Thinner (Setara Lauguer) MI.9 Kg 28,000.00 0.00% Merauke 5.00 - 250.00 28,250.00 4,237.00 32,487.00 -
10 Minyak Cat / Thinner (Biasa) Afduner MI.10 Kg 21,220.00 0.00% Merauke 5.00 - 250.00 21,470.00 3,220.00 24,690.00 -
11 Palmur Tembok MI.11 Zak 186,750.00 0.00% Merauke 5.00 - 6,740.00 193,490.00 29,023.00 222,513.00 11,126.00
12 Cat Tembok (1 Klg @ 5 Kg) MI.12 Kaleng 54,125.00 0.00% Merauke 5.00 - 1,380.00 55,505.00 8,325.00 63,830.00 12,766.00
13 Cat Besi Crom MI.13 Kg 44,928.00 0.00% Merauke 5.00 - 250.00 45,178.00 6,776.00 51,954.00 -
14 Cat Besi (Setara Nippon Paint) MI.14 Kg 61,500.00 0.00% Merauke 5.00 - 250.00 61,750.00 9,262.00 71,012.00 -
15 Politur Kaleng (Setara Apache) MI.15 Kg 61,900.00 0.00% Merauke 5.00 - 250.00 62,150.00 9,322.00 71,472.00 -
16 Floor Hardener MI.16 KG 60,000.00 0.00% Merauke 5.00 - 250.00 60,250.00 9,037.00 69,287.00 -
M. BETON PRACETAK
1 Dwiker Sumur/Gorong2 Ø 1 m, H 60 cm MM.1 Buah 425,000.00 0.00% Merauke 5.00 - 35,320.00 460,320.00 69,048.00 529,368.00 -
2 Dwiker Sumur/Gorong2 Ø 0,8 m, H 60 cm MM.2 Buah 375,000.00 0.00% Merauke 5.00 - 29,380.00 404,380.00 60,657.00 465,037.00 -
3 Dwiker Sumur/Gorong2 Ø 0,6 m, H 80 cm MM.3 Buah 375,000.00 0.00% Merauke 5.00 - 30,930.00 405,930.00 60,889.00 466,819.00 -
4 Dwiker Sumur/Gorong2 Ø 0,4 m, H 80 cm MM.4 Buah 325,000.00 0.00% Merauke 5.00 - 23,260.00 348,260.00 52,239.00 400,499.00 -
Mengetahui / menyetujui :
Kepala Dinas Pekerjaan Umum
Kabupaten Merauke
P. PEKERJAAN ASPAL
14 1 M2 Cat tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) PU.N.14
HPS.PU. 2016
Plamur MI.11 KG 0.100 11,126.00 1,112.60
Cat dasar MI.12 KG 0.100 12,766.00 1,276.60
Cat penutup 2 kali MI.12 KG 0.260 12,766.00 3,319.16
Mandor cat L-1 OH 0.0025 184,000.00 460.00
Kepala tukang cat L-2 OH 0.006 168,000.00 1,058.40
Tukang cat L-3 OH 0.063 151,000.00 9,513.00
Pekerja cat L-4 OH 0.020 118,000.00 2,360.00
Jumlah harga pekerjaan 5,708.36 13,391.40 19,099.76
Jumlah harga dibulatkan 19,099.00
15 1 M2 Cat tembok lama (1 lapis cat dasar, 2 lapis cat penutup) PU.N.15
HPS.PU. 2016
Cat dasar MI.12 KG 0.120 12,766.00 1,531.92
Cat penutup 2 kali MI.12 KG 0.180 12,766.00 2,297.88
Mandor cat L-1 OH 0.0025 184,000.00 460.00
Kepala tukang cat L-2 OH 0.004 168,000.00 705.60
Tukang cat L-3 OH 0.042 151,000.00 6,342.00
Pekerja cat L-4 OH 0.028 118,000.00 3,304.00
Jumlah harga pekerjaan 3,829.80 10,811.60 14,641.40
Jumlah harga dibulatkan 14,641.00
34 1 Unit Septictank 2x(75 x 75) cm, Dalam 1,5 m dan peresapan PU.M.34
HPS.PU. 2016
Galian Tanah Biasa Sedalam 1 - 2 M PU.B.3 M3 1.6880 114,480.00 193,242.24
Batu bata MB.8 Buah 366.3000 1,541.00 564,468.30
Semen Portland (PC) @ 50 Kg MB.11 Zak 2.4070 124,246.00 299,060.12
Pasir semen (import) MB.1 M3 0.4570 1,415,372.00 646,825.00
Besi beton dia 10 mm MD.3 KG 5.0820 12,664.00 64,358.45
Kawat ikat beton MD.9 KG 0.1240 21,634.00 2,682.62
Papan begisting kayu bus MC.5 M2 0.2500 82,741.92 20,685.48
Patok kayu bus MC.4 M3 0.0250 2,700,706.00 67,517.65
Besi Pipa Dia 2" PVC MK.13 M 2.0000 17,699.25 35,398.50
Paku Campur MD.16 KG 0.1000 16,824.00 1,682.40
Pipa peresapan PVC dia 4" MK.10 M 2.0000 87,296.50 174,593.00
Mandor pasir/batu L-1 OH 0.2500 184,000.00 46,000.00
Kepala tukang pasir/batu L-2 OH 0.3400 168,000.00 57,120.00
Tukang pasir/batu L-3 OH 3.4000 151,000.00 513,400.00
Pekerja pasir/batu L-4 OH 2.4000 118,000.00 283,200.00
Jumlah harga pekerjaan 2,070,513.76 899,720.00 2,970,233.76
Jumlah harga dibulatkan 2,970,233.00
14 1 Unit Jendela Ungkit (75 x 115 cm), bingkai 3x8 cm, kaca polos 5 mm PU.L.14
HPS.PU. 2016
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.030 4,290,653.00 128,719.59
Kaca polos tebal 5 mm MG.2 M2 0.620 201,422.00 124,881.64
Tarikan jendela aluminium MH.16 Buah 2.000 3,407.00 6,814.00
Kait angin 6" MH.11 Buah 2.000 8,199.00 16,398.00
Grendel jendela MH.14 Buah 2.000 17,015.00 34,030.00
Paku Campur MD.16 KG 0.065 16,824.00 1,093.56
Mandor kayu L-1 OH 0.150 184,000.00 27,600.00
Kepala tukang kayu L-2 OH 0.150 168,000.00 25,200.00
Tukang kayu L-3 OH 1.500 151,000.00 226,500.00
Pekerja kayu L-4 OH 0.300 118,000.00 35,400.00
Jumlah harga pekerjaan 311,936.79 314,700.00 626,636.79
Jumlah harga dibulatkan 626,636.00
15 1 Unit Untuk Jendela gantung hanya 1 bh kait angin dan 1 grendel PU.L.15 1 626,636.00 626,636.00
HPS.PU. 2016 Jumlah harga pekerjaan - 626,636.00 626,636.00
Jumlah harga dibulatkan 626,636.00
18 1 Unit Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.18
HPS.PU. 2016
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.064 4,290,653.00 274,601.79
Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 1.800 72,774.00 130,993.20
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 27,979.00 41,968.50
Kait angin MH.11 Buah 1.000 8,199.00 8,199.00
Kunci tanam 2 slangh MH.2 Buah 1.000 141,174.00 141,174.00
Grendel besar MH.14 Buah 1.000 17,015.00 17,015.00
Paku Campur MD.16 KG 0.200 16,824.00 3,364.80
Mandor kayu L-1 OH 0.0425 184,000.00 7,820.00
Kepala tukang kayu L-2 OH 0.260 168,000.00 43,680.00
Tukang kayu L-3 OH 2.600 151,000.00 392,600.00
Pekerja kayu L-4 OH 0.850 118,000.00 100,300.00
Jumlah harga pekerjaan 617,316.29 544,400.00 1,161,716.29
Jumlah harga dibulatkan 1,161,716.00
19 1 Unit Pintu double tripleks 80x210 cm, bingkai kayu 3,5x9 cm lapis se PU.L.19
HPS.PU. 2016
Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.18 Buah 1.000 1,161,716.29 1,161,716.29
Seng Plat BJLS 0.30 ME.6 Lembar 1.200 46,678.00 56,013.60
Paku Campur MD.16 KG 0.100 16,824.00 1,682.40
Jumlah harga pekerjaan 1,219,412.29 - 1,219,412.29
Jumlah harga dibulatkan 1,219,412.00
20 1 Unit Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.20
HPS.PU. 2016
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.057 4,290,653.00 244,567.22
Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 1.800 72,774.00 130,993.20
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 27,979.00 41,968.50
Kait angin 8" MH.11 Buah 1.000 8,199.00 8,199.00
Kunci tanam 2 slangh MH.2 Buah 1.000 141,174.00 141,174.00
Grendel besar MH.14 Buah 1.000 17,015.00 17,015.00
Paku Campur MD.16 KG 0.200 16,824.00 3,364.80
Analisa Harga Satuan Pekerjaan (AHSP) l. Kunci, Penggantung dan Kaca
21 1 Unit Pintu double tripleks 70x210 cm, bingkai kayu 3,5x9 cm lapis se PU.L.21
HPS.PU. 2016
Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.20 Buah 1.000 1,131,681.72 1,131,681.72
Seng Plat BJLS 0.30 ME.6 Lembar 1.200 46,678.00 56,013.60
Paku Campur MD.16 KG 0.100 16,824.00 1,682.40
Jumlah harga pekerjaan 1,189,377.72 - 1,189,377.72
Jumlah harga dibulatkan 1,189,377.00
22 1 Unit Pintu double tekwood 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.22
HPS.PU. 2016
Pintu tanpa triplek PU.L.18 Buah 1.000 1,161,716.29 1,161,716.29
Teakwood MC.20 Lembar 1.800 121,359.00 218,446.20
Jumlah harga pekerjaan 1,380,162.49 - 1,380,162.49
Jumlah harga dibulatkan 1,380,162.00
5 1 M2 Pintu Besi Plat Baja Tbl 2 mm Rangkap, Rangka Baja Siku PU.J.5
SNI 7393-2008
Besi Siku 30 . 30 . 3 - L = 6 Meter MD.37 KG 15.0000 10,496.00 157,440.00
Besi Plat baja t = 3 mm MD.46 KG 32.8000 15,103.00 495,378.40
Kawat las MD.28 DOS/KG 0.0500 178,514.00 8,925.70
Pekerja L-4 OH 1.0500 118,000.00 123,900.00
Tukang las L-3 OH 1.0500 151,000.00 158,550.00
Kepala tukang L-2 OH 0.1050 168,000.00 17,640.00
Mandor L-1 OH 0.0520 184,000.00 9,568.00
Jumlah harga pekerjaan 661,744.10 309,658.00 971,402.10
Jumlah harga dibulatkan 971,402.00
H. PEKERJAAN ATAP
G. PEKERJAAN KAYU
PERIODE : JANUARI - JUNI 2016 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
53 1 M2 Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas III PU.G.53
SNI 3434:2008
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 0.0280 3,309,677.00 92,670.96
Paku Campuran MD.16 KG 0.1500 16,824.00 2,523.60
Pekerja Kayu L-4 OH 0.1500 118,000.00 17,700.00
Tukang Kayu L-3 OH 0.4500 151,000.00 67,950.00
Kepala Tukang L-2 OH 0.0450 168,000.00 7,560.00
Mandor L-1 OH 0.0080 184,000.00 1,472.00
Jumlah harga pekerjaan 95,194.56 94,682.00 189,876.56
Jumlah harga dibulatkan 189,876.00
64 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas I PU.G.64
HPS.PU. 2016
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0350 8,242,464.00 288,486.24
Paku 3" MD.13 KG 0.7500 16,775.00 12,581.25
Mandor kayu L-1 OH 0.0100 184,000.00 1,840.00
Kepala tukang kayu L-2 OH 0.2000 168,000.00 33,600.00
Tukang kayu L-3 OH 0.4000 151,000.00 60,400.00
Pekerja kayu L-4 OH 0.2000 118,000.00 23,600.00
Jumlah harga pekerjaan 301,067.49 119,440.00 420,507.49
Jumlah harga dibulatkan 420,507.00
65 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas II PU.G.65
HPS.PU. 2016
Papan Kayu Kelas II (Kayu Rahay) tebal = 3 Cm MC.7 M3 0.0350 4,386,486.00 153,527.01
Paku 3" MD.13 KG 0.7500 16,775.00 12,581.25
Mandor kayu L-1 OH 0.0100 184,000.00 1,840.00
Kepala tukang kayu L-2 OH 0.2000 168,000.00 33,600.00
Tukang kayu L-3 OH 0.4000 151,000.00 60,400.00
Pekerja kayu L-4 OH 0.2000 118,000.00 23,600.00
Jumlah harga pekerjaan 166,108.26 119,440.00 285,548.26
Jumlah harga dibulatkan 285,548.00
66 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas III PU.G.66
HPS.PU. 2016
Papan Kayu Kelas III (Kayu Bus) MC.5 M3 0.0350 3,309,677.00 115,838.70
Paku 3" MD.13 KG 0.7500 16,775.00 12,581.25
Mandor kayu L-1 OH 0.0100 184,000.00 1,840.00
Kepala tukang kayu L-2 OH 0.2000 168,000.00 33,600.00
Tukang kayu L-3 OH 0.4000 151,000.00 60,400.00
Pekerja kayu L-4 OH 0.2000 118,000.00 23,600.00
Jumlah harga pekerjaan 128,419.95 119,440.00 247,859.95
Jumlah harga dibulatkan 247,859.00
74 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Manual PU.G.74
HPS.PU. 2016
Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) MC.31 Batang - 227,424.00 -
Mandor kayu L-1 Jam 0.4333 26,286.00 11,390.60
Tukang kayu L-3 Jam 0.5167 21,572.00 11,145.53
Pekerja kayu L-4 Jam 2.4167 16,858.00 40,740.17
Mesin Pemotong Kayu L - 11 Jam 0.0833 16,858.00 1,404.83
Alat Pancang 1 - 2 Ton (Manual) Unit 0.4333 125,000.00 54,166.67
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 128,847.80 128,847.80
Jumlah harga dibulatkan 128,847.00
75 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Manual PU.G.75
HPS.PU. 2016
Tiang Umpak Jembatan (Dia 20 cm, L=4-6 m) MC.30 Batang - 137,126.00 -
Mandor kayu L-1 Jam 0.3650 26,286.00 9,594.39
Tukang kayu L-3 Jam 0.4483 21,572.00 9,671.45
Pekerja kayu L-4 Jam 2.0750 16,858.00 34,980.35
Mesin Pemotong Kayu L - 11 Jam 0.0833 16,858.00 1,404.83
Alat Pancang 1 - 2 Ton (Manual) Unit 0.3650 125,000.00 45,625.00
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 111,276.02 111,276.02
Jumlah harga dibulatkan 111,276.00
76 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Mekanis PU.G.76
HPS.PU. 2016
Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) MC.31 Batang - 227,424.00 -
Mandor (F. Equipment) L-5 Jam 0.1667 35,572.00 5,928.67
Pekerja L-4 Jam 0.8333 16,858.00 14,048.33
Excavator E-2 Jam 0.1667 683,846.00 113,974.33
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 143,951.33 143,951.33
Jumlah harga dibulatkan 143,951.00
77 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Mekanis PU.G.77
HPS.PU. 2016
Tiang Umpak Jembatan (Dia 20 cm, L=4-6 m) MC.30 Batang - 137,126.00 -
Mandor (F. Equipment) L-5 Jam 0.1667 35,572.00 5,928.67
Pekerja L-4 Jam 0.5000 16,858.00 8,429.00
Excavator E-2 Jam 0.1667 683,846.00 113,974.33
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 138,332.00 138,332.00
Jumlah harga dibulatkan 138,332.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu
F. PEKERJAAN PLESTERAN
47 1 M2 Acian PU.F.47
SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 3.2500 2,485.00 8,076.25
Pekerja pasir/batu L-4 OH 0.2000 118,000.00 23,600.00
Tukang pasir/batu L-3 OH 0.1000 151,000.00 15,100.00
Kepala tukang pasir/batu L-2 OH 0.0100 168,000.00 1,680.00
Mandor pasir/batu L-1 OH 0.0100 184,000.00 1,840.00
Jumlah harga pekerjaan 8,076.25 42,220.00 50,296.25
Jumlah harga dibulatkan 50,296.00
1 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 2PS - Pasir Lokal PU.E.1
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,541.00 215,740.00
Semen Portland (PC) @ 50 Kg MB.11 KG 43.5000 2,485.00 108,097.50
Pasir semen (lokal) MB.2 M3 0.0800 889,191.00 71,135.28
Pekerja pasir/batu L-4 OH 0.6000 118,000.00 70,800.00
Tukang pasir/batu L-3 OH 0.2000 151,000.00 30,200.00
Kepala tukang pasir/batu L-2 OH 0.0200 168,000.00 3,360.00
Mandor pasir/batu L-1 OH 0.0300 184,000.00 5,520.00
Jumlah harga pekerjaan 394,972.78 109,880.00 504,852.78
Jumlah harga dibulatkan 504,852.00
2 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 3PS - Pasir Lokal PU.E.2
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,541.00 215,740.00
Semen Portland (PC) @ 50 Kg MB.11 KG 32.9500 2,485.00 81,880.75
Pasir semen (lokal) MB.2 M3 0.0910 889,191.00 80,916.38
Pekerja pasir/batu L-4 OH 0.6000 118,000.00 70,800.00
Tukang pasir/batu L-3 OH 0.2000 151,000.00 30,200.00
Kepala tukang pasir/batu L-2 OH 0.0200 168,000.00 3,360.00
Mandor pasir/batu L-1 OH 0.0300 184,000.00 5,520.00
Jumlah harga pekerjaan 378,537.13 109,880.00 488,417.13
Jumlah harga dibulatkan 488,417.00
3 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 4PS - Pasir Lokal PU.E.3
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,541.00 215,740.00
Semen Portland (PC) @ 50 Kg MB.11 KG 26.5500 2,485.00 65,976.75
Pasir semen (lokal) MB.2 M3 0.0930 889,191.00 82,694.76
Pekerja pasir/batu L-4 OH 0.6000 118,000.00 70,800.00
Tukang pasir/batu L-3 OH 0.2000 151,000.00 30,200.00
Kepala tukang pasir/batu L-2 OH 0.0200 168,000.00 3,360.00
Mandor pasir/batu L-1 OH 0.0300 184,000.00 5,520.00
Jumlah harga pekerjaan 364,411.51 109,880.00 474,291.51
Jumlah harga dibulatkan 474,291.00
4 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 5PS - Pasir Lokal PU.E.4
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,541.00 215,740.00
Semen Portland (PC) @ 50 Kg MB.11 KG 22.2000 2,485.00 55,167.00
Pasir semen (lokal) MB.2 M3 0.1020 889,191.00 90,697.48
Pekerja pasir/batu L-4 OH 0.6000 118,000.00 70,800.00
Tukang pasir/batu L-3 OH 0.2000 151,000.00 30,200.00
Kepala tukang pasir/batu L-2 OH 0.0200 168,000.00 3,360.00
Mandor pasir/batu L-1 OH 0.0300 184,000.00 5,520.00
Jumlah harga pekerjaan 361,604.48 109,880.00 471,484.48
Jumlah harga dibulatkan 471,484.00
5 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 6PS - Pasir Lokal PU.E.5
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,541.00 215,740.00
Semen Portland (PC) @ 50 Kg MB.11 KG 18.5000 2,485.00 45,972.50
Pasir semen (lokal) MB.2 M3 0.1220 889,191.00 108,481.30
Pekerja pasir/batu L-4 OH 0.6000 118,000.00 70,800.00
Tukang pasir/batu L-3 OH 0.2000 151,000.00 30,200.00
Kepala tukang pasir/batu L-2 OH 0.0200 168,000.00 3,360.00
Mandor pasir/batu L-1 OH 0.0300 184,000.00 5,520.00
Jumlah harga pekerjaan 370,193.80 109,880.00 480,073.80
Jumlah harga dibulatkan 480,073.00
6 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Lokal PU.E.6
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,541.00 107,870.00
Semen Portland (PC) @ 50 Kg MB.11 KG 18.9500 2,485.00 47,090.75
Pasir semen (lokal) MB.2 M3 0.0380 889,191.00 33,789.26
Pekerja pasir/batu L-4 OH 0.3000 118,000.00 35,400.00
Tukang pasir/batu L-3 OH 0.1000 151,000.00 15,100.00
Kepala tukang pasir/batu L-2 OH 0.0100 168,000.00 1,680.00
Mandor pasir/batu L-1 OH 0.0150 184,000.00 2,760.00
Jumlah harga pekerjaan 188,750.01 54,940.00 243,690.01
Jumlah harga dibulatkan 243,690.00
7 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lokal PU.E.7
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,541.00 107,870.00
Semen Portland (PC) @ 50 Kg MB.11 KG 14.3700 2,485.00 35,709.45
Pasir semen (lokal) MB.2 M3 0.0400 889,191.00 35,567.64
Pekerja pasir/batu L-4 OH 0.3000 118,000.00 35,400.00
Tukang pasir/batu L-3 OH 0.1000 151,000.00 15,100.00
Kepala tukang pasir/batu L-2 OH 0.0100 168,000.00 1,680.00
Mandor pasir/batu L-1 OH 0.0150 184,000.00 2,760.00
Jumlah harga pekerjaan 179,147.09 54,940.00 234,087.09
Jumlah harga dibulatkan 234,087.00
8 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Lokal PU.E.8
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,541.00 107,870.00
Semen Portland (PC) @ 50 Kg MB.11 KG 11.5000 2,485.00 28,577.50
Pasir semen (lokal) MB.2 M3 0.0430 889,191.00 38,235.21
Pekerja pasir/batu L-4 OH 0.3000 118,000.00 35,400.00
Tukang pasir/batu L-3 OH 0.1000 151,000.00 15,100.00
Kepala tukang pasir/batu L-2 OH 0.0100 168,000.00 1,680.00
Mandor pasir/batu L-1 OH 0.0150 184,000.00 2,760.00
Jumlah harga pekerjaan 174,682.71 54,940.00 229,622.71
Jumlah harga dibulatkan 229,622.00
9 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 5PS - Pasir Lokal PU.E.9
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,541.00 107,870.00
Semen Portland (PC) @ 50 Kg MB.11 KG 9.6800 2,485.00 24,054.80
Pasir semen (lokal) MB.2 M3 0.0450 889,191.00 40,013.60
Pekerja pasir/batu L-4 OH 0.3000 118,000.00 35,400.00
Tukang pasir/batu L-3 OH 0.1000 151,000.00 15,100.00
Kepala tukang pasir/batu L-2 OH 0.0100 168,000.00 1,680.00
Mandor pasir/batu L-1 OH 0.0150 184,000.00 2,760.00
Jumlah harga pekerjaan 171,938.40 54,940.00 226,878.40
Jumlah harga dibulatkan 226,878.00
Analisa Harga Satuan Pekerjaan (AHSP) E. Pekerjaan Dinding
PERIODE : JANUARI - JUNI 2016 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
10 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 6PS - Pasir Lokal PU.E.10
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,541.00 107,870.00
Semen Portland (PC) @ 50 Kg MB.11 KG 8.3200 2,485.00 20,675.20
Pasir semen (lokal) MB.2 M3 0.0490 889,191.00 43,570.36
Pekerja pasir/batu L-4 OH 0.3000 118,000.00 35,400.00
Tukang pasir/batu L-3 OH 0.1000 151,000.00 15,100.00
Kepala tukang pasir/batu L-2 OH 0.0100 168,000.00 1,680.00
Mandor pasir/batu L-1 OH 0.0150 184,000.00 2,760.00
Jumlah harga pekerjaan 172,115.56 54,940.00 227,055.56
Jumlah harga dibulatkan 227,055.00
11 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 8PS - Pasir Lokal PU.E.11
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,541.00 107,870.00
Semen Portland (PC) @ 50 Kg MB.11 KG 6.5000 2,485.00 16,152.50
Pasir semen (lokal) MB.2 M3 0.0500 889,191.00 44,459.55
Pekerja pasir/batu L-4 OH 0.3000 118,000.00 35,400.00
Tukang pasir/batu L-3 OH 0.1000 151,000.00 15,100.00
Kepala tukang pasir/batu L-2 OH 0.0100 168,000.00 1,680.00
Mandor pasir/batu L-1 OH 0.0150 184,000.00 2,760.00
Jumlah harga pekerjaan 168,482.05 54,940.00 223,422.05
Jumlah harga dibulatkan 223,422.00
13 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Import PU.E.13
HPS.PU. 2016
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,541.00 107,870.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.4579 124,246.00 56,889.14
Pasir semen (import) MB.1 M3 0.0491 1,415,372.00 69,435.37
Pekerja pasir/batu L-4 OH 0.0143 118,000.00 1,685.71
Tukang pasir/batu L-3 OH 0.0429 151,000.00 6,471.43
Kepala tukang pasir/batu L-2 OH 0.1286 168,000.00 21,600.00
Mandor pasir/batu L-1 OH 0.2857 184,000.00 52,571.43
Jumlah harga pekerjaan 234,194.51 82,328.57 316,523.08
Jumlah harga dibulatkan 316,523.00
14 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Import PU.E.14
HPS.PU. 2016
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,541.00 107,870.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.3663 124,246.00 45,511.31
Pasir semen (import) MB.1 M3 0.0523 1,415,372.00 74,064.39
Pekerja pasir/batu L-4 OH 0.0143 118,000.00 1,685.71
Tukang pasir/batu L-3 OH 0.0429 151,000.00 6,471.43
Kepala tukang pasir/batu L-2 OH 0.1286 168,000.00 21,600.00
Mandor pasir/batu L-1 OH 0.2857 184,000.00 52,571.43
Jumlah harga pekerjaan 227,445.70 82,328.57 309,774.28
Jumlah harga dibulatkan 309,774.00
15 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Lokal PU.E.15
HPS.PU. 2016
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,541.00 107,870.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.6105 124,246.00 75,852.18
Pasir semen (lokal) MB.2 M3 0.0436 889,191.00 38,775.08
Pekerja pasir/batu L-4 OH 0.0143 118,000.00 1,685.71
Tukang pasir/batu L-3 OH 0.0429 151,000.00 6,471.43
Kepala tukang pasir/batu L-2 OH 0.1286 168,000.00 21,600.00
Mandor pasir/batu L-1 OH 0.2857 184,000.00 52,571.43
Jumlah harga pekerjaan 222,497.26 82,328.57 304,825.83
Jumlah harga dibulatkan 304,825.00
16 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lokal PU.E.16
HPS.PU. 2016
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,541.00 107,870.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.4579 124,246.00 56,889.14
Pasir semen (lokal) MB.2 M3 0.0491 889,191.00 43,621.96
Pekerja pasir/batu L-4 OH 0.0143 118,000.00 1,685.71
Tukang pasir/batu L-3 OH 0.0429 151,000.00 6,471.43
Kepala tukang pasir/batu L-2 OH 0.1286 168,000.00 21,600.00
Mandor pasir/batu L-1 OH 0.2857 184,000.00 52,571.43
Jumlah harga pekerjaan 208,381.10 82,328.57 290,709.67
Jumlah harga dibulatkan 290,709.00
17 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Lokal PU.E.17
HPS.PU. 2016
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,541.00 107,870.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.3663 124,246.00 45,511.31
Pasir semen (lokal) MB.2 M3 0.0523 889,191.00 46,530.09
Pekerja pasir/batu L-4 OH 0.0143 118,000.00 1,685.71
Tukang pasir/batu L-3 OH 0.0429 151,000.00 6,471.43
Kepala tukang pasir/batu L-2 OH 0.1286 168,000.00 21,600.00
Mandor pasir/batu L-1 OH 0.2857 184,000.00 52,571.43
Jumlah harga pekerjaan 199,911.40 82,328.57 282,239.98
Jumlah harga dibulatkan 282,239.00
18 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 2PS - Pasir Import PU.E.18
HPS.PU. 2016
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,541.00 61,640.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.2516 124,246.00 31,263.40
Pasir semen (import) MB.1 M3 0.0180 1,415,372.00 25,438.78
Pekerja pasir/batu L-4 OH 0.0071 118,000.00 842.86
Tukang pasir/batu L-3 OH 0.0214 151,000.00 3,235.71
Kepala tukang pasir/batu L-2 OH 0.0643 168,000.00 10,800.00
Mandor pasir/batu L-1 OH 0.1429 184,000.00 26,285.71
Jumlah harga pekerjaan 118,342.18 41,164.29 159,506.47
Jumlah harga dibulatkan 159,506.00
Analisa Harga Satuan Pekerjaan (AHSP) E. Pekerjaan Dinding
PERIODE : JANUARI - JUNI 2016 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
19 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 3PS - Pasir Import PU.E.19
HPS.PU. 2016
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,541.00 61,640.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1887 124,246.00 23,447.55
Pasir semen (import) MB.1 M3 0.0202 1,415,372.00 28,618.63
Pekerja pasir/batu L-4 OH 0.0071 118,000.00 842.86
Tukang pasir/batu L-3 OH 0.0214 151,000.00 3,235.71
Kepala tukang pasir/batu L-2 OH 0.0643 168,000.00 10,800.00
Mandor pasir/batu L-1 OH 0.1429 184,000.00 26,285.71
Jumlah harga pekerjaan 113,706.18 41,164.29 154,870.47
Jumlah harga dibulatkan 154,870.00
20 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 4PS - Pasir Import PU.E.20
HPS.PU. 2016
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,541.00 61,640.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1510 124,246.00 18,758.04
Pasir semen (import) MB.1 M3 0.0216 1,415,372.00 30,526.54
Pekerja pasir/batu L-4 OH 0.0143 118,000.00 1,685.71
Tukang pasir/batu L-3 OH 0.0429 151,000.00 6,471.43
Kepala tukang pasir/batu L-2 OH 0.1286 168,000.00 21,600.00
Mandor pasir/batu L-1 OH 0.2857 184,000.00 52,571.43
Jumlah harga pekerjaan 110,924.58 82,328.57 193,253.15
Jumlah harga dibulatkan 193,253.00
21 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 2PS - Pasir Lokal PU.E.21
HPS.PU. 2016
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,541.00 61,640.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.2516 124,246.00 31,263.40
Pasir semen (lokal) MB.2 M3 0.0180 889,191.00 15,981.62
Pekerja pasir/batu L-4 OH 0.0071 118,000.00 842.86
Tukang pasir/batu L-3 OH 0.0214 151,000.00 3,235.71
Kepala tukang pasir/batu L-2 OH 0.0643 168,000.00 10,800.00
Mandor pasir/batu L-1 OH 0.1429 184,000.00 26,285.71
Jumlah harga pekerjaan 108,885.02 41,164.29 150,049.31
Jumlah harga dibulatkan 150,049.00
22 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 3PS - Pasir Lokal PU.E.22
HPS.PU. 2016
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,541.00 61,640.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1887 124,246.00 23,447.55
Pasir semen (lokal) MB.2 M3 0.0202 889,191.00 17,979.32
Pekerja pasir/batu L-4 OH 0.0071 118,000.00 842.86
Tukang pasir/batu L-3 OH 0.0214 151,000.00 3,235.71
Kepala tukang pasir/batu L-2 OH 0.0643 168,000.00 10,800.00
Mandor pasir/batu L-1 OH 0.1429 184,000.00 26,285.71
Jumlah harga pekerjaan 103,066.87 41,164.29 144,231.16
Jumlah harga dibulatkan 144,231.00
23 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 4PS - Pasir Lokal PU.E.23
HPS.PU. 2016
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,541.00 61,640.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1510 124,246.00 18,758.04
Pasir semen (lokal) MB.2 M3 0.0216 889,191.00 19,177.94
Pekerja pasir/batu L-4 OH 0.0143 118,000.00 1,685.71
Tukang pasir/batu L-3 OH 0.0429 151,000.00 6,471.43
Kepala tukang pasir/batu L-2 OH 0.1286 168,000.00 21,600.00
Mandor pasir/batu L-1 OH 0.2857 184,000.00 52,571.43
Jumlah harga pekerjaan 99,575.98 82,328.57 181,904.56
Jumlah harga dibulatkan 181,904.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton
28 1 M3 Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 PU.D.28
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 276.0000 2,485.00 685,860.00
Pasir semen (import) MB.1 M3 0.5914 1,415,372.00 837,091.44
Kerikil/batu pecah (import) MB.6 M3 0.7496 1,435,315.00 1,075,954.65
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 118,000.00 194,700.00
Tukang pasir/batu L-3 OH 0.2750 151,000.00 41,525.00
Kepala tukang pasir/batu L-2 OH 0.0275 168,000.00 4,620.00
Mandor pasir/batu L-1 OH 0.0825 184,000.00 15,180.00
Jumlah harga pekerjaan 2,609,656.09 256,025.00 2,865,681.09
Jumlah harga dibulatkan 2,865,681.00
29 1 M3 Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 PU.D.29
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 299.0000 2,485.00 743,015.00
Pasir semen (import) MB.1 M3 0.5707 1,415,372.00 807,773.02
Kerikil/batu pecah (import) MB.6 M3 0.7533 1,435,315.00 1,081,270.63
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 118,000.00 194,700.00
Tukang pasir/batu L-3 OH 0.2750 151,000.00 41,525.00
Kepala tukang pasir/batu L-2 OH 0.0275 168,000.00 4,620.00
Mandor pasir/batu L-1 OH 0.0825 184,000.00 15,180.00
Jumlah harga pekerjaan 2,642,808.65 256,025.00 2,898,833.65
Jumlah harga dibulatkan 2,898,833.00
30 1 M3 Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87 PU.D.30
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 230.0000 2,485.00 571,550.00
Pasir semen (import) MB.1 M3 0.6379 1,415,372.00 902,805.14
Kerikil/batu pecah (import) MB.6 M3 0.7607 1,435,315.00 1,091,902.60
Air Liter 200.0000 50.00 10,000.00
Pekerja pasir/batu L-4 OH 1.2000 118,000.00 141,600.00
Tukang pasir/batu L-3 OH 0.2000 151,000.00 30,200.00
Kepala tukang pasir/batu L-2 OH 0.0200 168,000.00 3,360.00
Mandor pasir/batu L-1 OH 0.0600 184,000.00 11,040.00
Jumlah harga pekerjaan 2,576,257.74 186,200.00 2,762,457.74
Jumlah harga dibulatkan 2,762,457.00
31 1 M3 Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 PU.D.31
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 326.0000 2,485.00 810,110.00
Pasir semen (import) MB.1 M3 0.5429 1,415,372.00 768,344.80
Kerikil/batu pecah (import) MB.6 M3 0.7622 1,435,315.00 1,094,028.99
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 118,000.00 194,700.00
Tukang pasir/batu L-3 OH 0.2750 151,000.00 41,525.00
Kepala tukang pasir/batu L-2 OH 0.0275 168,000.00 4,620.00
Mandor pasir/batu L-1 OH 0.0825 184,000.00 15,180.00
Jumlah harga pekerjaan 2,683,233.79 256,025.00 2,939,258.79
Jumlah harga dibulatkan 2,939,258.00
32 1 M3 Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 PU.D.32
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 352.0000 2,485.00 874,720.00
Pasir semen (import) MB.1 M3 0.5221 1,415,372.00 739,026.38
Kerikil/batu pecah (import) MB.6 M3 0.7637 1,435,315.00 1,096,155.38
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 118,000.00 194,700.00
Tukang pasir/batu L-3 OH 0.2750 151,000.00 41,525.00
Kepala tukang pasir/batu L-2 OH 0.0275 168,000.00 4,620.00
Mandor pasir/batu L-1 OH 0.0825 184,000.00 15,180.00
Jumlah harga pekerjaan 2,720,651.76 256,025.00 2,976,676.76
Jumlah harga dibulatkan 2,976,676.00
33 1 M3 Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 PU.D.33
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 371.0000 2,485.00 921,935.00
Pasir semen (import) MB.1 M3 0.4986 1,415,372.00 705,664.04
Kerikil/batu pecah (import) MB.6 M3 0.7756 1,435,315.00 1,113,166.52
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 118,000.00 194,700.00
Tukang pasir/batu L-3 OH 0.2750 151,000.00 41,525.00
Kepala tukang pasir/batu L-2 OH 0.0275 168,000.00 4,620.00
Mandor pasir/batu L-1 OH 0.0825 184,000.00 15,180.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton
34 1 M3 Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 PU.D.34
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 384.0000 2,485.00 954,240.00
Pasir semen (import) MB.1 M3 0.4943 1,415,372.00 699,598.16
Kerikil/batu pecah (import) MB.6 M3 0.7696 1,435,315.00 1,104,660.95
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 118,000.00 194,700.00
Tukang pasir/batu L-3 OH 0.2750 151,000.00 41,525.00
Kepala tukang pasir/batu L-2 OH 0.0275 168,000.00 4,620.00
Mandor pasir/batu L-1 OH 0.0825 184,000.00 15,180.00
Jumlah harga pekerjaan 2,769,249.11 256,025.00 3,025,274.11
Jumlah harga dibulatkan 3,025,274.00
35 1 M3 Beton mutu f’'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 PU.D.35
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 406.0000 2,485.00 1,008,910.00
Pasir semen (import) MB.1 M3 0.4886 1,415,372.00 691,510.32
Kerikil/batu pecah (import) MB.6 M3 0.7600 1,435,315.00 1,090,839.40
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 118,000.00 194,700.00
Tukang pasir/batu L-3 OH 0.2750 151,000.00 41,525.00
Kepala tukang pasir/batu L-2 OH 0.0275 168,000.00 4,620.00
Mandor pasir/batu L-1 OH 0.0825 184,000.00 15,180.00
Jumlah harga pekerjaan 2,802,009.72 256,025.00 3,058,034.72
Jumlah harga dibulatkan 3,058,034.00
36 1 M3 Beton mutu f’'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 PU.D.36
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 413.0000 2,485.00 1,026,305.00
Pasir semen (import) MB.1 M3 0.4864 1,415,372.00 688,477.38
Kerikil/batu pecah (import) MB.6 M3 0.7563 1,435,315.00 1,085,523.42
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 118,000.00 194,700.00
Tukang pasir/batu L-3 OH 0.2750 151,000.00 41,525.00
Kepala tukang pasir/batu L-2 OH 0.0275 168,000.00 4,620.00
Mandor pasir/batu L-1 OH 0.0825 184,000.00 15,180.00
Jumlah harga pekerjaan 2,811,055.80 256,025.00 3,067,080.80
Jumlah harga dibulatkan 3,067,080.00
37 1 M3 Beton mutu f’'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 PU.D.37
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 439.0000 2,485.00 1,090,915.00
Pasir semen (import) MB.1 M3 0.4786 1,415,372.00 677,356.60
Kerikil/batu pecah (import) MB.6 M3 0.7452 1,435,315.00 1,069,575.47
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 2.1000 118,000.00 247,800.00
Tukang pasir/batu L-3 OH 0.3500 151,000.00 52,850.00
Kepala tukang pasir/batu L-2 OH 0.0350 168,000.00 5,880.00
Mandor pasir/batu L-1 OH 0.1050 184,000.00 19,320.00
Jumlah harga pekerjaan 2,848,597.07 325,850.00 3,174,447.07
Jumlah harga dibulatkan 3,174,447.00
38 1 M3 Beton mutu f’'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 PU.D.38
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 448.0000 2,485.00 1,113,280.00
Pasir semen (import) MB.1 M3 0.4764 1,415,372.00 674,323.66
Kerikil/batu pecah (import) MB.6 M3 0.7407 1,435,315.00 1,063,196.30
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 2.1000 118,000.00 247,800.00
Tukang pasir/batu L-3 OH 0.3500 151,000.00 52,850.00
Kepala tukang pasir/batu L-2 OH 0.0350 168,000.00 5,880.00
Mandor pasir/batu L-1 OH 0.1050 184,000.00 19,320.00
Jumlah harga pekerjaan 2,861,549.96 325,850.00 3,187,399.96
Jumlah harga dibulatkan 3,187,399.00
ANALISA PU.D.60 s/d PU.D.67 UNTUK GAMBAR RENCANA YANG BELUM MEMPUNYAI GAMBAR DETAIL
74 1 Btg Tiang Pancang Beton 20x20; L=5 M (1PC : 2PS : 3KR) PU.D.74
HPS.PU. 2016
Begisting beton (kolom) PU.D.49 M2 4.0000 496,389.00 1,985,556.00
Tulangan Sengkang (polos) Dia. 8 mm PU.D.40 KG 50.4916 15,767.00 796,101.63
Tulangan Utama (polos) Dia. 10 mm PU.D.41 KG 123.8496 15,695.00 1,943,819.47
Campuran Beton 1PC : 2PS : 3KR (import) PU.D.12 M3 0.2300 3,812,861.00 876,958.03
Jumlah harga pekerjaan per 1 M3 5,602,435.13 - 5,602,435.13
Jumlah harga dibulatkan 5,602,435.00
26 1 M3 Timbunan dan pemadatan Tanah Biasa (Mekanis) - Mini Blade (Cobelco) PU.B.26
HPS.PU. 2016
Tanah Biasa Hasil Galian Setempat MB.4 M3 1.2000 320,148.00 384,177.60
Pekerja L-4 Jam 0.0313 16,858.00 528.26
Mandor (F. Equipment) L-5 Jam 0.0313 35,572.00 1,114.67
Mini Excavator + Blade (Cobelco) E - 20 Jam 0.0266 373,941.00 9,954.06
Vibrator Roller E-5 Jam 0.0313 503,193.00 15,767.90
Water Tank Truck E - 10 Jam 0.0187 311,134.00 5,807.83
Jumlah harga pekerjaan 384,177.60 33,172.73 417,350.33
Jumlah harga dibulatkan 417,350.00
A. PEKERJAAN PERSIAPAN
PERIODE : JANUARI - JUNI 2016 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
A. PEKERJAAN PERSIAPAN
1 1 M' Pagar Sementara Kayu Tinggi 2 M PU.A.1 RSNI T-12-2002 304,039.88 84,440.00 388,479.00
2 1 M' Pagar Sementara (Seng Gelombang 2 M) PU.A.2 RSNI T-12-2002 367,507.73 84,440.00 451,947.00
3 1 M' Pagar Kawat Duri, Tinggi 1,80 M PU.A.3 RSNI T-12-2002 494,456.64 72,640.00 567,096.00
4 1 M2 Membersihkan Lapangan dan Perataan PU.A.4 RSNI T-12-2002 - 12,720.00 12,720.00
5 1 M' Pengukuran dan Pasangan Bouwplank PU.A.5 RSNI T-12-2002 63,220.34 29,500.00 92,720.00
6 1 M' Pengukuran dan Pematokan Saluran Irigasi/Darainase PU.A.6 HPS.PU. 2016 1,108.00
7 1 M' Pengukuran dan Pematokan Jalan PU.A.7 HPS.PU. 2016 509.00
8 1 M2 Kantor Sementara dgn Lantai Plesteran PU.A.8 RSNI T-12-2002 3,945,200.06 630,600.00 4,575,800.00
9 1 M2 Gudang Semen dan Alat-alat PU.A.9 RSNI T-12-2002 951,083.98 462,800.00 1,413,883.00
10 1 M2 Rumah Jaga/konstruksi Kayu PU.A.10 RSNI T-12-2002 1,060,016.65 378,900.00 1,438,916.00
11 1 M2 Bedeng Buruh PU.A.11 RSNI T-12-2002 1,022,073.53 462,800.00 1,484,873.00
12 1 M2 Camp Darurat Kontsruksi Kayu PU.A.12 HPS.PU. 2016 283,138.75 295,000.00 578,138.00
13 1 Unit Camp Darurat - Terpal PU.A.13 HPS.PU. 2016 1,825,554.40 387,000.00 2,212,554.00
14 1 M3 Bongkaran Beton Bertulang PU.A.14 RSNI T-12-2002 - 847,978.00 847,978.00
15 1 M3 Bongkaran Dnding Tembok Bata Merah PU.A.15 RSNI T-12-2002 - 792,778.00 792,778.00
16 1 M2 Membersihkan Saluran (Drainase) PU.A.16 HPS.PU. 2016 - 3,634.46 3,634.00
17 1 Ret Pengangkutan Sampah (10 KM) PU.A.17 HPS.PU. 2016 - 91,330.34 91,330.00
18 1 M2 Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm PU.A.18 RSNI T-12-2002 170,494.29 45,300.00 215,794.00
19 1 M3 Bongkaran dinding tembok bata merah PU.A.19 RSNI T-12-2002 - 847,978.00 847,978.00
20 1 M3 Bongkaran beton bertulang PU.A.20 RSNI T-12-2002 - 847,978.00 847,978.00
21 1 M3 Pembongkaran lantai PU.A.21 HPS.PU. 2016 - 254,400.00 254,400.00
22 1 M2 Mengupas plesteran PU.A.22 HPS.PU. 2016 - 12,720.00 12,720.00
16 1 M3 Campuran Beton 1PC : 2PS - Pasir Lokal (mekanis) PU.D.16 HPS.PU. 2016 2,752,881.00 722,419.18 3,475,300.00
17 1 M3 Campuran Beton 1PC : 3PS - Pasir Lokal (mekanis) PU.D.17 HPS.PU. 2016 2,398,107.38 709,064.79 3,107,172.00
18 1 M3 Campuran Beton 1PC : 4PS - Pasir Lokal (mekanis) PU.D.18 HPS.PU. 2016 2,185,243.20 701,052.15 2,886,295.00
19 1 M3 Campuran Beton 1PC : 5PS - Pasir Lokal (mekanis) PU.D.19 HPS.PU. 2016 2,043,333.75 695,710.39 2,739,044.00
20 1 M3 Campuran Beton 1PC : 6PS - Pasir Lokal (mekanis) PU.D.20 HPS.PU. 2016 1,941,969.86 691,894.85 2,633,864.00
21 1 M3 Campuran Beton 1PC : 2PS : 3KR, Import - Manual PU.D.21 HPS.PU. 2016 2,886,175.83 931,000.00 3,817,175.00
22 1 M3 Campuran Beton 1PC : 3PS : 5KR, Import - Manual PU.D.22 HPS.PU. 2016 2,708,460.37 931,000.00 3,639,460.00
23 1 M3 Campuran Beton 1PC : 4PS : 6KR, Import - Manual PU.D.23 HPS.PU. 2016 2,640,276.36 931,000.00 3,571,276.00
24 1 M3 Campuran beton 1PC : 2PS : 3KR, Import (mekanis) PU.D.24 HPS.PU. 2016 2,886,175.83 690,087.49 3,576,263.00
25 1 M3 Campuran beton 1PC : 3PS : 5KR, Import (mekanis) PU.D.25 HPS.PU. 2016 2,708,460.37 683,058.86 3,391,519.00
26 1 M3 Campuran beton 1PC : 4PS : 6KR, Import (mekanis) PU.D.26 HPS.PU. 2016 2,640,276.36 680,502.99 3,320,779.00
27 1 M3 Beton mutu f’'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 PU.D.27 SNI 7394:2008 2,565,219.72 256,025.00 2,821,244.00
28 1 M3 Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 PU.D.28 SNI 7394:2008 2,609,656.09 256,025.00 2,865,681.00
29 1 M3 Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 PU.D.29 SNI 7394:2008 2,642,808.65 256,025.00 2,898,833.00
30 1 M3 Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87 PU.D.30 SNI 7394:2008 2,576,257.74 186,200.00 2,762,457.00
31 1 M3 Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 PU.D.31 SNI 7394:2008 2,683,233.79 256,025.00 2,939,258.00
32 1 M3 Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 PU.D.32 SNI 7394:2008 2,720,651.76 256,025.00 2,976,676.00
33 1 M3 Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 PU.D.33 SNI 7394:2008 2,751,515.56 256,025.00 3,007,540.00
34 1 M3 Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 PU.D.34 SNI 7394:2008 2,769,249.11 256,025.00 3,025,274.00
35 1 M3 Beton mutu f’'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 PU.D.35 SNI 7394:2008 2,802,009.72 256,025.00 3,058,034.00
36 1 M3 Beton mutu f’'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 PU.D.36 SNI 7394:2008 2,811,055.80 256,025.00 3,067,080.00
37 1 M3 Beton mutu f’'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 PU.D.37 SNI 7394:2008 2,848,597.07 325,850.00 3,174,447.00
38 1 M3 Beton mutu f’'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 PU.D.38 SNI 7394:2008 2,861,549.96 325,850.00 3,187,399.00
39 1 KG Pembesian Besi polos/ulir Ø. 6 mm SNI PU.D.39 SNI 7394:2008 15,661.86 2,074.20 17,736.00
40 1 KG Pembesian Besi polos/ulir Ø. 8 mm SNI PU.D.40 SNI 7394:2008 13,693.11 2,074.20 15,767.00
41 1 KG Pembesian Besi polos/ulir Ø. 10 mm SNI PU.D.41 SNI 7394:2008 13,621.71 2,074.20 15,695.00
42 1 KG Pembesian Besi polos/ulir Ø. 12 mm SNI PU.D.42 SNI 7394:2008 13,625.91 2,074.20 15,700.00
43 1 KG Pembesian Besi polos/ulir Ø. 14 mm SNI PU.D.43 SNI 7394:2008 13,967.16 2,074.20 16,041.00
44 1 KG Pembesian Besi polos/ulir Ø. 16 mm SNI PU.D.44 SNI 7394:2008 14,288.46 2,074.20 16,362.00
45 1 KG Pembesian Besi polos/ulir Ø. 19 mm SNI PU.D.45 SNI 7394:2008 14,722.11 2,074.20 16,796.00
46 1 KG Pembesian Besi polos/ulir Ø. 22 mm SNI PU.D.46 SNI 7394:2008 15,036.06 2,074.20 17,110.00
47 1 M2 Bekisting untuk Pondasi PU.D.47 SNI 7394:2008 137,526.38 109,772.00 247,298.00
48 1 M2 Bekisting untuk Sloof PU.D.48 SNI 7394:2008 154,074.77 109,772.00 263,846.00
49 1 M2 Bekisting untuk Kolom PU.D.49 SNI 7394:2008 357,063.18 139,326.00 496,389.00
50 1 M2 Bekisting untuk Balok PU.D.50 SNI 7394:2008 369,935.13 139,326.00 509,261.00
51 1 M2 Bekisting untuk Pelat Lantai PU.D.51 SNI 7394:2008 431,167.18 139,326.00 570,493.00
52 1 M2 Bekisting untuk Pelat Dinding PU.D.52 SNI 7394:2008 443,945.67 139,326.00 583,271.00
53 1 M2 Bekisting untuk Tangga PU.D.53 SNI 7394:2008 323,920.36 139,326.00 463,246.00
54 1 M2 Pasang Jembatan untuk Pengecoran Beton PU.D.54 SNI 7394:2008 106,732.87 27,562.00 134,294.00
55 1 M2 Cetakan Beton / Begisting Memakai Papan PU.D.55 HPS.PU. 2016 175,746.37 109,340.00 285,086.00
56 1 M2 Cetakan Beton / Begisting Memakai Multiplek PU.D.56 HPS.PU. 2016 202,745.70 109,340.00 312,085.00
57 1 M3 Membongkar cetakan / Bekisting Beton PU.D.57 HPS.PU. 2016 - 472,000.00 472,000.00
58 1 Set Stutwerk utk 1 M3 Beton, h = 3 - 4 m (Memakai Kayu Dolken) PU.D.58 HPS.PU. 2016 518,728.00 2,207,100.00 2,725,828.00
59 1 Set Stutwerk utk 1 M3 Beton, h = 3 - 4 m (Memakai Scafolding) PU.D.59 640,000.00 868,980.00 1,508,980.00
ANALISA PU.D.60 s/d PU.D.67 UNTUK GAMBAR RENCANA YANG BELUM MEMPUNYAI GAMBAR DETAIL
60 1 M3 Pondasi beton bertulang (150 kg besi + bekisting) PU.D.60 SNI 7394:2008 5,486,330.33 1,114,551.00 6,600,881.00
61 1 M3 Sloof beton bertulang (200 kg besi + bekisting) PU.D.61 SNI 7394:2008 6,414,021.42 1,261,521.00 7,675,542.00
62 1 M3 Kolom beton bertulang (300 kg besi + bekisting) PU.D.62 SNI 7394:2008 ### 1,572,331.00 11,991,341.00
63 1 M3 Balok beton bertulang (200 kg besi + bekisting) PU.D.63 SNI 7394:2008 8,428,526.49 1,365,831.00 9,794,357.00
64 1 M3 Plat beton bertulang (150 kg besi + bekisting) PU.D.64 SNI 7394:2008 7,958,043.93 1,115,055.00 9,073,098.00
65 1 M3 Dinding beton bertulang (150 kg besi + bekisting) PU.D.65 SNI 7394:2008 7,710,355.89 1,114,551.00 8,824,906.00
66 1 M3 Dinding beton bertulang (200 kg besi + bekisting) PU.D.66 SNI 7394:2008 7,906,162.05 1,261,521.00 9,167,683.00
67 1 M3 Tangga beton bertulang (150 kg besi + bekisting) PU.D.67 HPS.PU. 2016 7,675,850.16 1,377,558.00 9,053,408.00
68 1 M' Kolom penguat/praktis beton bertulang (11 x 11) cm PU.D.68 SNI 7394:2008 77,103.19 32,964.00 110,067.00
69 1 M' Sloof/Ring balok beton bertulang (10 x 15) cm PU.D.69 SNI 7394:2008 104,873.18 54,435.00 159,308.00
70 1 M' Kolom 15 x 15 (1PC : 3PS) - Pasir Import PU.D.70 HPS.PU. 2016 201,602.00
71 1 M' Kolom 15 x 15 (1PC : 3PS) - Pasir Lokal PU.D.71 HPS.PU. 2016 184,136.00
72 1 M' Balok 15 x 15 (1PC : 3PS) - Pasir Import PU.D.72 HPS.PU. 2016 201,602.00
73 1 M' Balok 15 x 15 (1PC : 3PS) - Pasir Lokal PU.D.73 HPS.PU. 2016 184,136.00
74 1 Btg Tiang Pancang Beton 20x20; L=5 M (1PC : 2PS : 3KR) PU.D.74 HPS.PU. 2016 5,602,435.13 - 5,602,435.00
75 1 M' Bantalan Pelat Beton (1PC : 3PS) - Pasir Import PU.D.75 HPS.PU. 2016 152,522.00
76 1 M' Bantalan Pelat Beton (1PC : 3PS) - Pasir Lokal PU.D.76 HPS.PU. 2016 135,056.00
F. PEKERJAAN PLESTERAN
1 1 M2 Plesteran 1PC : 1PS, Tebal 15 mm - Pasir Import PU.F.1 SNI 2837:2008 61,173.39 63,330.00 124,503.00
2 1 M2 Plesteran 1PC : 2PS, Tebal 15 mm - Pasir Import PU.F.2 SNI 2837:2008 53,714.08 63,330.00 117,044.00
3 1 M2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Import PU.F.3 SNI 2837:2008 51,876.92 63,330.00 115,206.00
4 1 M2 Plesteran 1PC : 4PS, Tebal 15 mm - Pasir Import PU.F.4 SNI 2837:2008 49,475.33 63,330.00 112,805.00
5 1 M2 Plesteran 1PC : 5PS, Tebal 15 mm - Pasir Import PU.F.5 SNI 2837:2008 49,681.91 63,330.00 113,011.00
6 1 M2 Plesteran 1PC : 1PS, Tebal 15 mm - Pasir Lokal PU.F.6 SNI 2837:2008 52,754.50 63,330.00 116,084.00
7 1 M2 Plesteran 1PC : 2PS, Tebal 15 mm - Pasir Lokal PU.F.7 SNI 2837:2008 43,190.46 63,330.00 106,520.00
8 1 M2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Lokal PU.F.8 SNI 2837:2008 39,774.75 63,330.00 103,104.00
9 1 M2 Plesteran 1PC : 4PS, Tebal 15 mm - Pasir Lokal PU.F.9 SNI 2837:2008 36,846.98 63,330.00 100,176.00
10 1 M2 Plesteran 1PC : 5PS, Tebal 15 mm - Pasir Lokal PU.F.10 SNI 2837:2008 36,001.21 63,330.00 99,331.00
11 1 M2 Plesteran 1PC : 6PS, Tebal 15 mm - Pasir Lokal PU.F.11 SNI 2837:2008 34,981.92 63,330.00 98,311.00
12 1 M2 Plesteran 1PC : 7PS, Tebal 15 mm - Pasir Lokal PU.F.12 SNI 2837:2008 34,678.31 63,330.00 98,008.00
13 1 M2 Plesteran 1PC : 8PS, Tebal 15 mm - Pasir Lokal PU.F.13 SNI 2837:2008 34,374.70 63,330.00 97,704.00
14 1 M2 Plesteran 1PC : 2PS, Tebal 20 mm - Pasir Import PU.F.14 SNI 2837:2008 72,090.56 84,808.00 156,898.00
15 1 M2 Plesteran 1PC : 3PS, Tebal 20 mm - Pasir Import PU.F.15 SNI 2837:2008 69,641.01 84,808.00 154,449.00
HARGA SATUAN PEKERJAAN (HSP)
16 1 M2 Plesteran 1PC : 4PS, Tebal 20 mm - Pasir Import PU.F.16 SNI 2837:2008 65,967.10 84,808.00 150,775.00
17 1 M2 Plesteran 1PC : 5PS, Tebal 20 mm - Pasir Import PU.F.17 SNI 2837:2008 66,714.34 84,808.00 151,522.00
18 1 M2 Plesteran 1PC : 2PS, Tebal 20 mm - Pasir Lokal PU.F.18 SNI 2837:2008 57,883.68 84,808.00 142,691.00
19 1 M2 Plesteran 1PC : 3PS, Tebal 20 mm - Pasir Lokal PU.F.19 SNI 2837:2008 53,329.40 84,808.00 138,137.00
20 1 M2 Plesteran 1PC : 4PS, Tebal 20 mm - Pasir Lokal PU.F.20 SNI 2837:2008 49,129.31 84,808.00 133,937.00
21 1 M2 Plesteran 1PC : 5PS, Tebal 20 mm - Pasir Lokal PU.F.21 SNI 2837:2008 48,298.01 84,808.00 133,106.00
22 1 M2 Plesteran 1PC : 6PS, Tebal 20 mm - Pasir Lokal PU.F.22 SNI 2837:2008 46,642.56 84,808.00 131,450.00
23 1 M2 Plesteran 1PC : 2PS, Tebal 25 mm - Pasir Import PU.F.23 HPS.PU. 2016 56,917.34 71,260.00 128,177.00
24 1 M2 Plesteran 1PC : 3PS, Tebal 25 mm - Pasir Import PU.F.24 HPS.PU. 2016 78,736.77 71,352.00 150,088.00
25 1 M2 Plesteran 1PC : 4PS, Tebal 25 mm - Pasir Import PU.F.25 HPS.PU. 2016 77,341.94 71,352.00 148,693.00
26 1 M2 Plesteran 1PC : 5PS, Tebal 25 mm - Pasir Import PU.F.26 HPS.PU. 2016 74,930.41 71,352.00 146,282.00
27 1 M2 Plesteran 1PC : 2PS, Tebal 25 mm - Pasir Lokal PU.F.27 HPS.PU. 2016 50,076.98 71,260.00 121,336.00
28 1 M2 Plesteran 1PC : 3PS, Tebal 25 mm - Pasir Lokal PU.F.28 HPS.PU. 2016 60,320.44 71,352.00 131,672.00
29 1 M2 Plesteran 1PC : 4PS, Tebal 25 mm - Pasir Lokal PU.F.29 HPS.PU. 2016 57,347.06 71,352.00 128,699.00
30 1 M2 Plesteran 1PC : 5PS, Tebal 25 mm - Pasir Lokal PU.F.30 HPS.PU. 2016 54,409.35 71,352.00 125,761.00
31 1 M2 Plesteran 1PC : 2PS, Tebal 30 mm - Pasir Import PU.F.31 HPS.PU. 2016 95,883.27 82,470.00 178,353.00
32 1 M2 Plesteran 1PC : 3PS, Tebal 30 mm - Pasir Import PU.F.32 HPS.PU. 2016 90,362.26 82,470.00 172,832.00
33 1 M2 Plesteran 1PC : 2PS, Tebal 30 mm - Pasir Lokal PU.F.33 HPS.PU. 2016 77,466.94 82,470.00 159,936.00
34 1 M2 Plesteran 1PC : 3PS, Tebal 30 mm - Pasir Lokal PU.F.34 HPS.PU. 2016 69,841.20 82,470.00 152,311.00
35 1 M2 Plesteran 1PC : 4PS, Tebal 30 mm - Pasir Lokal PU.F.35 HPS.PU. 2016 65,625.32 82,470.00 148,095.00
36 1 M2 Plesteran 1PC : 5PS, Tebal 30 mm - Pasir Lokal PU.F.36 HPS.PU. 2016 60,365.74 82,470.00 142,835.00
37 1 M2 Barapen 1PC : 3PS, Tebal 30 mm - Pasir Import PU.F.37 HPS.PU. 2016 47,291.76 30,918.00 78,209.00
38 1 M2 Barapen 1PC : 3PS, Tebal 30 mm - Pasir Lokal PU.F.38 HPS.PU. 2016 36,241.96 30,918.00 67,159.00
39 1 M2 Barapen 1PC : 5PS, Tebal 30 mm - Pasir Lokal PU.F.39 HPS.PU. 2016 34,541.34 30,918.00 65,459.00
40 1 M2 Plesteran Batu Kali 1PC : 3PS - Pasir Lokal PU.F.40 HPS.PU. 2016 37,527.91 84,440.00 121,967.00
41 1 M2 Plesteran Batu Kali 1PC : 4PS - Pasir Lokal PU.F.41 HPS.PU. 2016 34,763.93 84,440.00 119,203.00
42 1 M2 Plesteran Skoning 1PC : 2PS, Tebal 10 mm - Pasir Lokal PU.F.42 SNI 2837:2008 12,801.98 77,296.00 90,097.00
43 1 M2 Plesteran Ciprat 1PC : 2PS, Tebal 10 mm - Pasir Lokal PU.F.43 SNI 2837:2008 16,070.35 54,940.00 71,010.00
44 1 M2 Finishing Siar Pasangan Dinding Bata Merah 20 M' PU.F.44 SNI 2837:2008 7,723.38 31,841.00 39,564.00
45 1 M2 Finishing Siar Pasangan Dinding Coneblock Ekspose 8 M' PU.F.45 HPS.PU. 2016 3,976.00 14,953.00 18,929.00
46 1 M2 Finishing Siar Pasangan Batu Kali/Belah Adukan 1PC : 2PS PU.F.46 SNI 2837:2008 26,425.19 63,330.00 89,755.00
47 1 M2 Acian PU.F.47 SNI 2837:2008 8,076.25 42,220.00 50,296.00
48 1 M' Benangan PU.F.48 HPS.PU. 2016 4,348.75 12,042.00 16,390.00
G. PEKERJAAN KAYU
1 1 M3 Kusen Pintu dan Jendela Kayu Kelas I PU.G.1 SNI 3434:2008 8,500,377.40 4,414,200.00 12,914,577.00
2 1 M3 Kusen Pintu dan Jendela Kayu Kelas II PU.G.2 SNI 3434:2008 5,214,950.60 3,783,600.00 8,998,550.00
3 1 M3 Kusen Pintu dan Jendela Kayu Kelas III PU.G.3 SNI 3434:2008 4,037,779.40 3,783,600.00 7,821,379.00
4 1 M2 Pintu Klamp Standar Kayu Kelas II PU.G.4 SNI 3434:2008 160,967.32 220,802.00 381,769.00
5 1 M2 Pintu Klamp Sederhana Kayu Kelas III PU.G.5 SNI 3434:2008 133,228.28 220,802.00 354,030.00
6 1 M2 Daun Pintu Panel Kayu Kelas I PU.G.6 SNI 3434:2008 352,267.06 630,600.00 982,867.00
7 1 M2 Daun Pintu Panel Kayu Kelas II PU.G.7 SNI 3434:2008 182,694.62 630,600.00 813,294.00
8 1 M2 Pintu dan Jendela Kaca, Kayu Kelas I PU.G.8 SNI 3434:2008 432,332.24 504,480.00 936,812.00
9 1 M2 Pintu dan Jendela Kaca, Kayu Kelas II PU.G.9 SNI 3434:2008 330,588.77 504,480.00 835,068.00
10 1 M2 Pintu dan Jendela Jalusi, Kayu Kelas I PU.G.10 SNI 3434:2008 550,086.20 630,600.00 1,180,686.00
11 1 M2 Pintu dan Jendela Jalusi, Kayu Kelas II PU.G.11 SNI 3434:2008 278,770.29 630,600.00 909,370.00
12 1 M2 Daun Pintu Kayu Lapis (Plywood) Rangkap, Rangka Tertutup PU.G.12 SNI 3434:2008 216,566.05 630,600.00 847,166.00
Kayu Kelas II (Lebar Sampai 90 cm)
13 1 M2 Pintu Plywood Rangkap Rangka Expose, Kayu Kelas I PU.G.13 SNI 3434:2008 327,494.30 504,480.00 831,974.00
14 1 M2 Pintu Plywood Rangkap Rangka Expose, Kayu Kelas II PU.G.14 SNI 3434:2008 218,967.94 504,480.00 723,447.00
15 1 M2 Jalusi Kusen, Kayu Kelas I PU.G.15 SNI 3434:2008 497,071.44 476,300.00 973,371.00
16 1 M2 Jalusi Kusen, Kayu Kelas II PU.G.16 SNI 3434:2008 242,712.78 476,300.00 719,012.00
17 1 M2 Teakwood Rangkap Rangka Expose, Kayu Kelas I PU.G.17 SNI 3434:2008 355,439.30 504,480.00 859,919.00
18 1 M2 Teakwood Rangkap Lapis Formika Rangka Expose, Kayu Kelas II PU.G.18 SNI 3434:2008 431,868.65 504,480.00 936,348.00
19 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas I PU.G.19 SNI 3434:2008 8,660,454.80 2,522,400.00 11,182,854.00
20 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas II PU.G.20 SNI 3434:2008 4,945,962.70 2,522,400.00 7,468,362.00
21 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas III PU.G.21 SNI 3434:2008 3,866,889.10 2,522,400.00 6,389,289.00
22 1 M3 Konstruksi Kuda-Kuda Expose, Kayu Kelas I PU.G.22 SNI 3434:2008 9,427,201.20 4,225,020.00 13,652,221.00
23 1 M3 Konstruksi Gordeng - Kayu Kelas II PU.G.23 SNI 3434:2008 4,902,220.30 1,513,440.00 6,415,660.00
24 1 M3 Konstruksi Gordeng - Kayu Kelas III PU.G.24 SNI 3434:2008 3,823,146.70 1,513,440.00 5,336,586.00
25 1 M2 Rangka Atap Genteng Keramik, Kayu Kelas II PU.G.25 SNI 3434:2008 99,292.64 29,500.00 128,792.00
26 1 M2 Rangka Atap Genteng Beton, Kayu Kelas II PU.G.26 SNI 3434:2008 134,310.14 29,500.00 163,810.00
27 1 M2 Rangka Atap Genteng Sirap, Kayu Kelas II PU.G.27 SNI 3434:2008 711,322.55 35,400.00 746,722.00
28 1 M2 Rangka Plafond (50 x 100), Kayu Kelas II PU.G.28 SNI 3434:2008 69,440.86 81,840.00 151,280.00
29 1 M2 Rangka Plafond (50 x 100), Kayu Kelas III PU.G.29 SNI 3434:2008 54,333.83 81,840.00 136,173.00
30 1 M2 Rangka Plafond (60 x 60), Kayu Kelas II PU.G.30 SNI 3434:2008 74,143.64 75,780.00 149,923.00
31 1 M2 Rangka Plafond (60 x 60), Kayu Kelas III PU.G.31 SNI 3434:2008 58,153.74 75,780.00 133,933.00
32 1 M2 Rangka Plafond (100 x 100), Kayu Kelas II PU.G.32 HPS.PU. 2016 53,170.24 73,450.00 126,620.00
33 1 M2 Rangka Plafond (100 x 100), Kayu Kelas III PU.G.33 HPS.PU. 2016 41,398.52 61,030.00 102,428.00
34 1 M2 Rangka Plafond (60 x 120), Kayu Kelas II PU.G.34 HPS.PU. 2016 57,797.37 66,930.00 124,727.00
35 1 M2 Rangka Plafond (60 x 120), Kayu Kelas III PU.G.35 HPS.PU. 2016 45,044.68 66,930.00 111,974.00
36 1 M' Lisplank Ukuran (3 x 20) cm, Kayu Kelas I PU.G.36 SNI 3434:2008 90,701.01 46,280.00 136,981.00
37 1 M' Lisplank Ukuran (3 x 20) cm, Kayu Kelas II PU.G.37 SNI 3434:2008 44,916.45 46,280.00 91,196.00
38 1 M' Lisplank Ukuran (3 x 30) cm, Kayu Kelas I PU.G.38 SNI 3434:2008 91,508.30 46,280.00 137,788.00
39 1 M' Lisplank Ukuran (3 x 30) cm, Kayu Kelas II PU.G.39 SNI 3434:2008 44,875.88 46,280.00 91,155.00
40 1 M' Lisplank Ukuran (2 x 20) cm, Kayu Kelas I PU.G.40 HPS.PU. 2016 40,573.27 29,500.00 70,073.00
41 1 M' Lisplank Ukuran (2 x 20) cm, Kayu Kelas II PU.G.41 HPS.PU. 2016 20,224.57 29,500.00 49,724.00
42 1 M' Lisplank Ukuran (2x25) cm, Kayu Kelas I PU.G.42 HPS.PU. 2016 50,464.22 29,500.00 79,964.00
43 1 M' Lisplank Ukuran (2x25) cm, Kayu Kelas II PU.G.43 HPS.PU. 2016 25,028.36 29,500.00 54,528.00
44 1 M' Lisplank Ukuran 2 x (3x20) cm, Kayu Kelas I PU.G.44 HPS.PU. 2016 120,525.17 61,030.00 181,555.00
45 1 M' Lisplank Ukuran 2 x (3x20) cm, Kayu Kelas II PU.G.45 HPS.PU. 2016 59,055.16 61,030.00 120,085.00
46 1 M' Lisplank Ukuran (2x20) cm, Kayu Kelas I PU.G.46 HPS.PU. 2016 71,894.63 29,500.00 101,394.00
47 1 M' Lisplank Ukuran (2x20) cm, Kayu Kelas II PU.G.47 HPS.PU. 2016 35,436.56 29,500.00 64,936.00
48 1 M' Lisplank Ukuran (2x20) cm, Kayu Kelas III PU.G.48 HPS.PU. 2016 29,472.66 29,500.00 58,972.00
49 1 M' Papan Ruiter, Kayu Kelas II PU.G.49 HPS.PU. 2016 16,349.09 16,985.60 33,334.00
50 1 M2 Dinding Bilik Bambu, Rangka Kayu Kelas III PU.G.50 SNI 3434:2008 538,110.95 21,110.00 559,220.00
51 1 M2 Dinding Bilik Bambu, Rangka Kayu Kelas IV PU.G.51 SNI 3434:2008 529,585.36 21,110.00 550,695.00
52 1 M2 Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas II PU.G.52 SNI 3434:2008 122,661.88 94,682.00 217,343.00
53 1 M2 Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas III PU.G.53 SNI 3434:2008 95,194.56 94,682.00 189,876.00
54 1 M2 Rangka Dinding Pemisah Teakwood Rangkap, PU.G.54 SNI 3434:2008 252,307.34 94,682.00 346,989.00
55 1 M2 Rangka Dinding Pemisah Plywood Rangkap, PU.G.55 SNI 3434:2008 364,287.94 126,120.00 490,407.00
56 1 M2 Lambriziring Dari Papan Kayu Kelas I PU.G.56 SNI 3434:2008 64,163.00 378,360.00 442,522.00
57 1 M2 Lambriziring dari Plywood Ukuran (120 x 240) cm PU.G.57 SNI 3434:2008 101,468.80 15,803.00 117,271.00
58 1 M3 Rangka/kolom dinding kayu - Kelas I PU.G.58 HPS.PU. 2016 8,767,736.40 3,864,800.00 12,632,536.00
59 1 M3 Rangka/kolom dinding kayu - Kelas II PU.G.59 HPS.PU. 2016 5,053,244.30 3,864,800.00 8,918,044.00
60 1 M3 Rangka/kolom dinding kayu - Kelas III PU.G.60 HPS.PU. 2016 3,974,170.70 3,864,800.00 7,838,970.00
61 1 M3 Gelagar bawah lantai - Kayu Kelas I PU.G.61 HPS.PU. 2016 8,467,760.40 3,280,200.00 11,747,960.00
62 1 M3 Gelagar bawah lantai - Kayu Kelas II PU.G.62 HPS.PU. 2016 4,753,268.30 3,280,200.00 8,033,468.00
63 1 M3 Gelagar bawah lantai - Kayu Kelas III PU.G.63 HPS.PU. 2016 3,674,194.70 3,280,200.00 6,954,394.00
64 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas I PU.G.64 HPS.PU. 2016 301,067.49 119,440.00 420,507.00
65 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas II PU.G.65 HPS.PU. 2016 166,108.26 119,440.00 285,548.00
66 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas III PU.G.66 HPS.PU. 2016 128,419.95 119,440.00 247,859.00
67 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas I PU.G.67 HPS.PU. 2016 250,563.12 193,040.00 443,603.00
68 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas II PU.G.68 HPS.PU. 2016 134,883.78 193,040.00 327,923.00
69 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas III PU.G.69 HPS.PU. 2016 102,579.51 193,040.00 295,619.00
HARGA SATUAN PEKERJAAN (HSP)
70 1 M2 Jalusi kayu kelas I + lapis has nyamuk PU.G.70 HPS.PU. 2016 306,464.79 102,736.00 409,200.00
71 1 M2 Jalusi kayu kelas II + lapis has nyamuk PU.G.71 HPS.PU. 2016 164,023.94 102,736.00 266,759.00
72 1 M2 Jalusi kayu kelas III + lapis has nyamuk PU.G.72 HPS.PU. 2016 140,723.15 102,736.00 243,459.00
73 1 M2 Jalusi kayu kelas IV + lapis has nyamuk PU.G.73 HPS.PU. 2016 104,805.72 102,736.00 207,541.00
74 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Manual PU.G.74 HPS.PU. 2016 - 128,847.80 128,847.00
75 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Manual PU.G.75 HPS.PU. 2016 - 111,276.02 111,276.00
76 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Mekanis PU.G.76 HPS.PU. 2016 - 143,951.33 143,951.00
77 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Mekanis PU.G.77 HPS.PU. 2016 - 138,332.00 138,332.00
78 1 Btg Pancang Tiang Cerucuk Kayu (Excavator) PU.G.78 HPS.PU. 2016 - 277,902.67 277,902.00
79 1 Btg Pancang Tiang Cerucuk Beton (Excavator) PU.G.79 HPS.PU. 2016 - 294,760.67 294,760.00
80 1 Btg Pancang Tiang Umpak untuk Pondasi Rumah PU.G.80 HPS.PU. 2016 56,856.00 42,340.57 99,196.00
81 1 M3 Gelagar Melintang Jembatan PU.G.81 HPS.PU. 2016 3,932,544.70 5,044,800.00 8,977,344.00
82 1 M3 Gelagar Memanjang Jembatan PU.G.82 HPS.PU. 2016 3,766,824.70 5,044,800.00 8,811,624.00
83 1 M2 Lantai dan Dinding Turap Jembatan PU.G.83 HPS.PU. 2016 194,650.24 214,493.33 409,143.00
84 1 M3 Sandaran dan Balok Pengikat Tiang Pancang Jembatan PU.G.84 HPS.PU. 2016 3,766,824.70 5,044,800.00 8,811,624.00
H. PEKERJAAN ATAP
1 1 M2 Penutup Atap Seng Gelombang BJLS 0,30 PU.H.1 SNI 03-3436-200 53,286.92 25,332.00 78,618.00
2 1 M2 Penutup Atap Seng Gelombang BJLS 0,22 PU.H.2 SNI 03-3436-200 48,819.52 25,332.00 74,151.00
3 1 M2 Penutup Atap Seng Gelombang BJLS 0,20 PU.H.3 SNI 03-3436-200 37,443.12 25,332.00 62,775.00
4 1 M' Bubungan/Nok Atap Seng Gelombang BJLS 0,30 PU.H.4 SNI 03-3436-200 32,919.35 57,804.00 90,723.00
5 1 M' Bubungan/Nok Atap Seng Gelombang BJLS 0,20 PU.H.5 SNI 03-3436-200 34,823.75 57,804.00 92,627.00
6 1 M2 Penutup Atap Fiberglass Gelombang PU.H.6 SNI 03-3436-200 60,145.66 29,101.00 89,246.00
7 1 M' Bubungan/Nok Atap Fiberglass Gelombang PU.H.7 SNI 03-3436-200 34,823.75 57,804.00 92,627.00
8 1 M2 Penutup Atap Genteng Metal - Multiroof PU.H.8 SNI 03-3436-200 68,854.35 40,564.00 109,418.00
9 1 M' Bubungan/Nok Atap Genteng Metal - Multiroof PU.H.9 SNI 03-3436-200 35,084.20 57,062.00 92,146.00
10 1 M2 Penutup Atap Alumunium Gelombang PU.H.10 SNI 03-3436-200 87,583.00 25,332.00 112,915.00
11 1 M' Bubungan/Nok Atap Alumunium Gelombang PU.H.11 SNI 03-3436-200 97,913.00 29,500.00 127,413.00
12 1 M' Talang Datar / Jurai Seng BJLS Lebar 90 cm PU.H.12 SNI 7393-2008 112,148.12 90,040.00 202,188.00
13 1 M' Talang ½ Lingkaran D-15 cm, Seng Plat BJLS 30 45 cm PU.H.13 SNI 7393-2008 15,486.07 69,420.00 84,906.00
13 1 M2 Pasang Kawat Nyamuk (Rangka Kayu) PU.J.13 HPS.PU. 2016 35,801.66 28,672.00 64,473.00
14 1 M2 Pasang Kawat Harmonika PU.J.14 HPS.PU. 2016 60,853.06 28,672.00 89,525.00
15 1 M2 Pasang Kawat Kassa PU.J.15 HPS.PU. 2016 35,801.66 28,672.00 64,473.00
16 1 M2 Pasang Kawat Burung PU.J.16 HPS.PU. 2016 52,518.36 28,672.00 81,190.00
17 1 M2 Jendela Nako dan Tralis PU.J.17 SNI 7393-2008 322,740.00 141,480.00 464,220.00
HARGA SATUAN PEKERJAAN (HSP)
18 1 KG Plat Besi Lembaran tebal : 1.0 mm - 120 x 240 Cm PU.J.18 HPS.PU. 2016 19,773.10 17,700.00 37,473.00
19 1 KG Plat Besi Lembaran tebal : 1.2 mm - 120 x 240 Cm PU.J.19 HPS.PU. 2016 18,757.65 17,700.00 36,457.00
20 1 KG Plat Besi Lembaran tebal : 2.0 mm - 120 x 240 Cm PU.J.20 HPS.PU. 2016 16,662.35 17,700.00 34,362.00
21 1 KG Plat Besi Lembaran tebal : 3.0 mm - 120 x 240 Cm PU.J.21 HPS.PU. 2016 17,368.45 17,700.00 35,068.00
12 1 M2 Mengecat Penutup 2 Lapis Pada Permukaan Besi (manual) PU.N.12 Pt.T-38-2000-C 16,961.10 44,342.00 61,303.00
HARGA SATUAN PEKERJAAN (HSP)
13 1 M2 Pelapisan Bidang Kayu Dengan Residu / ter PU.N.13 Pt.T-38-2000-C 7,452.86 16,780.00 24,232.00
14 1 M2 Cat tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) PU.N.14 HPS.PU. 2016 5,708.36 13,391.40 19,099.00
15 1 M2 Cat tembok lama (1 lapis cat dasar, 2 lapis cat penutup) PU.N.15 HPS.PU. 2016 3,829.80 10,811.60 14,641.00
16 1 M2 Cat ulang dinding/tembok PU.N.16 HPS.PU. 2016 12,732.00
11 1 M2 Pelapisan Bidang Besi-Baja Dengan Meny PU.N.11 Pt.T-38-2000-C 7,082.65 9,586.00 16,668.00
12 1 M2 Mengecat Penutup 2 Lapis Pada Permukaan Besi (manual) PU.N.12 Pt.T-38-2000-C 16,961.10 44,342.00 61,303.00
13 1 M2 Pelapisan Bidang Kayu Dengan Residu / ter PU.N.13 Pt.T-38-2000-C 7,452.86 16,780.00 24,232.00
P. PEKERJAAN ASPAL
1 1 M2 Lapis Resap Pengikat (Prime Coat) - Manual PU.P.1 HPS.PU. 2016 22,568.90 1,773.30 24,342.00
2 1 M2 Lapis Resap Pengikat (Prime Coat) - Mekanis PU.P.2 HPS.PU. 2016 17,568.90 3,520.68 21,089.00
3 1 M2 Lapis Perekat (Tack Coat) - Manual PU.P.3 HPS.PU. 2016 24,706.65 1,773.30 26,479.00
4 1 M2 Lapis Perekat (Tack Coat) - Mekanis PU.P.4 HPS.PU. 2016 19,706.65 4,096.45 23,803.00
5 1 M2 Latasir (SS) Kelas B (Pasir Import) tebal 2 cm PU.P.5 HPS.PU. 2016 192,971.87 35,360.12 228,331.00
6 1 M2 Latasir (SS) Kelas B (Pasir lokal) tebal 2 cm PU.P.6 HPS.PU. 2016 175,583.70 30,897.93 206,481.00
7 1 M2 Latasir (SS) Kelas B (Pasir Import) tebal 1,5 cm PU.P.7 HPS.PU. 2016 160,463.27 19,888.67 180,351.00
8 1 M2 Latasir (SS) Kelas B (Pasir lokal) tebal 1,5 cm PU.P.8 HPS.PU. 2016 147,422.14 22,935.11 170,357.00
9 1 M2 Lapis Permukaan Lataston (Tebal 4 CM) PU.P.9 HPS.PU. 2016 411,213.70 161,163.22 572,376.00
Catatan :
1. Biaya satuan sudah termasuk overhead dan keuntungan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
2. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Ir. TRI TEGOEH SANTOSA MOCH. YUNUS ANIS, S.ST VICTOR M. HATIGORAN, ST
Pembina Utama Muda (IV/c) NIP. 19700403 199003 1 007 NIP. 19800908 200909 1 001
NIP. 19590821 198603 1 021
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM
Jalan Ermasu Merauke 99613 Telp/Fax: (0971) 325559
KEGIATAN :
HARGA SATUAN DINAS PEKERJAAN UMUM
KABUPATEN MERAUKE
LOKASI :
TAHUN ANGGARAN :
2016
PERIODE
JANUARI - JUNI 2016
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM
Jalan Ermasu Merauke 99613 Telp/Fax: (0971) 325559
LOKASI :
TAHUN ANGGARAN :
2016
PERIODE
JANUARI - JUNI 2016
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM
Jalan Ermasu Merauke 99613 Telp/Fax: (0971) 325559
(HSBUP)
KEGIATAN :
HARGA SATUAN DINAS PEKERJAAN UMUM
KABUPATEN MERAUKE
LOKASI :
TAHUN ANGGARAN :
2016
PERIODE
JANUARI - JUNI 2016
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM
Jalan Ermasu Merauke 99613 Telp/Fax: (0971) 325559
(HSP)
KEGIATAN :
HARGA SATUAN DINAS PEKERJAAN UMUM
KABUPATEN MERAUKE
LOKASI :
TAHUN ANGGARAN :
2016
PERIODE
JANUARI - JUNI 2016