Drain valves All drain valve should be fully opened (see the attached list )
MAIN TURBINE START UP CURVA UNIT 1 AFTER SERIOUS INSPECTION MAIN TURBINE OF OCTOBER 2022
RPM
3000 D
2500 C
2000
1500
Generator Synchrones
1100 B
500 A
0
Time/Min. 120-150 Min 60 Min
15-30 min
a. b. c. d.
Keterangan Kurva :
A = Speed 500 rpm, hold for 15 - 30 minutes, rub check bearing turbine
B = Speed 1100 rpm, hold for 120 - 150 minutes, monitor and control temperature cassing turbine for control diff. expansion
C = Speed 2500 rpm, hold for 60 minutes, monitor and control temperature cassing turbine for control diff. expansion
D = Speed 3000 rpm, preparation generator syncronice
Rolling Turbine :
Speed up to 500 RPM ( Speed Rate set 100 RPM/Min, MSP = 1.0 - 1.2 Mpa ; MST = 280 - 290 °C ; RST = 220 -230 °C) ---> Hold 15-30 Minutes.
a.
( Monitoring all parameter Turbine )
Speed up to 1100 RPM ( Speed Rate set 100 RPM, MSP = 1.0 - 1.2 Mpa ; MST = 290 - 305 °C ; RST = 230 -248 °C) ---> Hold about 120-150
b.
Minutes. ( Monitoring all parameter Turbine )
Speed Up to 2500 RPM ( Speed Rate set 150 RPM / Min, MSP = 1.1 - 1.2 Mpa ; MST = 305 - 325 °C ; RST = 248 -272 °C ) ----> Hold about 60
c.
Minutes ( Monitoring all parameter Turbine )*
Turbine Speed Up to 3000 RPM ( Speed Rate set 150 RPM, MSP = 1.1 - 1.2 Mpa ; MST = 325 - 355 °C ; RST = 272 - 310 °C) & Monitoring All
Parameter Turbine
d.
Turbine Rotation is Reached to 3000 RPM Hold for Warming & Preparation for Synchrone about 17 min.
Unit 1 Synchrone to Grid and Initial Load 3 MW.
Note :
* - if the vibration is in the range of 50 - 90 µm and stable, to speed up from 1100 rpm up to 2500 rpm the speed rate
is 200 - 300 rpm
- if the vibration is more than 90 µm, to speed up from 1100 rpm up to 2500 rpm, the speed rate will be devided in
2 (two) stages:
1. From 1100 rpm up to 1500 rpm the speed rate is 150 rpm.
2. From 1500 rpm up to 2500 rpm the speed rate is 200 - 300 rpm.
Load up Curve
MW D
40 C
10 B
4 A
0
Time/Min 30 min 6 min 60 min 30 min 120 min
Load up Curve
Unit #1 Synchrone, initial load 3 -4 MW (MSP = 2,4 Mpa ; MST = 325 - 355 °C ; RST = 272 - 310 °C), Holding time 30 Min ----> Monitoring all
A
turbine parameters*
Load increase to 4 MW — 10 MW, speed rate 1 MW/ Min, (MSP = 2.4 - 3.5 Mpa ; MST = 355 - 420 °C ; RST = 310-370 °C), Hold about 60 Min --
B
--> Monitoring all parameter Turbine
Load increase to 10 MW — 40 MW, speed rate 1 MW/ Min, (MSP = 3.5 - 4.5 Mpa ; MST = 420 - 480 °C ; RST = 370-460 °C), Hold about 120
C
Min ----> Monitoring all parameter Turbine
Load increase to 135 MW ( Max Load) (MSP = 3.5 - 13.2 Mpa ; MST = 480 - 535 °C ; RST = 460 - 535 °C), ----> Monitoring all parameter
D Turbine
Note :
* - Monitoring Differential Expansion H & L, Vibration, temperature of bearing, return oil from bearing and parameter
of thrust bearing.
- The main steam temperature should be kept 50 - 60°C above the regulating stage temperature.
- Drain valves closing :
- at 10% load (13,5 MW) close all drain valve main steam line and HIP cylinder
- at 20% load (27 MW) close drain valve Reheat steam and LP cylinder
- at 30% load (40.5 MW) close drain valve extration no 3
Turbine drain valves check list
No urut Nama peralatan KKS open before steam admission Close after load
6 Cld Reht pipe drain vlv A after Check valv 10 LBC 11AA 404
7 Cld reht pipe drain valv B before check vlv 10 LBC 12AA 404
8 Cold reheat drain valve A before check valve 10 LBC 50AA 402
Extraction stage 1
12 Check valve extraction stage 1 10 LBQ 70AA 402
Extraction stage 2
15 Drn valve upstm sec extraction 10LBQ 60AA 402
Extraction stage 3
18 Drn valve upstm 3rd extraction 10LBQ 50AA 402
Extraction stage 4
22 Drn valve upstm 4th extraction 10LBQ 40AA 402
Extraction stage 5
25 Drn valve upstm 5th extraction 10LBQ 30AA 408
Extraction stage 6
28 Drn valve upstm 6th extraction 10LBQ 20AA 402
20 % (27 MW)
30 % (40.5 MW)