Hvac A2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

PROJECT:

ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER


HVAC LAYOUTS
DATE:14-07-2022
LIST OF DRAWINGS

S/N DRAWING/TITLE
TITLE

H101 LIST OF DRAWINGS

H102 HVAC GENERAL NOTES

H103 HVAC LEGENDS

PIPING LAYOUTS
H104 PIPING LAYOUT GROUND FLOOR

H105 PIPING LAYOUT FIRST FLOOR

H106 PIPING LAYOUT SECOND FLOOR

H107 PIPING LAYOUT MUMTY FLOOR

DUCTING LAYOUTS

H108 DUCTING LAYOUT GROUND FLOOR

H109 DUCTING LAYOUT FIRST FLOOR

H110 DUCTING LAYOUT SECOND FLOOR

H111 DUCTING LAYOUT MUMTY FLOOR

H112 FLOOR SUB ACP

H113 MCC HVAC

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER LIST OF DRAWINGS
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H101 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
HVAC GENERAL NOTES
THE FOLLOWING NOTES SHALL BE APPLICABLE FOR ALL HVAC DRAWINGS
S.NO. DESCRIPTION
01 SAD-ALL SUPPLY DIFFUSERS SHALL BE EQUAL TO TYPE AMS WITH NO. 7 (ALUMINIUM) OF T & B

02 RAD_ALL RETURN AIR DIFFUSERS SHALL BE EQUAL TO TYPE AMS WITH NO. 7 (ALUMINIUM) OF T & B
03 V.C.D_VOLUME CONTROL DAMPER.

04 F.D_FIRE DAMPER SHALL BE INSTALLED IN SUPPLY AIR DUCT.

05 ALL FRESH & EXHAUST AIR LOUVERS SHALL HAVE BRASS INSECT MESH 26g 20" MESH

06 DUCT SIZES SHOWN AS CLEAR INSIDE SIZES.

07 THE CONTRACTOR SHALL BE RESPONSIBLE FOR SHIFTING OF A/C UNITS FROM GROUND FLOOR TO THEIR RESPECTIVE LOCATION INCLUDING OWNER SUPPLIED EQUIPMENTS.

08 THE CONTRACTOR SHALL COORDINATE THE FIXING OF AIR DEVICES WITH OTHER CONTRACTORS AND WOULD ADJUST THE LOCATION OF AIR DEVICES WHEREVER REQUIRED

09 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONSTRUCTION OF EQUIPMENT FOUNDATION WHICH WILL BE MADE IN 1:2:4 R.C.C

10 THE CONTRACTOR SHALL CHECK THE SITE AND PREPARE THE SHOP DRAWING ACCORDING TO ACTUAL SITE CONDITIONS BEFORE COMMENCEMENT OF WORKS.

11 ALL SUPPLY AND RETURN AIR DUCTS SHALL BE INSULATED

12 INSPECTION HOLES SHALL BE PROVIDED IN AIR DUCTS.

13 THE DUCTS SHALL BE THOROUGHLY CLEANED BY WET CLOTH BEFORE ASSEMBLY / INSTALLATION
14 ALL DUCTS SHALL BE PAINTED AND NUMBERED.
15 EXPOSED INSULATED DUCT AND ALL INSULATED PIPES SHALL BE JACKETED BY 26 GAUGE G.I. SHEET.

16 THE SLAB OPENING SHALL BE 4" LARGER THAN THE DUCT SIZES MARKED ON THE DRAWING .
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUPPLY AND INSTALLATION OF M.C.C. AND ELECTRIC WIRING BETWEEN M.C.C AND EQUIPMENT. THE EMPLOYER SHALL
17 SUPPLY THE ELECTRIC SUPPLY POINTS AS SHOWN IN THE DRAWINGS.
18 WELDING SHALL BE DONE ONLY BY QUALIFIED WELDER AS PER SPECIFICATION.

19 ALL PIPING SHALL BE PROPERLY SUPPORTED ON CLAMS, HANGERS, ETC. THE SUPPORTS SHALL PERMIT FREE EXPANSION CONTRACTION.

20 ALL THE FLOOR SUPPORTS SHALL BE PROVIDED WITH SPRING TYPE VIBRATION ISOLATORS.

21 THE PIPING SHALL BE ASSEMBLED IN SUCH A MANNER THAT IT WILL AVOID THE UNDUE STRAIN.

22 THE PIPES SHALL BE PROPERLY INSTALLED TO SECURE EASY CIRCULATION AND PREVENT NOISE AND WATER HAMMER.

23 ALL ELBOWS SHALL BE LONG RADIUS TYPE.

24 THE VALVES SHALL OFF ECONOSTO OR APPROVED MAKE.


TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER HVAC GENERAL NOTES
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H102 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
HVAC LEGEND:
S.NO. SYMBOLS DESCRIPTION
01
CASSETTE TYPE UNIT

02 DUCTED UNIT

03 VRF Y JOINT

04 FRESH INTAKE LOUVERS

05 DIFFUSER

06 DIFFUSER (FRESH AIR)

07
RETURN AIR GRILLE

08 FRESH AIR DUCT

09 SUPPLY AIR DUCT

10 PVC PIPE

11 REFRIGERANT COPPER PIPE

12 CONDENSING UNIT

13 WALL MOUNTED UNIT

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER HVAC LEGEND
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H103 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
RAIN
WATER
UNDER GROUND MASTER MASTER TANK
DOMESTIC WATER TANK CC-02 TRAINERS FA-01
TRAINERS CC-02
1.0 TR 41.3 MM Ø REF.GAS
SIZE: 15' x 18' x 10' CU - 01
4.0 TR 1.0 TR
22.2 MM Ø REF.LIQUID
Ø 15.9mm CU-01 Slope CU - 01
CAP: 20,000 U.S GALLONS GF OUTDOOR REFRIGERANT PIPE
Ø 9.53mm MEETING
Ø3/4" TO & FROM ABOVE CHAIRMAN ROOM
OFFICE CC-03
Ø 12.7mm Slope 1.5 TR
Ø 6.35mm

Ø 12.7mm
Ø 6.35mm
CU - 02
Ø3/4"

Ø1-1/4"
CC-04 Ø 12.7mm
MASTER

Slope
MASTER 2.0 TR
Ø 28.6mm
Ø6.35mm
TRAINERS CU - 02 Ø3/4"
TRAINERS Slope Slope Ø 12.7mm
UNDER GROUND IT

Ø3/4"
Ø 28.6mm
Ø 22.2mm
Ø 12.7mm

Ø3/4" Ø 9.53mm Ø3/4" Ø 15.9mm


FIRE FIGHTING Ø 15.9mm
Slope Ø 6.35mm ROOM Ø 9.53mm
Slope Slope Slope Ø3/4" CC-03
WATER TANK CC-01 Slope
LARGE MEETING 1.5 TR

Ø3/4"
0.75 TR Ø3/4" ELECTRICAL Ø1" CU - 02
SIZE: 12' x 18' x 10' Ø3/4"

Ø1-1/4"
CU - 01 CLASS Ø 12.7mm ROOM

Slope
Ø 12.7mm Ø 28.6mm
CAP: 15,000 U.S GALLONS Ø 9.53mm CC-01 Ø 9.53mm Ø 9.53mm ROOM CC-01
Ø 15.9mm Ø6.35mm
PASSAGEWAY

Ø 25.4mm
Ø 6.35mm 0.75 TR Ø 6.35mm 0.75 TR ROOM Ø 12.7mm DC-01
CU - 01
CU - 01 2 TR 41.3 MM Ø REF.GAS
MASTER Ø 19.1mm CU-02 22.2 MM Ø REF.LIQUID
Ø1-1/4"
Ø 22.2mm
Ø 12.7mm

Ø 9.53mm WAITING GF OUTDOOR REFRIGERANT PIPE


TRAINERS DUCT
Slope

Ø 41.3mm
Ø 22.2mm Ø 41.3mm AREA Ø 31.8mm TO & FROM ABOVE
Ø 22.2mm VOID ABOVE Ø 15.9mm Ø 41.3mm

Ø1-1/4"
Ø 22.2mm

Slope
PUMP PUMP ROOM Slope STORE
CC-01 Slope Ø 15.9mm
ROOM 0.75 TR Ø3/4" Ø 41.3mm Ø 9.53mm KITCHEN
Ø3/4"
CU - 01 CC-01 Ø 22.2mm BATH Ø 12.7mm
0.75 TR MASTER Ø6.35mm
CU - 01 TRAINERS
Ø 9.53mm
CAFE
Ø1-1/4"

Ø 6.35mm LIFT A
MASTER P.A.
Slope

FD
FD MASTER DIRECTOR TOILET-5
TOILET-1 TRAINERS ROOM

Ø 34.9mm
Ø 19.1mm
Ø22.2mm
TRAINERS Ø22.2mm DC-04 DC-04 OFFICE DC-04
TOILET-6
Ø 12.7mm Ø 12.7mm Ø34.9mm Ø34.9mm 4 TR 4 TR 4 TR SP.
SP. TOILET-2 CU-01 CU-01 CC-03 CU-02
FEMALE Ø 9.53mm Ø 19.1mm Ø 19.1mm
LIFT B TOILET-3
TOILET-1
FD Ø 6.35mm
Ø 31.8mm Ø 15.9mm Ø 15.9mm 1.5 TR Ø 15.9mm DC-04 FD
TOILETS Slope Ø 15.9mm Slope Ø 9.53mm Ø 9.53mm CU - 02 Ø 9.53mm 4 TR
UP CU-02 FEMALE
CC-01
Ø3/4" Ø3/4" CC-01 TOILETS

Slope
0.75 TR

Ø1"
Ø 15.9mm

Slope

Slope
CU - 01 0.75 TR

Ø1"

Ø1"
Ø 9.53mm

Ø1-1/4"

Slope
CU - 01
UP

Slope

Ø1"
Ø 9.53mm
UP
Ø34.9mm Ø 31.8mm

Ø 22.2mm
Ø 12.7mm
Slope Ø 6.35mm Slope
Slope Ø 19.1mm Ø 15.9mm Ø 31.8mm Ø28.6mm Ø1-1/4"
SP. Ø 15.9mm Ø 15.9mm
SP.
Ø1-1/2" Ø1-1/4" Ø1-1/4" PASSAGEWAY FA-02
TOILET-2 FA-02 TOILET-4

Ø 28.6mm
Ø 15.9mm
Ø1-1/4"
8.0 TR
8.0 TR PASSAGEWAY PASSAGEWAY

Slope
VOID ABOVE CU-01 PASSAGEWAY PASSAGEWAY CU-02
PASSAGEWAY Slope VOID ABOVE
Ø1-1/2"

Ø25.4mm Ø22.2mm
Ø22.2mm Slope Slope
Slope

Ø 12.7mm Ø 12.7mm Ø22.2mm


Ø 12.7mm Ø 12.7mm
PASSAGEWAY Ø1-1/4" Ø1-1/4" Ø1-1/4"

Slope

Slope
SHARED
Ø1-1/4"

Ø1"

Ø1"
CC-01

Slope
Ø 15.9mm

Ø1"
Slope

TEAM 0.75 TR
OFFICE Ø 9.53mm
Slope
CC-01 CU - 01 Ø 15.9mm
FD
TEAM ØØ 9.53mm
6.35mm
Ø22.2mm LEADER 0.75 TR Slope Ø 9.53mm MALE
Ø1-1/2"
Ø 12.7mm CU - 01
LEADER Slope Ø3/4" PASSAGEWAY TOILETS
MALE

ELECTRICAL D.B
FD
Slope Slope CC-01
Ø3/4" DC-03 DC-03 JANITORS
JANITORS TOILETS 0.75 TR
SHARED
Ø 9.53mm ACP GROUND FLOOR
DC-03 3 TR 3 TR TOILET-7
Ø3/4" Ø3/4" CU - 01 PASSAGEWAY Ø 9.53mm Ø 6.35mm CU-02 ROOM

PASSAGEWAY
ROOM TOILET-4 TOILET-3 CC-01
OFFICE 3 TR CU-02

Ø 28.6mm
Ø 12.7mm
Ø 6.35mm
FD
0.75 TR Ø22.2mm Ø 19.1mm Ø 9.53mm VOID ABOVE CC-01
CU-02
FD
TOILET-8
CU - 01 Ø 12.7mm Ø 6.35mm Ø 9.53mm VOID ABOVE
PASSAGEWAY

Ø 9.53mm
Ø 6.35mm Slope
0.75 TR PASSAGEWAY
CU - 01 Ø 15.9mm
Ø1-1/4"

TEAM Slope SHARED Ø 9.53mm


LIBRARY
Slope

Ø1-1/2" Condensate Drain Ø 15.9mm Ø3/4" VOID ABOVE Ø1-1/2" Condensate Drain
Pipe Connect with Floor LEADER Ø 9.53mm Ø 9.53mm Ø3/4" OFFICE CONFERENCE Pipe Connect with Floor
Slope CC-01 Drain with P-Trap
Drain with P-Trap Ø 6.35mm
Ø 9.53mm

Slope
SHARED 0.75 TR

Ø1"
CC-01 Slope
Ø3/4" OFFICE CU - 01 Ø1-1/4" Ø 6.35mm

Slope
0.75 TR DC-01

Ø 28.6mm
Ø 12.7mm
CU - 01 Ø3/4" 2 TR CC-01 Ø 15.9mm
CU-01 Ø 9.53mm
Ø 15.9mm
Ø 12.7mm DC-03 0.75 TR Ø 9.53mm
Ø 9.53mm Ø 6.35mm
Ø 9.53mm 3 TR CU - 01
Slope CU-01 Slope SHARED
Slope

MEETING Ø3/4"
Ø1"

DC-03
Ø3/4" OFFICE 3 TR
ROOM CC-01 Ø 9.53mm
CU-02
DC-04 SHARED 0.75 TR Ø 15.9mm Ø 6.35mm Ø 19.1mm
4 TR CU - 01 Ø 9.53mm OUTDOOR
CU-01
OFFICE Ø 9.53mm
Ø 15.9mm
Ø 9.53mm
Ø22.2mm SPACE
Ø 12.7mm
Ø 15.9mm
Ø 9.53mm
FACULTY
LOUNGE
OUTDOOR Slope OUTDOOR
SHARED SPACE DN DN
SPACE Ø1"
DESK
SPACE
DC-03
3 TR
CU-01

DN

GROUND FLOOR
PIPING LAYOUTS PLAN

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER PIPING LAYOUT OF GROUND FLOOR
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H104 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
PREPARATION
KITCHEN STORAGE

GD6 GD6 GD6


38.1 MM Ø REF.GAS TERRACE
19.1 MM Ø REF.LIQUID
FF OUTDOOR REFRIGERANT PIPE
TO & FROM ABOVE 38.1 MM Ø REF.GAS
TERRACE 19.1 MM Ø REF.LIQUID
FF OUTDOOR REFRIGERANT PIPE
LAB-3 TO & FROM ABOVE

VOID ABOVE
VOID ABOVE TERRACE
Ø1-1/2" Condensate Drain
LAB-1
Pipe Connect with Floor
Drain with P-Trap Ø1-1/4" Condensate Drain

Ø 38.1mm
Ø 19.1mm
Pipe Connect with Floor
Ø 38.1mm
Ø 19.1mm

Drain with P-Trap


TRAINING
FD FD

SP. TOILET-9 TOILET-10 DC-03 TRAINING DC-02 TOILET-13


DC-02
TOILET-5 2.5 TR
DC-02
2.5 TR
DC-03
3 TR
D2 3 TR
DC-02
2.5 TR
DC-02
2.5 TR 2.5 TR
FEMALE TOILET-14 SP.
FD
CU-03 CU-03 CU-03 CU-03 VOID ABOVE CU-04 Ø 15.9mm CU-04 CU-04
TOILETS TOILET-7FD
FEMALE Ø 15.9mm
Ø 15.9mm Ø 15.9mm Room Ø 9.53mm DC-02
Ø 9.53mm
D4 D4 TOILETS
Ø 9.53mm Ø 9.53mm 2.5 TR
D4 D4
Ø1-1/2"

Ø 15.9mm
Ø 9.53mm
CU-04
D9 D2

Slope
D2

Slope
Ø 15.9mm
Slope

Ø 15.9mm
Slope

Slope

Ø 15.9mm

Ø1"
Ø 28.6mm

Ø1"
Ø1"

Ø1"

Ø 9.53mm Ø 9.53mm
Ø34.9mm
Ø 19.1mm
D9
Ø 12.7mm
UP Ø 9.53mm

D2
Ø 28.6mm
UP Ø 28.6mm
D8 Ø 22.2mm
D8
Ø 31.8mm
D8 Ø 31.8mm Ø 28.6mm
D8

Slope
Ø 15.9mm Ø 12.7mm Ø 22.2mm Ø 12.7mm Ø 15.9mm Ø 15.9mm Ø 15.9mm

Ø1"
Ø 28.6mm Ø 31.8mm Ø 22.2mm
FA-02 Ø 28.6mm Ø 12.7mm
Ø 15.9mm Ø 12.7mm FA-02
SP. 8.0 TR Ø 15.9mm Ø 15.9mm
PASSAGEWAY PASSAGEWAY PASSAGEWAY VOID ABOVE

Slope

Slope
Ø22.2mm 8.0 TR
Slope SP.

Slope
Ø1"

Ø1"
CU-03 PASSAGEWAY Ø 15.9mmPASSAGEWAY
VOID ABOVETOILET-6
Ø 12.7mm CU-04

Ø1"
Ø1-1/4" PASSAGEWAY Ø 15.9mm Ø 9.53mm
D2 TOILET-8
Slope Slope Slope Ø 9.53mm Slope Slope D8 Slope Slope Slope Slope
D9 D8 D8 D8Ø1-1/4" Ø22.2mm
D2 D2ØØ22.2mm Ø1-1/4" Ø 15.9mm Ø1-1/4" Ø1-1/4" Ø1-1/4" Ø1'' Ø1-1/4" Ø1-1/4" Ø1-1/4" Ø 12.7mm D2

Ø1"

Ø1"

Ø1"
Slope
Ø1"

12.7mm Ø 15.9mm
Ø 9.53mm
D9 Ø 9.53mm Ø1'' Ø1''
MALE Ø 15.9mm Ø 15.9mm MALE
D2 Ø 9.53mm
Ø 15.9mm Ø 9.53mm
TOILETS Ø 15.9mm Ø 9.53mm TOILETS
D4 D4 D4 Ø 9.53mm PASSAGEWAY D4 D4 D4

ELECTRICAL D.B
FD DC-03 DC-03 DC-03 DC-02 DC-02 DC-02 DC-02 FD

TOILET-12 Room 3 TR 3 TR 3 TR DC-03 Room ACP FIRST FLOOR 2.5 TR 2.5 TR 2.5 TR 2.5 TR
JANITORS
CU-03 CU-03 CU-03 3 TR CU-04 CU-04 CU-04 CU-04 TOILET-16
TOILET-11 VOID ABOVE CU-03 VOID ABOVE TOILET-15 ROOM
FD FD

TRAINING
TRAINING
VOID ABOVE

JANITORS
ROOM

LAB-2+(PREPARATION)
LAB-4+(PREPARATION)

TERRACE

TERRACE

FIRST FLOOR
PIPING LAYOUTS PLAN

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER PIPING LAYOUT OF FIRST FLOOR
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H105 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
TERRACE TERRACE

34.9 MM Ø REF.GAS
19.1 MM Ø REF.LIQUID
SF OUTDOOR REFRIGERANT PIPE
TO & FROM ABOVE 34.9 MM Ø REF.GAS
19.1 MM Ø REF.LIQUID
SF OUTDOOR REFRIGERANT PIPE
TO & FROM ABOVE
TO BALCONY'S

Ø3 4"
Ø 28.6mm FLOOR TRAP Ø3 4"

Ø 15.9mm
Ø22.2mm
Ø34.9mm
Ø 19.1mm
TERRACE
BEDROOM BEDROOM Ø 12.7mm
BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM
WM-01 WM-01 WM-01 WM-01 D3 Ø34.9mm WM-01 WM-01

Ø6.35mm
Ø 12.7mm
1.5 TR 1.5 TR 1.5 TR 1.5 TR Ø 19.1mm WM-01
Ø6.35mm
Ø 12.7mm

1.5 TR 1.5 TR
CU - 05 CU - 05 Ø 12.7mm CU - 05 Ø 12.7mm CU - 05 1.5 TR
WM-02 Ø 12.7mm CU - 06 CU - 06
Ø6.35mm Ø6.35mm 2.0 TR CU - 06
Ø 12.7mm Ø6.35mm
CU - 06
Ø6.35mm
Ø3 4" VOID ABOVE FD COMMON
TOILET TOILET CLEAN
ROOM TOILET TOILET

Ø 15.9mm
Ø 9.53mm
Ø3 4" Ø3 4"
STORAGE KITCHEN TOILET
Ø3 4" Ø3 4"
ROOM Ø3 4"
Ø3 4"
Ø 28.6mm
Ø 12.7mm

TOILET TOILET Ø34.9mm


Ø 19.1mm Ø 19.1mm
Ø 9.53mm
FD FD FD
FD
UP FD
UP FD FD

Ø11 4"
Ø 15.9mm
Ø11 4"

Ø 19.1mm
Ø 9.53mm
Ø 9.53mm
TERRACE PASSAGEWAY PASSAGEWAY TERRACE
PASSAGEWAY PASSAGEWAY PASSAGEWAY PASSAGEWAY FA-02
Ø 19.1mm Ø 19.1mm 8.0 TR
FA-02 Ø 28.6mm Ø 9.53mm Ø22.2mm
Ø22.2mm Ø 9.53mm CU-06
8.0 TR Ø 15.9mm
CU-05 Ø 12.7mm PASSAGEWAY Ø 31.8mm Ø 28.6mm Ø 12.7mm
Ø 15.9mm Ø 12.7mm

Ø 19.1mm
Ø 9.53mm
FD Ø 19.1mm FD FD FD FD
Ø 9.53mm

Ø 19.1mm
Ø 9.53mm
FD FD FD FD
Ø22.2mm FD
Ø 19.1mm
Ø 9.53mm

Ø 12.7mm
TOILET FD
Ø3 4"

ELECTRICAL D.B
TOILET TOILET TOILET MALE TOILET
ACP SECOND FLOOR
Ø3 4" TOILET TOILET
TOILET TOILET FEMALE Ø3 4" Ø3 4"
Ø3 4"
Ø3 4"
BATH LAUNDARY Ø3 4"
Ø3 4" Ø 12.7mm
Ø3 4" Ø3 4" LAUNDARY WM-01 Ø6.35mm
1.5 TR Ø 12.7mm
CU - 06 Ø 15.9mm
Ø 12.7mm WM-01 Ø 12.7mm Ø6.35mm Ø 9.53mm Ø 12.7mm
Ø6.35mm WM-01
Ø 12.7mm BALCONY Ø12.7mm Ø 15.9mm
Ø 9.53mm
Ø 12.7mm
Ø6.35mm Ø6.35mm Ø6.35mm
Ø6.35mm 1.5 TR
1.5 TR CU - 05
Ø6.35mm WM-01 WM-02 VOID ABOVE WM-01 BALCONY
CU - 05 VOID ABOVE 1.5 TR 2.0 TR FEMALE BEDROOM WM-01
1.5 TR MALE
WM-02 WM-01 WM-01
1.5 TR 2.0 TR
CU - 05 CU - 05
SUITE BEDROOM BEDROOM CU - 06 VOID ABOVE CU - 06
1.5 TR 1.5 TR
CU - 06 SUITE CU - 06 BEDROOM CU - 06
BEDROOM BEDROOM BEDROOM BEDROOM

Note=
TERRACE All Condensate Drain Points Should
TERRACE be Guided to Shower Booth.

SECOND FLOOR
PIPING LAYOUTS PLAN

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER PIPING LAYOUT OF SECOND FLOOR
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H106 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
41.3 MM Ø REF.GAS
22.2 MM Ø REF.LIQUID
GROUND FLOOR OUTDOOR REFRIGERANT PIPE
TO & FROM BELOW 41.3 MM Ø REF.GAS
22.2 MM Ø REF.LIQUID
38.1 MM Ø REF.GAS
19.1 MM Ø REF.LIQUID
OHWTs GROUND FLOOR OUTDOOR REFRIGERANT PIPE
FIRST FLOOR OUTDOOR REFRIGERANT PIPE TO & FROM BELOW
34.9 MM Ø REF.GAS
TO & FROM BELOW 38.1 MM Ø REF.GAS
19.1 MM Ø REF.LIQUID
SECOND FLOOR OUTDOOR REFRIGERANT PIPE 19.1 MM Ø REF.LIQUID
TO & FROM BELOW FIRST FLOOR OUTDOOR REFRIGERANT PIPE 34.9 MM Ø REF.GAS
TO & FROM BELOW 19.1 MM Ø REF.LIQUID
SECOND FLOOR OUTDOOR REFRIGERANT PIPE
OUTDOOR GROUND FLOOR (L-S) OUTDOOR GROUND FLOOR (R-S) TO & FROM BELOW

SL
SL VRF-CU 01-50HP VRF-CU 02-50HP GF
OP

O
POWER SUPPLY 44.8KW POWER SUPPLY 38KW

PE
E GF 36.5 TR
(1 3-PHASE/400-V/50-HZ 3-PHASE/400-V/50-HZ CU-02

(1
46 TR
:5OPERATING

:50
0) WEIGHT 1000KG CU-01 OPERATING WEIGHT 700KG

)
1F
31 TR 1F
OUTDOOR FIRST FLOOR (L-S) CU-03 OUTDOOR FIRST FLOOR (R-S) 28 TR
CU-04
VRF-CU 03-50HP VRF-CU 04-50HP
POWER SUPPLY 32KW POWER SUPPLY 28KW
3-PHASE/400-V/50-HZ 3-PHASE/400-V/50-HZ
OPERATING WEIGHT 600KG OPERATING WEIGHT 490KG
2F 2F
20.5 TR 24 TR
CU-05 CU-06

Room
OUTDOOR SECOND FLOOR (L-S) MCC HVAC
D3 OUTDOOR SECOND FLOOR (R-S)
VRF-CU 05-50HP VRF-CU 06-50HP
POWER SUPPLY 20KW POWER SUPPLY 23KW
3-PHASE/400-V/50-HZ 3-PHASE/400-V/50-HZ
OPERATING WEIGHT 350KG OPERATING WEIGHT 470KG D3

Roof
Top
)
:50

)
:50
(1

(1
E

PE
OP

O
SL
SL

MUMTY FLOOR
PIPING LAYOUTS PLAN

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER PIPING LAYOUT OF ROOF TOP
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H107 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
FRESH AIR
INTAKE LOUVER WITH
DAMPER
24X20
RAIN
WATER
UNDER GROUND MASTER MASTER TANK
DOMESTIC WATER TANK TRAINERS TRAINERS 12"X12" SAD 12"X12" SAD
SIZE: 15' x 18' x 10' 4 @300 CFM 4 @300 CFM
CAP: 20,000 U.S GALLONS

16" X 12"
MEETING
CHAIRMAN ROOM
OFFICE

14" X 6"

14" X 6"
MASTER
MASTER
TRAINERS
TRAINERS
UNDER GROUND
16" X 10"

IT
FIRE FIGHTING ROOM 12"X12" SAD 12"X12" SAD
WATER TANK 4 @300 CFM 4 @300 CFM
MEETING

14" X 6"
ELECTRICAL LARGE

14" X 6"
SIZE: 12' x 18' x 10'

14" X 8"

14" X 8"
CLASS ROOM
CAP: 15,000 U.S GALLONS ROOM 14" X 6"
PASSAGEWAY

ROOM
14" X 8"
MASTER
WAITING

600 CFM
TRAINERS DUCT

18"x18"

RAG
AREA
VOID ABOVE
14" X 8"

PUMP PUMP ROOM

16" X 10"
STORE

16" X 10"
16" X 10"

16" X 10"
ROOM KITCHEN

14" X 6"
MASTER BATH
14" X 6"
TRAINERS CAFE
LIFT A
MASTER MASTER DIRECTOR P.A.
TOILET-5
14" X 6"

16" X 12"
16" X 12"

16" X 12"

16" X 12"
TOILET-1 TRAINERS TRAINERS OFFICE 12"X12" SADROOM TOILET-6 SP.
SP. 2 @300 CFM
TOILET-2 FEMALE LIFT B TOILET-3
TOILET-1
TOILETS
UP FEMALE
RAG RAG
12"X12" SAD
RAG
1200 CFM
RAG
1200 CFM
TOILETS
1200 CFM 1200 CFM
4 @300 CFM 36"x18" 36"x18" 36"x18"
36"x18"
UP
UP
SP. SP.
PASSAGEWAY TOILET-4 FRESH AIR
TOILET-2 20" X 16" 14" X 6" 14" X 8" 14" X 10" 18" X 16" 20" X 16"
20" X 16" PASSAGEWAY 16" X 12" 14" X 10" 14" X 8"
PASSAGEWAY
16" X 12" 18" X 14" PASSAGEWAY 20" X 16" INTAKE LOUVER
VOID ABOVE PASSAGEWAY 12"X12" SAD 12"X12" SAD PASSAGEWAY VOID ABOVE WITH DAMPER

14" X 8"
12"X12" SAD
6 @400 CFM 4 @225 CFM 6 @400 CFM 36X30
FRESH AIR
PASSAGEWAY
14" X 10"

RAG RAG
INTAKE LOUVER SHARED 900 CFM
WITH DAMPER TEAM OFFICE 30"x16"
900 CFM
30"x16"
36X30 TEAM LEADER 12"X12" SAD MALE
LEADER 3 @300 CFM PASSAGEWAY TOILETS
MALE
JANITORS

16" X 10"

16" X 10"
JANITORS TOILETS SHARED TOILET-7
PASSAGEWAY ROOM

PASSAGEWAY
ROOM TOILET-4 TOILET-3 OFFICE 16" X 10" 14" X 8" 14" X 6"
VOID ABOVE TOILET-8
VOID ABOVE

900 CFM
PASSAGEWAY

30"x16"
PASSAGEWAY

16" X 8"

RAG
RAG
14" X 8"

TEAM 600 CFM SHARED VOID ABOVE LIBRARY 14" X 6"


18"x18"
LEADER OFFICE CONFERENCE
SHARED

14" X 8"
14" X 8"

OFFICE
16" X 10"

12"X12" SAD
3 @300 CFM
SHARED

14" X 6"
RAG
MEETING OFFICE
ROOM 16" X 10" 14" X 8" 14" X 6"
14" X 6"

*Actual CFM should be specified by the manufacturer. 1200 CFM 12"X12" SAD
36"x18" SHARED 3 @300 CFM
OFFICE OUTDOOR

900 CFM
30"x16"
RAG
RAG
900 CFM
SPACE 14" X 6"
12"X12" SAD
16" X 12"

30"x16" 12"X12" SAD


12"X12" SAD 3 @300 CFM 3 @300 CFM
900 CFM
30"x16"

FACULTY 2 @300 CFM


RAG

LOUNGE
OUTDOOR OUTDOOR
14" X 10"

14" X 6" 14" X 8" 16" X 10"


SHARED SPACE DN DN
SPACE
DESK
14" X 8" SPACE

12"X12" SAD
3 @400 CFM

DN

GROUND FLOOR
DUCTING LAYOUTS PLAN

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER DUCTING LAYOUT OF GROUND FLOOR
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H108 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
PREPARATION
KITCHEN STORAGE

12"X12" SAD 12"X12" SAD


12"X12"GD6 GD6
12"X12" SAD GD6 3 @300 CFM 3 @300 CFM

14" X 6"

14" X 6"
SAD
3 @250 CFM 3 @250 CFM TERRACE
14" X 6"

14" X 6"
TERRACE

LAB-3

14" X 8"
14" X 8"
VOID ABOVE
12"X12" SAD VOID ABOVE 12"X12" SAD TERRACE
14" X 8"
14" X 8"

LAB-1 14" X 6"


3 @250 CFM 14" X 6" 3 @250 CFM

14" X 8"
14" X 8"
12"X12" SAD 12"X12" SAD

14" X 6"
14" X 6"
3 @250 CFM 3 @250 CFM

TRAINING

16" X 10"
TOILET-9 TOILET-10 TRAINING14" X 6" 14" X 6" TOILET-13
14" X 10"

14" X 10"
16" X 10"
14" X 10"

14" X 10"
SP.

14" X 10"
14" X 10"
TOILET-5
D2 FEMALE TOILET-14 SP.
VOID ABOVE TOILETS TOILET-7
FEMALE Room
D4 D4 TOILETS RAG D4 D4
RAG RAG
D2
RAG
750 CFM
RAG
750 CFM
RAG
900 CFM
D9 RAG 750 CFM
RAG
750 CFM 750 CFM 750 CFM D2
20"x20"
20"x20"
D9
20"x20" 30"x16" 900 CFM
30"x16"
20"x20" 20"x20"
UP 20"x20"

D2
UP D8 D8 D8 D8
SP. 20" X 16" 20" X 16" 18" X 16" 18" X 14" PASSAGEWAY16" X 12" 14" X 10" PASSAGEWAY 14" X 8" 14" X 8" 14" X 10" 16" X 12" PASSAGEWAY 18" X 14" 18" X 16" 20" X 16" VOID ABOVE FRESH AIR
PASSAGEWAY PASSAGEWAY SP. 20" X 16"
TOILET-6 INTAKE LOUVER
VOID ABOVE PASSAGEWAY 12"X12" SAD 12"X12" SAD
D2 TOILET-8
FRESH AIR D9 6 @400 CFM 6 @400 CFMD8 D8 D8 D8 WITH DAMPER

INTAKE LOUVER
D2 D2 RAG RAG RAG
RAG
900 CFM RAG RAG RAG RAG D2 36X30

WITH DAMPER MALE


900 CFM 900 CFM 900 CFM
D9 30"x16" 750 CFM 750 CFM 750 CFM 750 CFM
MALE
36X30 D2
30"x16" 30"x16" 30"x16" 20"x20" 20"x20" 20"x20" 20"x20"
TOILETS TOILETS
D4 D4 D4 PASSAGEWAY D4 D4 D4

14" X 10"
16" X 10"

14" X 10"
16" X 10"
16" X 10"

14" X 10"

14" X 10"
16" X 10"
TOILET-12 Room Room JANITORS
TOILET-16
TOILET-11 VOID ABOVE 14" X 6" VOID ABOVE 14" X 6" TOILET-15 ROOM

TRAINING

14" X 6"
TRAINING

14" X 8"
14" X 8"

14" X 6"
VOID ABOVE
12"X12" SAD 12"X12" SAD
3 @250 CFM 3 @250 CFM
JANITORS 12"X12" SAD 12"X12" SAD
14" X 6" 14" X 6"
14" X 8"

14" X 8"

ROOM

14" X 8"
14" X 8"

3 @250 CFM 3 @250 CFM

*Actual CFM should be specified by the manufacturer. LAB-2+(PREPARATION)


LAB-4+(PREPARATION)

TERRACE
14" X 6"

TERRACE
14" X 6"
14" X 6"

14" X 6"

12"X12" SAD 12"X12" SAD 12"X12" SAD 12"X12" SAD


3 @300 CFM 3 @300 CFM 3 @300 CFM 3 @300 CFM

FIRST FLOOR
DUCTING LAYOUTS PLAN

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER DUCTING LAYOUT OF FIRST FLOOR
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H109 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
TERRACE TERRACE

TERRACE
BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM
D3

VOID ABOVE COMMON


TOILET TOILET CLEAN
STORAGE ROOM TOILET TOILET
KITCHEN TOILET
ROOM
TOILET TOILET

UP UP
TERRACE PASSAGEWAY PASSAGEWAY TERRACE
20" X 16" PASSAGEWAY
18" X 16" 18" X 14" 16" X 12" 14" X 10" PASSAGEWAY 14" X 8" 14" X 8" PASSAGEWAY14" X 10" 16" X 12" 18" X 14" PASSAGEWAY
18" X 16" 20" X 16" FRESH AIR
12"X12" SAD 12"X12" SAD INTAKE LOUVER
6 @400 CFM PASSAGEWAY 6 @400 CFM WITH DAMPER
FRESH AIR 36X30
INTAKE LOUVER
WITH DAMPER
36X30
TOILET
TOILET TOILET TOILET MALE TOILET
TOILET TOILET
TOILET TOILET FEMALE BATH LAUNDARY
LAUNDARY

BALCONY
VOID ABOVE BALCONY
VOID ABOVE FEMALE BEDROOM MALE
SUITE BEDROOM BEDROOM VOID ABOVE
SUITE BEDROOM
*Actual CFM should be specified by the manufacturer. BEDROOM BEDROOM BEDROOM BEDROOM

TERRACE

TERRACE

SECOND FLOOR
DUCTING LAYOUTS PLAN

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER DUCTING LAYOUT OF SECOND FLOOR
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H110 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
OHWTs

SL
SL
OP

OP
E

E
(1

(1
:50

:50
)

)
Room
D3

D3

Roof
Top
)
:50

)
:50
(1

(1
E

PE
OP

O
SL
SL

MUMTY FLOOR
DUCTING LAYOUTS PLAN

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER DUCTING LAYOUT OF ROOF TOP
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H111 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
4c 10mm² PVC / PVC Single Core Each Phase
ACP G.FLOOR & Neutral 1x 10mm² PVC/PVC ECC
CONNECTED LOAD 6KW
40A
TP MCCB
RC=10KA

10A
SP MCB
RC=10KA

x 42

AC INDOOR

4c 10mm² PVC / PVC Single Core Each Phase 4c 10mm² PVC / PVC Single Core Each Phase
ACP F.FLOOR & Neutral 1x 10mm² PVC/PVC ECC ACP S.FLOOR & Neutral 1x 10mm² PVC/PVC ECC
CONNECTED LOAD 4.5KW CONNECTED LOAD 2KW
40A 40A
TP MCCB TP MCCB
RC=10KA RC=10KA

10A 10A
SP MCB SP MCB
RC=10KA RC=10KA

x 24 x 24

AC INDOOR AC INDOOR

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER SUB FLOOR ACP
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H112 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB
MCC-HVAC
4c 240mm² Cu/PVC / PVC FROM MDB
1x 70mm² PVC/PVC ECC

400A (ADJ)
TP MCCB
RC=36KA

40A 100A 60A 40A 100A


TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB
RC=10KA RC=18KA RC=18KA RC=18KA RC=18KA

GF-ACP CU-01 CU-05 SPARE SPARE


FF-ACP CU-02 CU-06 (02 Nos.)
SF-ACP CU-03
CU-04

TITLE:
PROJECT NAME: ESTABLISHMENT OF PAK-KOREA NUTRITION CENTER HVAC MCC PANEL
APPROVED BY : KOICA
SHEET NUMBER : TYPE OF DRAWING: ISSUED FOR: SCALE : DATE:
H113 MEP CONSTRUCTION N.T.S JULY 14TH ,2022 DESIGNED BY : ABDULLAH
CHECKED BY : MR . AFTAB

You might also like