PROJECT:

LOCATION:
SPECIFICATION , BILL OF QUANTITY & PRICE
Contract Total Contract
Item No. Description Unit Rate
Qty Amount
A. SUB STRUCTURE
1.Excavation & Earth work
Clear of site to a depth of 20 cm and grub debris and grabbed
1.11 materials from site.
m2 435.22 21.13 9,197.84
Bulk excavation in ordinary soil not exceeding 150cm from NGL
1.12
m3 683.84 67.79 46,357.97
1.13 Ditto over 150cm but not exceding 300cm m 3
683.84 83.10 56,823.82
1.14 Ditto , over 300cm but not exceeding 400cm m3 435.22 100.62 43,791.15
Trench excavation in ordinary soil to a depth not exceeding 100cm
1.15 from reduced ground level
m3 45.00 167.61 7,542.32
Fill 100cm below mat foundation to maintain the desired level (see
soil test report attached) with imported selected material from out of
1.16 the site and compacted in layers not exceeding 20cm

m3 435.22 413.70 180,048.56


Fill above Hardcore to maintain the desired level with imported
selected material from out of the site and compacted in layers not
1.17
exceeding 20cm
m3 1,150.00 413.70 475,750.63
Fill around the building to maintain the desired level with selected
non-expansive material from site and compact in layers not
1.18
exceeding 20cm
m3 150.00 123.35 18,501.81
Cart away excavated materials per the instruction of the engineer .up
1.19 to 10km.
m3 1,739.94 60.82 105,818.06
250mm thick sound stone hard core finished, blinded and crushed.
1.20
m2 357.00 246.74 88,085.47
Total carried to summary 0 1,031,917.63
2.CONCRETE WORK -
50mm thick lean concrete in concrete class C-5, with minimum
2.11 cement content of 150kg/m3 under :
-
a) Grade Beam m2 98.43 105.08 10,342.90
b) Mat Beam m2 100.21 105.08 10,529.81
b) Ground floor Slab m2 340.20 105.08 35,747.88
c) Mat Slab m2 357.00 105.08 37,513.20
Reinforced concrete in concrete class C-25 with minimum cement
content of 360Kg/M3 cast into form work and vibrated around road
2.12 reinforcement. Form work and steel measured separately.

- -
a) Grade Beam m3 17.85 2,601.78 46,441.81
b) Mat Beam m3 55.65 2,601.78 144,789.17
c) Foundation Column m3 9.84 2,727.72 26,840.80
d) Shear wall m2 9.45 2,727.72 25,776.99
e) In 10 cm thick ground floor RC slab m2 378.00 260.18 98,347.36
2.13 10 cm thick styrafoam expansion joint ml 426.00 26.76 11,400.78
Reinforced concrete in concrete class C-30 with minimum cement
content of 420Kg/M3 cast into form work and vibrated around road
2.14 reinforcement. Form work and steel measured separately.

- -
` a)Mat slab m3 94.50 2,732.62 258,232.63
2.14 Provide cut and fix sawn zigba wood form work to:- - -
a) Grade Beam m2 221.55 301.94 66,894.45
b)Mat Beam m2 225.75 301.94 68,162.59
c) Ground floor Slab m2 422.64 301.94 127,611.25
d) Mat slab m2 465.18 301.94 140,455.70
e) Foundation Column m2 45.15 301.94 13,632.52

boq,spec price
PROJECT:
LOCATION:
SPECIFICATION , BILL OF QUANTITY & PRICE
Contract Total Contract
Item No. Description Unit Rate
Qty Amount
f) Shear wall m2 43.05 301.94 12,998.45
2.15 Steel reinforcement, price shall including cutting bending tying with - -
wire and
a) dim placing
6mm planeinbar
position. Kg - -
b)dim 8mm deformed bar Kg 4,539.97 49.10 222,911.67
c)dim 10mm deformed bar Kg 1,554.11 49.35 76,691.77
d)dim 12mm deformed bar Kg 2,017.73 47.34 95,522.68
e)dim 14mm deformed bar Kg 4142.3445 47.65 197,376.09
f)dim 16mm deformed bar Kg 3,487.14 47.15 164,428.51
g)dim 20mm deformed bar Kg 5,148.71 40.57 208,874.78
Total carried to summary 0 2,101,523.80
3.MASONRY WORK
-
50 cm thick basaltic or equivalent type stone masonry bedded
3.10 in cement mortar(1:3) mix below ground surface. Price shall
include cement mortar bed.
m3 60.00 1,524.95 91,496.96
50 cm thick basaltic or equivalent type stone masonry bedded in
cement mortar(1:3) mix above ground surface. Price shall
3.20 include cement mortar bed & pointing exposed face of
masonry.roughly dressed one side
m3 45.00 1,675.43 75,394.57
Total carried to summary 0 166,891.53
B. SUPER STRUCTURE -
B. SUPER STRUCTURE -
1.CONCRETE WORK -
Reinforced concrete in C-25 with minimum cement content of
360Kg./m3, filled and vibrated into formwork and around
reinforcement bar.
-
1.11 In elevation column m3 50.00 2,853.29 142,664.36
1.12 In suspended floor beam and ramp beam,landing beam m3 140.00 2,709.02 379,262.86
1.13 In stair case and landings m3 27.45 2,709.02 74,362.61
1.14 In shear wall m3 43.60 2,853.29 124,403.32
1.15 To 15cm thick floor slab m3 275.00 2,709.02 744,980.61
1.16 To Ramp slab m3 14.00 2,709.02 37,926.29
Supply cut and fix in position zigba wood or equivalent
formwork.
- 0.00
1.16 To elevation column m 2
669.24 312.98 209,460.88
1.17 To suspended floor beam m2 1,457.00 312.98 456,016.52
1.18 To shear wall m2 1,466.50 312.98 458,989.86
1.19 To 15cm thick floor slab m2 1,724.00 312.98 539,583.04
1.20 To stair case and landings m2 129.12 312.98 40,412.39
1.21 To Ramp slab m2 70.00 312.98 21,908.82
Reinforcement steel bar according to the structural
drawing.Price shall include cutting , bending and placing in
position.
- 0.00
1.22 Dia.8 deformed bar Kg 18,000.00 51.01 918,205.20
1.23 Dia.10 deformed bar Kg 2,530.98 51.26 129,736.01
1.24 Dia.12deformed bar Kg 9,110.86 48.26 439,708.33
1.25 Dia.14deformed bar Kg 10,339.93 48.57 502,197.99
1.26 Dia.16deformed bar Kg 16,000.00 48.07 769,171.20
1.27 Dia.20deformed bar Kg 1,500.00 41.49 62,233.20
Total carried to summery - 6,051,223.5
2 ELEVATION WALL -

boq,spec price
PROJECT:
LOCATION:
SPECIFICATION , BILL OF QUANTITY & PRICE
Contract Total Contract
Item No. Description Unit Rate
Qty Amount
2.1 20x20x40 class "B" H.C.B. wall joined in cement mortar mix
(1:3)
m2 2,205.00 478.71 1,055,564.81
2.2 15x20x40 class "B" H.C.B. wall joined in cement mortar mix
(1:3)
m2 264.00 361.27 95,374.96