The document reports on various issues found during inspection of different parts of a plant. It notes that sensors and cables are not connected in several areas including the Kahl tower, pelletizer, and cooling towers. It also reports issues like loose bolts, gaps that should be closed, missing anchor bolts, and poor workmanship on air hoses and piping. Electrical connections need to be made for instrumentation and other equipment in various areas like the azo finegrinding and azo N2 & ODA systems. Rotating parts in the grinding tower were found without safety devices.
The document reports on various issues found during inspection of different parts of a plant. It notes that sensors and cables are not connected in several areas including the Kahl tower, pelletizer, and cooling towers. It also reports issues like loose bolts, gaps that should be closed, missing anchor bolts, and poor workmanship on air hoses and piping. Electrical connections need to be made for instrumentation and other equipment in various areas like the azo finegrinding and azo N2 & ODA systems. Rotating parts in the grinding tower were found without safety devices.
The document reports on various issues found during inspection of different parts of a plant. It notes that sensors and cables are not connected in several areas including the Kahl tower, pelletizer, and cooling towers. It also reports issues like loose bolts, gaps that should be closed, missing anchor bolts, and poor workmanship on air hoses and piping. Electrical connections need to be made for instrumentation and other equipment in various areas like the azo finegrinding and azo N2 & ODA systems. Rotating parts in the grinding tower were found without safety devices.
Hot mix To less space between scale and fixed other
cooling L12 parts.
Pelletizer / Grecon sensors not installed yet on several
Bigbag filling places (Picture is just an example). Remark: Installed bot not connected
Kahl Tower Cables not connected (grecon)
Kahl Tower Cables not connected (grecon)
Cooling tower The sprinkler head is directly in the area of
Line 1&2 the explosion pot of the filter. In the event of an explosion, a hot pressure wave is generated in the area of 2.5m, which will supposedly trigger the sprinkler, which would be a false alarm, as there is no fire and would cause more problems. Cooling tower General: Grecon sensors not connected Line 1&2
Cooling tower bolts are not tight
Line 1&2
Cooling tower Bearing bolt not tightend
Line 1&2
Cooling tower Motor bolts not tightend
Line 1&2
Cooling tower Motor bolts not tightend
Line 1&2 Cooling tower Bad workmanship for air hoses at filter Line 1&2
Finegrinding The gap between the rolling gates should be
closed.
Finegrinding In some cases, anchor bolts are missing from the
feet of the Nollmills.
Finegrinding Sound cabinet should be sealed as much as
possible. Foto serves as an example.
AZO Electrically not connected
finegrinding AZO Electrically not connected finegrinding
AZO Electrically not connected
finegrinding
AZO Electrically not connected
finegrinding
AZO Electrically not connected
finegrinding
Azo N2 & ODA Blower motor not connected
Azo N2 & ODA Instrumentation not electrically connected
Azo N2 & ODA Instrumentation not electrically connected
Azo N2 & ODA Instrumentation not electrically connected
Azo N2 & ODA Instrumentation not electrically connected
Azo N2 & ODA Instrumentation not electrically connected
Azo N2 & ODA Instrumentation not electrically connected
Azo N2 & ODA Instrumentation not electrically connected
Azo N2 & ODA Instrumentation not electrically connected
Hot mix cooling Fit piping/hoses to vaccuum breaker valves on hot
L12 mix tower. Connect electrically. Bolt to structure (2x)