Warehouse Final01
Warehouse Final01
Description
10
09
08
07
06
05
04
03
02
01
DRG No
3D View
1
Copyright and use of this Drawing is Reserved by End
Project Owner:
Equipment Design:
Details:
3D View
Scale: Job No: Date: 2022/02/09
Size REV:
Drawing No:
20220125 - D - 01 A3 00
Floor Plan
1
1 : 225
1 2 3 4 5 6 7 8 9 10 11 12 13
61200
5100 5100 5100 5100 5100 5100 5100 5100 5100 5100 5100 5100
1000
ITEM QTY Materials Notes
A A Description
15000
14000
//// ////////////////////////////////////////// ////////
10
09
08
07
1000
B B
06
1000 4100 1000 4100 1000 4100 1000 4100 1000 4100 1000 4100 1000 4100 1000 4100 1000 4100 1000 4100 1000 4100 1000 4100 1000 05
04
1 2 3 4 5 6 7 8 9 10 11 12 13
03
02
Foundation Plan
01
2
1 : 225
DRG No
1 2 3 4 5 6 7 8 9 10 11 12 13
61200
5100 5100 5100 5100 5100 5100 5100 5100 5100 5100 5100 5100
1200
A A
13800
16200
Process
Checked: Engineer N/A
Civil Process
Engineer N/A Engineer N/A
Civil Structural
Engineer N/A Engineer N/A
Civil Electrical
Engineer N/A Engineer N/A
Civil Co-Ordination
Engineer N/A Engineer N/A
1200
B B
Project Owner:
1200 3900 1200 3900 1200 3900 1200 3900 1200 3900 1200 3900 1200 3900 1200 3900 1200 3900 1200 3900 1200 3900 1200 3900 1200 Equipment Design:
62400 Details:
Foundation Plan and Floor Plan
1 2 3 4 5 6 7 8 9 10 11 12 13
Scale: 1 : 225 Job No: Date: 2022/02/09
Size REV:
Drawing No:
20220125 - D - 01 A3 00
ITEM QTY Materials Notes
Description
10
09
North Elevation
1 08
1 : 225
07
06
05
04
03
02
01
DRG No
Project Owner:
Equipment Design:
Details:
Elevation
Scale: 1 : 225 Job No: Date: 2022/02/09
Size REV:
Drawing No:
20220125 - D - 01 A3 00
ITEM QTY Materials Notes
Description
10
09
08
07
06
East Elevation
1 05
1 : 100
04
03
02
01
DRG No
Size REV:
Drawing No:
20220125 - D - 01 A3 00
1 2 3 4 5 6 7 8 9 10 11 12 13
5100 5100 5100 5100 5100 5100 5100 5100 5100 5100 5100 5100
A A
3538
14151
3
3538
N.º 05
4
3538
B B 10
09
61200 08
07
1 2 3 4 5 6 7 8 9 10 11 12
06
Purlins C120x2 Bracing L70x7
61479 05
04
Spacing Purlins
03
1
1 : 225
02
01
DRG No
7.53°
Size REV:
Drawing No:
Bracing Details Bracing connectors A3
3 4 20220125 - D - 01 00
1 : 35 1 : 20
3
N.º 06 2
A 3569 B
N.º 06
8000 8000
3569
3569
Roof Steel 6mm
Side Covering
3569
2000
162.19°
°
22
ITEM QTY Materials Notes
Description
0.
6000 6000
10
Purlins - C120x2
Knee to connect the beam and
column - IPE 600 163.
57°
8000
(type 2)
9305
6000
REV.BY Description Date: APRR.
10
Column IPE 600
Masonry Wall
09
08
3000
(type 1)
07
06
05
Floor slab (100 mm)
Ø6 @200 mm 04
0 0
03
02
1305
01
Section 1
1
1 : 75
600 20
120
Process
Purlin cleat Checked: Engineer N/A
Civil Process
Engineer N/A Engineer N/A
1200
Civil Structural
Engineer N/A Engineer N/A
Civil Electrical
Engineer N/A Engineer N/A
Civil Co-Ordination
Engineer N/A N/A
600
Engineer
600
Project Owner:
Column IPE 600 Connection Plate
(type 1) 1800 Equipment Design:
Details:
Sections
Scale: As indicated
Como indicado Job No: Date: 2022/02/09
500 500
IPE 600
Column
ITEM QTY Materials Notes
Baseplate Foundation beam Description
500x900x35 30x20
-35
Baseplate
500x900x35
144 144
970
Elevation Lateral View
1270
1 2
1 : 20 1 : 20 //// ////////////////////////////////////////// ////////
Baseplate: 35 mm 09
150
300
-1305 08
07
300
Levelling mortar: 20 mm
500x900x35
06
Baseplate
115
Ø10a/15 C=1380
900
05
330
04
300
1150
03
02
150
01
Section
100 300 100 5 DRG No
1 : 25
500
150
Copyright and use of this Drawing is Reserved by End
1200
Process
900
Civil
Engineer N/A Engineer N/A
Civil Structural
Engineer N/A Engineer N/A
Civil Electrical
Engineer N/A Engineer N/A
Civil Co-Ordination
Engineer N/A Engineer N/A
150
Aproved: Elton Huo AP
Project Maneger Drawing Office maneger
1200
Project Owner:
Foundation Structure Equipment Design:
6
1 : 25 Details:
Foudactions Details
Scale: As
Comoindicated
indicado Job No: Date: 2022/02/09
Size REV:
Drawing No:
20220125 - D - 01 A3 00
ITEM QTY Materials Notes
Description
8000
7957
REV.BY Description Date: APRR.
10
09
15 570 15
15 570 15
08
600
600
6000
07
220 220 06
05
04
Column Section type 1 Column Section type 2
2 4 03
1 : 50 1 : 50
02
01
DRG No
Project Owner:
Equipment Design:
Details:
Masonry wall Column Details
Scale: As
Comoindicated
indicado Job No: Date: 2022/02/09
Size REV:
Connection the masonry wall with Steel Structure
5 Drawing No:
1 : 25 20220125 - D - 01 A3 00
14360 ITEM QTY
Description Materials Notes
600
Beam IPE 600
10
09
08
07
06
05
04
03
02
Beams 01
1
1 : 50
DRG No
Project Owner:
Equipment Design:
Details:
Beams Details
Scale: 1 : 50 Job No: Date: 2022/02/09
Size REV:
Drawing No:
20220125 - D - 01 A3 00
ITEM QTY Materials Notes
Description
13
2
116
7
120
2
63
70
70
2
2 46 2
//// ////////////////////////////////////////// ////////
50
7
REV.BY Description Date: APRR.
10
09
08
07
06
Purlin - Perfil C120x2 Bracing L70x7
1 2 05
1:5 1:5
04
03
02
01
DRG No
600
13 574 13
110
220
24
110
Project Owner:
Equipment Design:
Details:
Metalic profile
Scale: As
Comoindicated
indicado Job No: Date: 2022/02/09
Size REV:
Drawing No:
20220125 - D - 01 A3 00
Schedule for the steel elements Schedule for concrete
Volume
Description Qts Dimensions Length (m) ITEM QTY Materials Notes
Properties (m3) Description
Foundation Structure 0,432 26 1,20x1,20x0,30
Guidance
Sketch Qts Description Column start 0,970 26 1,00x1,00x0,97
10
08
07
6,000 122 732,00
06
13 Column - IPE 600
04
03
02
Schedule for the steel
01
1 : 20
DRG No
Properties
Sketch Qts Diameter Ø
h (m) Kg/m
Civil Structural
6mm
Engineer N/A Engineer N/A
307 14,1 0,282
Civil Electrical
Engineer N/A Engineer N/A
16 14,2 0,888 Civil Co-Ordination
N/A N/A
Foundation
Engineer
12mm Engineer
beam
24 19,60 0,888
Project Owner:
Equipment Design:
Steel elements
Details:
1 : 20
Schedule
Scale: 1 : 20 Job No: Date: 2022/02/09
Size REV:
Drawing No:
20220125 - D - 01 A3 00