ECOPROJECTS
Production line of turnkey photovoltaic modules
INDEX
1 Basic assumptions 1
5 Company summary 5
Machine Translated by Google
Basic assumptions
Uptime 100 %
Yield 95 %
Wage /
Operational staff No. Operators Details (€)
Year (€)
Warehouse workers 4,800 2 Compressor 10,000
Safety 3,600 1
Factory 2000 m²
0%
1%
0% 0% 1% 1% Cells
60%
Silicone sealant
Ribbon 1.7mm
Ribbon 5mm
Adhesive
2 Glass m²
Production cost/Module 396 WATTS
1 Cells 72
Pcs 0.66 47.52 59.66
13 Ribbon 5mm
Kg 11.00 0.05 0.55 0.69
4%
0%
1%
Labor cost/year
Operational Staff Total cost for
line capacity
3 shifts /
(MW) Manager Operator Engineer Warehouse workers
year (millions €)
10 2 2
151 1 0.313
Commercial Manager Administrative Employees 2 Safety
1 1
Energy costs/year
line capacity Energy consumption Energy consumption / Cost / KWH Total costs
(MW) / kW year (€) (millions €)
151 225 1518750 0.8 1.22
Interest / Year
Interest on
Investment
Cost of machinery Auxiliary cost Line capital line capital
Line capacity total
(millions €) (millions €) (millions €)
(MW) (millions €)
TO b C=(A+B) (million €)
C+D
d
151 1.85 0.090 1.94 0.08 2.02
22%
0%
3%
Material cost
1% (millions €)
Cost of energy
74% (millions €)
Interests
(millions €)
Profit
(millions €)
Turnover
Sale Module /
Line capacity (MW) year
(millions €)
151 40.81
Profi neo
Summary
Cost Total
Material cost Cost of energy Interests Profit
Line capacity (MW) Labor Turnover
(millions €) (millions €) (millions €) (millions €)
(millions €) (millions €)
Summary
Million €