Concrete Summary March

Quantity
S.No Date Building Description Grade
(CUM)
1 1/3/2023 SE2 slip form/core wall (+19.00 to 22.50 m) C50/20 49
2 Roof Floor post tension slab 280
3 SN2 Building staircase 2 (mid landing 01 to F.F) C50/20 6
4 Pipe Encasement (Zone-1B8) 10
2/3/2023
5 RC4 Columns/shear wall (1F to 2F) 16
6 SE3 Shearwall (1 to 2F) C50/20 8
7 SE2 Columns/shearwall (2 to 3F) 26
8 RC1 Slip form core wall (+8.150 m to 11.650 m) 35
4/3/2023 C50/20
9 SE1 Staircase 2 (ground to first floor) 6
10 ZONE 1B8-A Slab on Grade at zone 1B8-A (Podium Area) LEV : Basement C44/20 30
5/3/2023
11 Dry Mix C40/10 10
12 RA3 MEP Foundation (roof floor)/RB4staircase 1&2 (5 To 6 floor) 21
13 SE1 Columns/shearwall (4 to 5F) 14
14 SE2 Columns/shearwall (2 to 3F) 18
6/3/2023 C50/20
15 RC1 Columns/Shearwall (GF To FF) 17
16 RC4 Columns (BM To Gf) 14
17 RC2 Slipform/Corewall (-4.550 m to -2.750 m) 18
18 RA4 MEP Foundation Roof Floor C50/20 6
7/3/2023
19 SN1 Roof Screed (With Fibre) C25/10 12
20 SN2 Building staircase 1 (GF To FF) 7
21 8/3/2023 RB1 Building (1st Floor) Sunken Slab C50/20 12
22 SN2 Columns/Shearwall (Roof to Roof top) 9
23 RC1 Columns/Shearwall (GF To FF) 24
24 9/3/2023 RC2 Columns/Shearwall (BM To GF) C50/20 20
25 RB4 Roof Floor post tension slab 364
26 11/3/2023 SE3 2nd Floor Post Tension Slab C50/20 245
27 12/3/2023 RC2 Slip form core wall (-2.750 m to -0.100 m) C50/20 26
28 13/3/2023 RC-1 Sliform / corewall (+11.650 to +15.150 m) C50/20 43
29 SE-1 5th Floor PT slab 238
30 SN-2 Ground Floor Upstand 8
31 14/3/2023 SN-2 Columns/Shearwall (Roof to Roof top) C50/20 8
32 RC-4 Columns/Shearwall (BM To GF) 11
33 SE-3 Columns (2nd to 3rd Floor) 12
34 SE-3 Slipform/Corewall (+18.990 m to +22.400 m) 46
15/3/2023 C50/20
35 RA-1 Lift Machine Room 8
36 SN-2 Building Staircase-2 (1st to 2nd Floor) C50/20 7
37 RB-2 PCC For Retaining Wall C25/20 11
16/3/2023
38 SE-3 Columns / Shearwall (2F to 3F) 19
C50/20
39 RC-2 Columns ( BM to GF) 5
40 SE-2 3rd Floor PT Slab 241
41 18/3/2023 RC-2 Slipform / Corewall (-0.100 to +4.900 m) C50/20 49
42 RC-1 Columns/Shearwall (GF To FF) 31
43 SE-3 Staircase-2 (Raft to Mid landing) 7
19/3/2023 C50/20
44 zone 1B5 Columns ( BM to GF) 5
45 SN-2 Staircase-01 (1F to 2F) 7
46 Zone 1B-1 Podium Upstand C50/20 3
47 RA-2 Lift Machine Room Upstand (Roof Floor) 3
48 20/3/2023 Zone 1b-8 Slab on Grade C44/20 40
49 SE-1 Columns (5F to 6F) 9
50 SE-2 Columns (3rd to 4th Floor) 18
C50/20
51 SE-3 Columns/shearwall (2 to 3F) 13
52 21/3/2023 RC-4 Columns/Shearwall (BM To GF) 16
53 RC-1 Columns/Shearwall (GF To FF) 28
54 SE-1 Columns (5F to 6F) 17
C50/20
22/3/2023
55 SE-2 Column/shearwall (3F to 4F) C50/20 21
56 22/3/2023 RC-2 Columns (BM to GF) 9
57 SE-2 Slipform/corewall (+22.500 to +26.00 m) 48
58 Zone 1b-5 PCC for column footings 8
C25/20
59 TC NO : 05 Tower Crane 6
60 RA-1 A/C foundation roof (lift machine room) 4
C50/20
61 SN-2 Top roof / RCC slab 20
26/3/2023
62 SE1 Shearwall ( 5F to 6F) C50/20 11
63 SE2 Shearwall ( 3F to 4F) C50/20 11
64 SN-2 Staircase-02 (2F to 3F) 7
27/3/2023 C50/20
65 SE-1 Columns (5F to 6F) 8
66 RC2 Columns (BM to GF) C50/20 20
29/3/2023
67 RC2 Slipform / Corewall (4.900 to 8.400 m) C50/20 40