INSPECTION REPORT OF THIRD FLOOR ROOMS

Room No Maintenance Works Needs to be done


wall stickers need to be fix properly ( scratches and damages)
stains accumulation on ceiling
2301
floor tiles need to be grout properly
bathroom glass door end strip need to be change
wall stickers need to be fix properly ( scratches and damages)
2302
Bathroom smelling issue
bathroom ceiling gypsum work
2306 wall stickers need to be fix properly ( scratches and damages)
floor tiles need to be grout properly
wall stickers need to be fix properly ( scratches and damages)
2311
floor tiles need to be grout properly
Reading table minor scratch
wall stickers need to be fix properly ( scratches and damages)
2312
floor tiles need to be grout properly
wall stickers stain accumulation
window ceiling and wall areas are damaged my water seepage
2314 wall tile on bottom of bath tub peeled off
bathroom ceiling exhaust grill area leaking
OOR ROOMS
Remarks
need to do patch works
need to do paint touchup
need a civil works
need to be check
need to do patch works
need to be fix
need to do civil work

need to do patch works Note: 303,304, 305, 307,308,309,310 Rooms Occupied


need a civil works
need to do patch works
need a civil works
need to do carpentry work
need to do patch works
need a civil works
need to be clear
need a civil works
need a civil works
need to civil works
,310 Rooms Occupied