Concrete Summary APRIL

Quantity
S.No Date Building Description Grade
(CUM)
1 1/4/2023 TOWER CRANE FOUNDATION (T.C.NO 5) C56/20 77
2 1/4/2023 SN2 STAIRECASE 01 (2F TO 3F) C50/20 7
3 1/4/2023 DRY MIX C50/20 10
4 2/4/2023 SE2 3rd FLOOR P.T SLAB C50/20 254
5 2/4/2023 ZONE-1B5 COLUMN FOOTING (BASEMENT)(3 NOS) C56/20 16
6 RC2 COLUMNS (10 NOS)+SHEARWALL (1 NOS) (B.M TO G.F) 35
7 3/4/2023 SE1 SHEARWALL (1 NOS) (SF TO GF) C50/20 8
9 RB4 COLUMNS (7NOS) (ROOF TO TOP ROOF) 7
10 3/4/2023 P.C.C C25/20 10
11 4/4/2023 SE3 SLIPFORM / COREWALL LEVEL (+22.40 TO +25.90M) C50/20 49
12 6/4/2023 ZONE-1B5 COLUMN FOOTING / SUB-STATION P.C.C C25/20 26
13 8/4/2023 SE2 4th FLOOR P.T SLAB C50/20 240
14 SE3 COLUMNS (11 NOS) (3F TO 4F) 20
15 8/4/2023 ZONE-1B5 COLUMNS (3 NOS) (BM TO GF) C50/20 8
16 RC2 COLUMNS (8 NOS)+SHEARWALL (1 NOS) (B.M TO G.F) 30
17 8/4/2023 SN2 STAIRECASE 02 (3F TO 4F) C50/20 7
18 9/4/2023 SN2 STAIRECASE 01 (3F TO 4F) C50/20 7
19 10/4/2023 SE4 WATER TANK WALL (BM TO GF) C50/20 65
20 10/4/2023 ZONE-1B7 POURSTRIP (PODIUM) C50/20 14
21 ZONE-1B7 MEP FOUNDATION 8
11/4/2023 C50/20
22 RB2 SLAB ON GRADE 26
23 11/4/2023 DRY MIX C25/20 8
24 11/4/2023 ZONE-1B7 SLAB ON GRADE C44/20 25
25 SE2 COLUMNS (16 NOS) (4F TO 5F) 21
12/4/2023 C50/20
26 SE3 COLUMNS (8 NOS)+SHEARWALL (1 NOS) (3F TO 4F) 19
27 12/4/2023 SE2 SLIPFORM / COREWALL LEVEL (+26.90 TO +29.520M) C50/20 49
28 13/4/2023 RC1 1st FLOOR P.T SLAB C50/20 330
29 13/4/2023 RC2 SHEARWALL (1 NOS) (BM TO GF) C50/20 14
30 15/4/2023 ZONE-1B5 COLUMN FOOTING / SUB-STATION C56/20 90
31 SE2 COLUMNS (5 NOS)+SHEARWALL (1 NOS) (4F TO 5F)
16/4/2023 C50/20 28
32 SE3 SHEARWALL (1 NOS) (3F TO 4F)
33 16/4/2023 DRY MIX C50/20 8
34 17/4/2023 RC4 GROUND FLOOR P.T SLAB C50/20 590
35 17/4/2023 ZONE-1B5 COLUMNS (5NOS) (B.M TO G.F) C50/20 11
36 19/4/2023 SN2 STAIRECASE 1&2 (4F TO 5F) C50/20 13
37 ZONE-1B5 COLUMNS (3NOS) (B.M TO G.F) 7
38 19/4/2023 RC2 SHEARWALL (1NOS) (B.M TO G.F) C50/20 13
39 SE2 SHEARWALL (1NOS) (4F TO 5F) 10
40 24/4/2023 RB4 STAIRECASE 2 (6F TO 7F) C50/20 7
41 24/4/2023 SE1 6th FLOOR P.T SLAB C50/20 248
42 24/4/2023 ZONE-1B5 UP STAND FOR L.V ROOM C50/20 14
43 25/4/2023 SE2 SLIPFORM / COREWALL LEVEL (+29.52 TO +31.02M) C50/20 16
44 25/4/2023 SE3 4th FLOOR P.T SLAB C50/20 248
45 25/4/2023 RC1 COLUMNS (10NOS) (1FTO 2F) C50/20 16
46 25/4/2023 DRY MIX C25/20 16
47 26/4/2023 RB4 STAIRECASE 1 (6F TO 7F) C50/20 7
48 26/4/2023 RC4 SLIPFORM / COREWALL LEVEL (+8.3 TO +11.8M) C50/20 36
49 RC1 COLUMNS (10 NOS)+SHEARWALL (1 NOS) (1F TO 2F) 30
50 RC4 COLUMNS (6 NOS)+SHEARWALL (1 NOS) (GF TO 1F) 20
51 29/4/2023 SE3 COLUMNS (6 NOS) (4F TO 5F) C50/20 16
52 RB4 COLUMNS (6 NOS) (ROOF TO TOP ROOF) 6
53 SE1 COLUMNS (8 NOS) (6F TO 7F) 10
54 29/4/2023 SE4 WATER TANK WALL (BM TO GF) C50/20 26
55 30/4/2024 SE3 Slipform (+25.99 to 29.42) C50/20 46