( MEI )

INTER ‐ DISCIPLINE CHECK (IDC)

Project Title: SOUTH SEMBAKUNG DEVELOPMENT IDC No: MEI‐JOBSMN‐TR‐0

Originator: KDY Date of Circulation: 11 Feb 22 Date to be return to DCC: 14 Feb 22

Document/Drawing No. Title/Description Current Rev. Status

SMN‐J‐PR‐00‐147 System and Sub‐System Identification and Numbering 1 AFC


Procedure
Note.

CIRCULATION LIST
Date
No Discipline Initial Title/Comment Sign
Target Actual
1. Project Manager AZ 14‐02‐22 Approval

2. Engineering Sect. Head AMW 14‐02‐22 Approval

3. Construction Sect. Head DPS

4. Project Control Sect. Head PR

5. Project Engineer LS

6. Process/Process Safety Engineer EHS/YS

7 Medco Reps IK/SS

8 Operation Medco NCY/ALH/YSF

9 Mechanical Engineer AY/YAN

10 Piping Engineer AY/BP

11. Pipeline Engineer AY/AS

12. Instrument Engineer FAP/DW

13. Electrical Engineer SAF/DW

14. Civil Engineer LS

15. Construction Engineer KRH

16. QA/QC Engineer HY/MRY/IMI

17. HSSE Engineer OS

18. Commissioning Engineer KDY 14‐02‐22 Owner

18. Project & Cost Control Engineer SP/AN/CAA

19. Contract Engineer CBO/RTH

20. Document Control ANH/ASA

The above document(s) have been reviewed and incorporate in the referenced document(s)/drawing(s) as appropriate

Final Review by: Approved by:

Kusdiyanta Akhmad Zamroni


Commmissioning Head Project Manager
File: Project Document Control: ANH / ASA
JOB PERTAMINA – MEDCO E&P SIMENGGARIS

PROJECT TITLE: SOUTH SEMBAKUNG DEVELOPMENT

DOCUMENT TITLE: System and Sub-System Identification and Numbering Procedure

DOCUMENT NO.: SMN-J-PR-00-147


Approved for Construction
JOB PERTAMINA MEDCO E&P SIMENGGARIS

South Sembakung Gas Plant Project

APPROVED

APPROVED WITH COMMENT


May proceed to next stage, resubmitcorrected documents for final approved

REVIEWED / COMMENTED
Resubmit corrected document for Approval

NOT APPROVED

RETAILED FOR INFORMATION ONLY

Originator eng. Commissioning Lead Project Manager

(...........................) ( Kusdiyanta ) (Akhmad Zamroni)

CONTRACTOR JOB P-MEPS


REV DATE DESCRIPTION
PREPARED CHECKED APPROVED APPROVED
X 9-Aug-2021 Intern Discipline Check EMT EMT/LDW DSL
A 12-Aug-2021 Issued for Review EMT EMT/LDW DSL
B 26-Nov-2021 Isued for Approval EMT EMT DSL
0 10-Jan-2022 Issued for Construction BTR EMT DSL
1 09-Feb-2022 Approved for Construction
BTR EMT DSL
UNAUTHORIZED COPYING OF THIS DOCUMENT IS NOT PERMITTED.

WO. No: REV.


JOB P-MEPS
3510006782 1
SIMENGGARIS BLOCK DISCIPLINE: Page
COMM Page 1 of 6
System and Sub-System Identification Doc. No.:
and Numbering Procedure SMN-J-PR-00-147

Revision : 1
SIMENGGARIS BLOCK
Date : 09 Feb 2022

COMMENT SHEET

Incorporated
Rev Section Page Comment (Y/N) Description

0 6 Ensure Subsystem number does not Y


change (different from the previous
one)
0 6 LLP Separator Subsystem number Y
double with Modification flash drum
0 6 Untuk setiap sub sytem mohon di N System & Sub-System List definition for
jabarkan ada discipline engineer apa discipline will be detailed out in ICAPS
saja di sana list that CTR used for monitoring all pre-
commissioning and commissioning
activity.

Doc. No: SMN-J-PR-00-147 Page 2 of 6


System and Sub-System Identification Doc. No.:
and Numbering Procedure SMN-J-PR-00-147

Revision : 1
SIMENGGARIS BLOCK
Date : 09 Feb 2022

TABLE OF CONTENTS

COMMENT SHEET ............................................................................................................................. 2

TABLE OF CONTENTS ...................................................................................................................... 3


1. INTRODUCTION ................................................................................................................................ 4
2. PURPOSE ............................................................................................................................................ 5
3. DEFINITION ......................................................................................................................................... 5
4. REFERENCE ...................................................................................................................................... 5
5. APPENDIX 1 ....................................................................................................................................... 5

Doc. No: SMN-J-PR-00-147 Page 3 of 6


System and Sub-System Identification Doc. No.:
and Numbering Procedure SMN-J-PR-00-147

Revision : 1
SIMENGGARIS BLOCK
Date : 09 Feb 2022

1. INTRODUCTION
JOB Pertamina - Medco E&P Simenggaris, hereafter known as COMPANY, is the operator
of South Sembakung Field located at Simenggaris Block, North Kalimantan. The South
Sembakung Field has a South Sembakung Gas Plant was designed to produce 30 MMscfd
gas for 20 years. Currently, there are 4 (four) wells which have been drilled; namely SSB-2 as
production well and three development wells namely SSB-4, SSB 5 and SSB-7, which are
currently under temporary suspension.
Based on the Gas Sales and Purchase Agreement (PJBG) to PT. PLN 8 MMSCFD and PT.
Kayan LNG 22 MMSCFD, the addition of 3 (three) development wells will be required, namely
SSB-8, SSB-9 and SSB-10.
COMPANY has initiated the new Project to accommodate produced gas from the new wells.
The project will consist of installation of : new wellsite facilities and its flowlines, LLP
production manifold and LLP production separator, new condensate handling system
(heater, tanks, pumps, custody meter and export line), new (future) compressor pac kage
during wells pressure depletion and other repair and modifications required.

Figure 1 – South Sembakung Field Location


PT. Meindo Elang Indah has been awarded the Engineering, Procurement, Construction,
Installation & Commissioning of South Sembakung Gas Development.

Doc. No: SMN-J-PR-00-147 Page 4 of 6


System and Sub-System Identification Doc. No.:
and Numbering Procedure SMN-J-PR-00-147

Revision : 1
SIMENGGARIS BLOCK
Date : 09 Feb 2022

2. PURPOSE

This document defines the breakdown of project facilities into System and Sub-System and will be used as
guidelines during the dossier preparation and work execution of Pre-Commissioning and Commissioning
activities covered in the Simenggaris Project

3. DEFINITION

SYSTEM major subdivision of an installation, being either process or utility, which performs a major
operational function of the plant. The system includes all the various equipments that
allows it to operate.

SUB-SYSTEM further subdivision of a system, which perform a partial operational function to the system,
with no or little interferrence with other sub-system.

4. REFERENCE

DOC NO TITLE
N/A SYSTEM AND SUB SYSTEM GUIDELINE
MEI CORPORATE

5. APPENDIX 1

 APPENDIX -1 SYSTEM AND SUB SYSTEM BREAKDOWN LIST

Doc. No: SMN-J-PR-00-147 Page 5 of 6


System and Sub-System Identification Doc. No.:
and Numbering Procedure SMN-J-PR-00-147

Revision : 1
SIMENGGARIS BLOCK
Date : 09 Feb 2022

SUB-
SITE SUB-
SYSTEM NAME SYSTEM SUB-SYSTEM UNIT DESCRIPTION
LOCATION SYSTEM
NUMBER
100402 Modification work on Wellhead SSB4

Subsea, Wellhead, Flowline


100403 Modification work on Wellhead SSB7
4
100404 Wellhead SSB8
and Manifold
100405 Wellhead SSB10
100501 Modification work on Flowline SSB2
00
100502 Modification work on Flowline SSB4
5 100503 Modification work on Flowline SSB7
100504 Flowline SSB8
100505 Flowline SSB10
6 100601 Modification work on Test / Production Manifold
110101 Modification on work HP Production Separator
110102 Modification on work LP Production Separator
1
Main Process

110103 Modification on work Flash Drum


110104 LLP Separator
10
110201 Modification work on Condensate Metering System
2 110202 Modification work on Sales Gas Metering 30 mmscfd
110203 Modification work on Sales Gas Metering 0.5 mmscfd
3 110300 LP Compressor System
5 110500 Modification work on Dehydration unit
120401 Modification work on Condensate Tank and Pump
Export and
byproduct

4
Handling

120402 Condensate Heater System


20
5 120500 Modification work on Produced water pond and pump
6 120600 Methanol Injection (portable)
1 130101 Modification work on Flare Header
1
Support
Process

130201 Modification work on Closed Drain and Open Drain Header


2
30 130202 Modification work on Closed Drain System
3 130300 Modification work on Open Drain System
5 130500 Modification work on Diesel tank and pump
140001 Fuel Gas Scrubber
Utility

0 140002 Modification work on Fuel Gas Filter


40
140003 Modification work on HP Discharge Scrubber
2 140200 Modification work on Instrument and Utility Air Distribution
150001 Modification work on Fire Water Main Ring and Foam
Guarding,Survelliance and

0
150002 Portable Fire Extinguisher
Communication
Control, Safe

1 150100 General Safety Equipment


50
150501 Modification work on F&G System

5 150502 Modification work on ESD System

150503 Modification work on PCS System


1 160100 Modification work on Panel LV-6
Electric
Energy

2 160200 Panel UPS Distribution


60
3 160300 Modification work on Earthing
5 160500 Modification work on Lighting
Architectural,
Marine and
Structural,

170201 Cathodic Protection


Civil

70 2
170202 Civil Works (Excavation / Landfill)

Doc. No: SMN-J-PR-00-147 Page 6 of 6