Professional Documents
Culture Documents
Kel.5 GBR Kerja
Kel.5 GBR Kerja
University of Sumatera Utara, Jl. Almamater No.1, Padang Bulan, Medan Baru, Medan City, North Sumatra 20155
DIRANCANG OLEH:
Kelompok 4 SI-5F
10.00
4.00 4.00
7
1.00
R. TIDUR
PEMBANTU R. DAPUR
2.50 2.50
±0.00 MAKAN ±0.00
±0.00
5
1.50 KM/WC
1.50
-0.05 19.00
4
R. KELUARGA 12.00
±0.00
2.00
TERAS 2.00
-0.02
3 NAIK
A 1.75 A
KM/WC
-0.05
R. TAMU
2.80
2 ±0.00
R. TIDUR
2.25 UTAMA
±0.00
TERAS 1.20
1 -0.02
CARPORT
3.00 3.00
A B C D E
B
DENAH LANTAI 1
SKALA 1 : 100
B
17.00
10.00
6.00 6.00
BALKON
2.50 2.50
+3.55
5
1.50
19.00
4
R. SANTAI 3.50
+3.65
2.00 10.00
3 TURUN
A 1.75 A
KM/
WC
+3.60
2 2.80
R. TIDUR R. TIDUR
2.25 +3.65 +3.65
1.20
1
3.00 3.00
A B C D E
B
DENAH LANTAI 2
SKALA 1 : 100
0.66
+9.35
GENTING
BETON FLAT
4.45 5.11
KUDA-KUDA 2.25
BAJA RINGAN
+7.15
+6.85 +6.85
+6.65
3.50
R. SANTAI
+3.65
+3.65
+3.20 +3.20
+3.00 +3.00
3.65
R. TERAS
-0.15 KELUAR±G0. -0.02
±0.00
A00
0.60
-0.60
0.60
-1.20
2.00
1.40
-2.60
E D C B
POTONGAN A-A
SKALA 1 : 100
+9.35
GENTING
5.11 BETON FLAT
2.25
KUDA-KUDA
30° BAJA RINGAN
3.50
GENTENG
METAL BALKO R. SANTAI KM/ R. TIDUR
+3.65 WC +3.65
15° N +3.65
+3.55 -3.60
3.65
3.30
R. TIDU
LAUNDR MBANT R KM/ TERAS KM/ R. TIDUR
Y PE U±0.00 WC -0.02 WC UTAMA ±0.00
-0.02 -0.15 ±0.00
-0.30 -0.05 -0.05
0.60
-0.60
0.60
-1.20
2.00 1.40
-2.60
7 6 5 4 3 2 1
POTONGAN B-B
SKALA 1 : 100
TAMPAK DEPAN
SKALA 1 : 100
TAMPAK
BELAKANG
SKALA 1 : 100
TAMPAK SAMPING
KIRI
SKALA 1 : 100
TAMPAK SAMPING
KANAN
SKALA 1 : 100
17.00
10.00
4.00 4.00
SLOOF 15/25
7
1.00
2.00
6
C
SLOOF 15/25 SLOOF 15/25
2.50 2.50
SLOOF 15/25
5
1.50 SLOOF 15/25 SLOOF 15/25 1.50
19.00
4 12.00
SLOOF 15/25 SLOOF 15/25
2.00 2.00
SLOOF 15/25
1.75 B A
2.80
2
SLOOF 15/25
2.25
3.00 3.00
A B C D E
7
1.00 10.00
FP 1 FP 1 FP 1 FP 1 FP 1
5 5
1.50 1.50 1.50
4 12.00 4
3.50
3 3
1.75 1.75
FP 1
2.80 2.80
2 2
FP 1 FP 1
2.25 2.25
FP 1 FP 1 FP 1 1.20 1.20
1 1
A B C D E A B C D E
7 10.00
1.00 KP 15/15
5 5
1.50 1.50 1.50
KP 15/15 KP 15/15 KP 15/15
4 12.00 4
3.50
3 3
1.75 1.75
KS 25/25 KP 15/15 KS 25/25 KP 15/15
2.80 2.80
2 2
KP 15/15 KS 25/25 KS 25/25 KS 25/25 KS 25/25
2.25 2.25
1 1
A B C D E A B C D E
BA 15/25 15/20
2.00 BI 15/35 10.00 2.00 10.00
A B C D E A B C D E
10.00
6.00
2.50 2.50
5
1.50
19.00
4
3.50
2.00 10.00
1.75
2.80
2
2.25
1.20
3.00
A B C D E
TAMPAK ATAS
SKALA 1 : 100
17.00
10.00
6.00
2.50 2.50
5
1.50
19.00
4
3.50
2.00 10.00
1.75
2.80
2
2.25
1.20
A B C D E
7
1.00 BV 10.00
6
6
P1
PJ3
5
P2
5
1.50 BV PJ4 J4 J4
1.50 1.50
J1
4
12.00 4
3.50
P2
3 3
P1 P1 P1
1.75 BV 1.75 BV
2.80 2.80
2 2
P2
PJ1 J4
2.25 2.25
1.20 J2 1.20
J2 J1 J1 J1
1 1
A B C D E A B C D E
10.00
7
1.00 3.00 2.00 3.00 2.00
2.00
1.00 6
6
2.50 2.50
2.50 2.50
5
5
1.50
1.50 1.50
4
3.50
4 12.00
2.00 10.00
2.00 2.00
3
3
1.75
1.75 2.80
2.80 2
2
2.25
2.25 1.20
1.20
1
1
A B C D E
A B C D E
KETERANGAN
Down light 3" Saklar ganda Exhaust fan
Down light 4" Saklar hotel Stop kontak
Lampu baret Box zekering/MCB Stop kontak antena
Saklar tunggal Arde AC Stop kontak AC
Lampu Indirect
17.00
10.00
4.00 4.00
PO MP
A
Ke water torn
7
1.00 Dari water torn
2.00
1.00
2.50 2.50
5
1.50 1.50
19.00
4 12.00
2.00 2.00
2 2.80
2.25
1.20
3.00 3.00
ST SR
KETERANGAN
A B C D E
Jaringan air bersih
Kran
Jaringan air kotor
Floor Drain
Jaringan air kotoran
SKALA 1 : 100
SR Septik resapan
Sumur bor
POMPA Pompa air
10.00
2.50 2.50
5
1.50
4
3.50
2.00 10.00
1.75
turun ke lantai 1
2 2.80
2.25
1.20
A B C D E
KETERANGAN
SR Septik resapan
Sumur bor
POMPA Pompa air
10.00
7
1.00 10.00
6 6
R. TIDUR
R. MAKAN DAPUR BALKON
2.50 PEMBANTU 2.50 2.50 2.50
±0.00 ±0.00 +3.55
±0.00
5 5
1.50 1.50 1.50
4 R. KELUARGA 12.00 4
±0.00 R. SANTAI 3.50
+3.65
2.00 TERAS 2.00 2.00 10.00
-0.02
NAIK
3 3 TURUN
A B C D E A B C D E
KETERANGAN
Keramik 60x60
Keramik 30x30
10.00
7
1.00 10.00
1.00
6 6
+3.00
5
B 5
1.50 +3.00 +3.00
+3.00 1.50 1.50
A
4
12.00 4 +6.85 +6.65 +6.85
+3.20 +3.00 +3.20 3.50
2.00
+3.00 2.00 2.00 10.00
3
3
+3.00
1.75
+3.00 1.75 +6.65
+6.65
2 +3.20 2.80 2.80
2 +6.65
+3.00 +6.65
2.25 2.25
1 1
A B C D E A B C D E
-0.10 -0.10
PAS. BATU KALI 1PC : 3KP : 10PS PAS. BATU KALI 1PC : 3KP : 10PS
-0.60 -0.60
ANSTAMPING ANSTAMPING
URUGAN PASIR URUGAN PASIR
-1.00 -1.00
-1.20 -1.20
0.30 0.30
0.60 0.60
0.80 0.80
TRASRAM 1 PC : 3 PS
SLOOF 15/25
±0.00
-0.10 -0.15
ANSTAMPING
URUGAN PASIR
-1.00
-1.20
0.30
0.60
0.70
DETAIL PONDASI C
SKALA 1 : 25
II III IV
KAC
A
5MM
KAC KAC
A A
0.40 0.40
5MM 5MM
0.05 0.05
KAC
A
5MM
KAC KACA
A
1.15 1.15 2.10
5MM
I
5MM
0.05 0.05
POT. IV
0.10
II III
0.05
0.10 0.10
0.05 0.05
SKALA 1 : 25 I 0.05
2.10
KAC
0.55
A
5MM
0.05
POT. III
POT. II
0.10
0.05 0.80 0.75 0.05
0.05
POT. I
0.10 0.10
0.05 0.05
KAC
A
5MM
KAC
A
0.40
5MM
0.05
KAC
A
5MM
KAC
0.55
A
5MM
I
0.05
KAC 2.10
A
5MM
KAC
0.55
A
5MM
0.05
POT. III
POT. II
II III
0.10 0.10
0.05 0.05
0.10
0.05
1.00 0.90 0.90 0.05 KAC
0.05 0.05 A
0.40
5MM
POT. I
0.05
KAC
A
5MM
DETAIL PJ3 (1
BUAH)
SKALA 1 : 25
I
KAC KAC
A
1.15 2.10
A
5MM 5MM
0.05
POT. II
POT. III
0.10 0.05
0.68
0.05
KAC
A
5MM
KAC KAC
A
0.40 0.40
A
5MM 5MM
0.05 0.05
2.10
I
2.10
I
KACA KACA KACA
5MM 5MM 5MM
1.15 1.15
0.05 0.05
POT. II POT. III
0.10
0.10
DETAIL J1 (4 BUAH)
DETAIL P1 (4 BUAH) DETAIL P2 (3 SKALA 1 : 25
SKALA 1 : 25
BUAH)
SKALA 1 : 25
II III II
0.10 0.10 0.10
0.05 0.05 0.05
I
KAC KAC KAC KAC
KAC
1.15 1.15 A A
1.15
A A A
5MM 5MM I
5MM 5MM 5MM
0.05 0.05
0.10
0.60 0.05 0.60 0.60 0.05
0.05
POT. I
0.95
0.05
POT. I
DETAIL J2 (2 BUAH) II
0.10
SKALA 1 : 25
0.05
KAC KACA
A 5MM
5MM
II I 1.00
KAC A
5MM 0.40
I 0.05
POT. II
0.05
POT. II
0.10
0.10
0.05 0.50 0.50 0.05
0.05 0.60 0.05
POT. I POT. I
SKALA 1 : 25
DETAIL BV (4
BUAH)
DETAIL J4 (3 BUAH)
SKALA 1 : 25
6/12
6/12
2/3 2/3
KLOS 2/3 5/7
5/7
TAMPAK DEPAN
PROYEKSI MIRING
TAMPAK ATAS
DETAIL PLAFON A
SKALA 1 : 10
5/7
5/7
TAMPAK DEPAN
PROYEKSI MIRING
TAMPAK ATAS
DETAIL PLAFON B
SKALA 1 : 10
TOP CHORD 80.35.75
D
BOTTOM CHORD 80.35.75
A B
7.50
DETAIL A
SKALA 1 : 20
TOP CHORD 80.35.75
DETAIL D
DETAIL B SKALA 1 : 20
SKALA 1 : 20
0,85
0,25
0,2
0,25
0,2
0,3
2Ø8 2 Ø 12 2 Ø 12
3 Ø 13
Ø 6 mm - 15 cm
15
2 Ø 13 6 mm - 15 cm 20 6 mm - 15 cm
25 25
2Ø8
15
Ø 8 mm - 15 cm 3 Ø 12
3 Ø 12 15
3 Ø 13
15
25
11 3 Ø 10
2 Ø 10
Ø 6 mm - 15 cm 20 Ø 6 mm - 15 cm
30 26
2 Ø 10
15
2 Ø 12
15
11
3 Ø 13
2 Ø 13
DETAIL BALOK ANAK 15/25 (BA)
2 Ø 13
11 3 Ø 10 2 Ø 10
Ø 8 mm - 15 cm
35 35 Ø 6 mm - 15 cm
2 Ø 13 25 Ø 6 mm - 15 cm
Ø 6 mm - 15 cm 1 Ø 13 21 25
2 Ø 16 2 Ø 16
2 Ø 12 3 Ø 10
15 15
15 15
DETAIL PEMBESIAN
SKALA 1 : 10
25
90
Ø 8 mm - 15 cm
100
15
Ø 13 mm - 15 cm
20
Ø 13 mm - 15 cm
100
100
0.30
KE PERESAPAN DARI CLOSET
0.30
0.50
0.30
0.30
SEPTICTANK
SKALA 1 : 25
0.12
0.62 0.62
MUKA AIR
PAS. 1/2
1.38 1.38
PAS. 1 BATU CAMP BATU
CAMP
0.20 0.20
Dari Septictank
berlubang
1.50 Batu kosong Batu kosong 1.50
Kerikil Kerikil
Pasir
Pasir
Ijuk
Ijuk
0.10 0.10
0.20 0.10 0.60 0.10 0.20 0.20 0.10 0.60 0.10 0.20
PERESAPAN PERESAPAN
SKALA 1 : 20 SKALA 1 : 20