The Systems Approach for Plastic

Waste Management (PWMgt.) in


RWPF, MoJS & Operations at CEE
Centre For Environment Education (CEE)
Rural WASH Partners Forum (RWPF), MoJS
New Delhi
Approach & Way Forward in PWMgt. For SBM-G
• During the last one year in discussions with the Team at Jal Shakti Ministry and State SBM-G teams three
important aspects have emerged in addressing the Issues, Concerns and Challenges in Plastic Waste
Management and Operations.

- Trainings, Capacity Building & Exposure – SBM-G Teams managing PWM. – developing, modules and
capacity building of the district coordinators, IEC teams at the SBM – Grameen 2.0.

- Standard Operating Procedures for PWM – Defining the systemic ways to implement and address the issues,
concerns in different areas in a more sustainable business approach with & for different stakeholders in the
ecosystem, including SBM-G teams.

- Monitoring of Actions and Digitization of Data – Creating an ecosystem of traceability, transparency and
accountability of actions at all levels and for different actions at the SBM-G. Ensuring measurability of what is
working and for what impacts it is creating. Addressing sustainability of actions.
GUJARAT
Issues, Concerns and Challenges Trainings, Capacity Building & Exposure – Standard Operating Procedures Monitoring of
(PWM) in SBM - G SBM-G Teams managing PWM for PWM – SBM – G 2.0 Team Actions and
Digitization of Data
1. Establishing PWMUs – Infrastructure • SBM-G Gujarat District Officials Trainings on SOPs for establishing PWM systems • CEE Shared with state
Details, Layouts, Machinery Details and “PWM Operations and Management” and shared and explained: SBM-G Real-time
capacity, Overall Functioning “SHG Onboarding Processes and Systems”. • Monitoring and Reporting Monitoring systems
2. Collection of Waste – systems and 40+ Officials and Participants Trained. • Payment Systems and reporting
processes trust with communities • SHG Onboarding Formats.
3. Segregation & Sorting • Discussion and Technical Guidance on • Communication & IEC
Strategy and planning for putting in place • Demonstrated
4. Forward Linkages - Recyclers &
the PWM system. SOPs for PWMUs/MRFs shared with Monitoring and
Aggregators
states Reporting Systems
5. Integrating and engaging SHGs –
• CEE team Visit to 4 blocks in the Gandhi • Fire Safety Management & and Formats with the
ensuring collection and agreeing TORs
Nagar Area to explore the current systems Emergency Plan State on 3rd November
6. Sustainable Business Model - Correct
and opportunities and understand the • Electrical Safety & First Aid 2023.
Pricing and Payment systems for the
challenges for establishing a robust and • Movement of Machinery
collection of dry waste and further
Sustainable PWM system. • Equipment and Machinery • State SBM-G Keen to
sales to Recyclers. Getting the margins
• Assets and Amenities adapt on pilot basis
to maximize benefits.
• A workshop planned with different • Operations and to hold a
7. Real Time Monitoring of Project and
stakeholders, particularly with the workshop soon..
MRF Operations – Systems for what to
Recyclers • State keen to develop a visit
monitor and hoe, formats and
program to see these working in
digitization of data for all project
• State SBM-G keen to take a pilot in the state CEE area
actions.
for setting an MRF with also recycling
8. Targeted IEC actions for Behavioral
facilities
Change – How and what actions
required for the necessary change.
ODISHA
Issues, Concerns and Trainings, Capacity Building & Exposure – SBM-G Standard Operating Procedures Monitoring of Actions
Challenges (PWM) in Teams managing PWM for PWM – SBM – G 2.0 Team and Digitization of Data
SBM - G

1. Collection of Waste • CEE Discussion on Strategy and planning for putting in SOPs establishing PWM systems: • CEE has developed Real-
place the PWM system with SBM-G - CEE establishing an • Monitoring and Reporting time Monitoring systems
2. Segregation &
MRF in one of the Districts in the state. • Payment Systems and reporting Formats
Sorting
• Organized Swachh Bharat yatra with support of IFAT India • SHG Onboarding and shared with SBM-G
3. Integrating and
on 29th September 2023 . The panel discussion focused • Communication & IEC officials.
engaging SHGs
on Plastics EPR and was chaired by Sh. Pradeep Jena, SOPs developed for PWMUs/MRFs • CEE is implementing the
4. Exploring Correct
Chief Secretary; Odisha, Dr Sanjay Nayak, Ex-DG CIPET, Dr • Fire Safety Management & system in Ganjam
Pricing and Payment
RN Prusty Chief Environmental Engineer, OSPCB, and Sh Emergency Plan District.
systems-Sustainable
Tusar Pattnaik Head of Sustainability Dabur India, Rajan • Electrical Safety & First Aid • State SBM-G Keen to
business Model
Panda Convener &Founder #Youth4water and Sh. Manish • Movement of Machinery adapt on pilot basis and
5. Monitoring of Project
Aggarwal Partner Vrindavan Plastics Mumbai. The session • Equipment and Machinery to hold a workshop
Activities
had more than 40 different civil society and Institutions of • Assets and Amenities soon.
6. Fires and burning of
Odisha. • Operations • Nearly 490 Mts. plastics
waste
• Discussions with UNICEF, Finnish Society and CED other State keen to develop a visit program and dry waste collected
partners in state dealing with other actions. Numerous to see these working in CEE area and recycled
NGOs and Recyclers.

Ganjam,
Odisha
GOA
Issues, Concerns and Challenges Trainings, Capacity Building & Standard Operating Monitoring of Actions and
(PWM) in SBM - G Exposure – SBM-G Teams managing Procedures for PWM – SBM Digitization of Data
PWM – G 2.0 Team
1. Collection of Waste particularly 1. Conducted all PARTNER’S Meet for SOPs developed for establishing • CEE Shared with state SBM-G has
from the Villages and Link with the Senior State SBM-G Officials with PWM systems: developed Real-time Monitoring
GWMS all thematic lead to discuss and • Monitoring and Reporting systems and reporting Formats.
2. Segregation & Sorting centres to facilitate the required support for • Payment Systems
be created at the GP levels and resolving identified issues and • SHG Onboarding • Demonstrated Monitoring and
linking the pick-ups. challenges. • Communication & IEC Reporting Systems and Formats

3. Linking Recyclers and building 2. Discussed and Shared Strategy and SOPs developed for • State SBM-G Keen to adapt on pilot
Forward Linkages planning for putting in place the PWMUs/MRFs basis and to hold a workshop soon,
PWM system. • Fire Safety Management & asked for a proposal for the same.
4. Integrating and engaging SHGs Emergency Plan
and also doing a workshop with 3. Discussions held with the SPCB • Electrical Safety & First Aid • Nearly 650 Mts plastics and dry
Panchayats in understanding Officials with regard to resolving • Movement of Machinery waste collected and recycled by
their approach existing challenges in PWM systems. • Equipment and Machinery partners Sampurna Earth and One
• Assets and Amenities Earth Foundation.
5. Understanding Correct Pricing State SBM-G and SPCB Goa keen to • Operations
and Payment systems- institute a workshop in creating a State keen to develop a visit
Sustainable Business Model common understanding with all program to see these working in
Panchayats CEE area
6. Monitoring of the Project
related Activities
PUNJAB
Issues, Concerns and Trainings, Capacity Building & Standard Operating Monitoring of Actions Other Support
Challenges (PWM) in SBM - Exposure – SBM-G Teams Procedures for PWM – and Digitization of Requested
G managing PWM SBM – G 2.0 Team Data
1. Establishing PWMUs – • Discussion cum orientation on SOPs developed for • CEE Shared with state • IEC and
Infrastructure Details, Layouts, Strategy and planning with the establishing PWM systems: SBM-G has developed Communication
Machinery Details and state SBM-G team for putting in • Monitoring and Reporting Real-time Monitoring support for
capacity, Overall Functioning place the PWM system, MRF • Payment Systems systems and reporting Awareness & MRF
2. Collection of Waste related operation and Monitoring • SHG Onboarding Formats. Branding
Systems • Communication & IEC
3. Segregation & Sorting • Demonstrated • MRF Layouts and
4. Linking Recyclers and building • Demonstrated Monitoring and SOPs developed for Monitoring and Machinery Details
Forward Linkages Reporting Systems and Processes PWMUs/MRFs Reporting Systems and and Specifications
• Fire Safety Management & Formats with the State
5. Integrating and engaging SHGs • In discussion for conducting State Emergency Plan on 3rd November 2023. • MRF SOPs shared
level training for the District • Electrical Safety & First Aid with the State Team
6. Understanding Correct Pricing Officials on PWM systems • Movement of Machinery • State keen to develop
and Payment systems- • Equipment and Machinery a visit program to see • Handholding and
Sustainable Business Model • Visited Rurka Kalan Block –Rurka • Assets and Amenities these working in CEE Guidance to the
Kalan Village to operationalize the • Operations area Local NGO for
7. Monitoring of Project PWM system and PWMU unit. establishing the
• Keen to adapt and have MRF/PWMUs
8. MRF Operations taken all SOPs to be shared (Rurka Kalan Block)
with the team
9. IEC , Communication & PWMU
Branding
CHHATTISGARH
Issues, Concerns and Challenges (PWM) Trainings, Capacity Building & Exposure – SBM-G Standard Operating Procedures Monitoring of Actions and
in SBM - G Teams managing PWM for PWM – SBM – G 2.0 Team Digitization of Data

1. Establishing PWMUs – Infrastructure • 04 Discussions on Strategy and planning for SOPs developed for establishing • CEE Shared with state
Details, Layouts, Machinery Details and putting in place the PWM system- CEE PWM systems: SBM-G has developed
capacity, Overall Functioning established an MRF at Jagdalpur. • Monitoring and Reporting Real-time Monitoring
2. Collection of Waste • Visit by the SBM-G mission Director to replicate • Payment Systems systems and reporting
the same in state. Guidelines issues for MRF. • SHG Onboarding Formats.
3. Segregation & Sorting • Discussion with the State SBM-G Team on • Communication & IEC
4. Linking Recyclers and building Forward Monitoring and Reporting Systems. Developing • Demonstrated
Linkages guidelines. SOPs developed for Monitoring and Reporting
PWMUs/MRFs Systems and Formats with
5. Integrating and engaging SHGs • CEE is also establishing an material Recycling • Fire Safety Management & the State on 3rd
Centre with PD DRDA, with the support of the Emergency Plan November 2023.
6. Understanding Correct Pricing and State Government • Electrical Safety & First Aid
Payment systems- Sustainable • Movement of Machinery • Nearly 350 Mts plastics
Business Model • SBM-G given 50 E-Rickshaws for collection • Equipment and Machinery and dry waste collected
systems in 50 GPs and Villages. All driven by • Assets and Amenities and recycled
7. Monitoring of Project and MRF women largely. • Operations
Operations

Bastar, C.G.
JHARKHAND
Issues, Concerns and Challenges (PWM) in Trainings, Capacity Building & Standard Operating Procedures Monitoring of
SBM - G Exposure – SBM-G Teams managing for PWM – SBM – G 2.0 Team Actions and
PWM Digitization of Data
1. Establishing PWMUs – Infrastructure Details, • Provided State Level Training for all SOPs developed for establishing • CEE Shared with
Layouts, Machinery Details and capacity, SBM-G District Coordinators in Ranchi PWM systems: state SBM-G has
Overall Functioning with 100 participants on various • Monitoring and Reporting developed Real-time
2. Collection of Waste and Processing aspects of establishing PWM systems • Payment Systems Monitoring systems
and associated aspects. 100+ Officials • SHG Onboarding and reporting
3. Segregation & Sorting and Participants Trained. • Communication & IEC Formats.
4. Linking Recyclers and building Forward
Linkages • Discussion on Strategy and planning SOPs developed for PWMUs/MRFs • Demonstrated
for putting in place the PWM system- • Fire Safety Management & Monitoring and
5. Integrating and engaging SHGs CEE is also establishing an MRF at Emergency Plan Reporting Systems
Ranchi in 110 villages and GPs in 2 • Electrical Safety & First Aid and Formats with
6. Understanding Correct Pricing and Payment blocks of Ranchi District. Agreement • Movement of Machinery the State on 3rd
systems- Sustainable Business Model Signed. • Equipment and Machinery November 2023.
• Assets and Amenities
7. Monitoring of Project and MRF Operations • Discussion with the State Team on • Operations
Monitoring and Reporting Systems
Discussions to pilot one district
more. Likely Pakur and Sarai.

Ranchi, Jharkhand
TELANGANA (11 GPs around KAGAZ NAGAR)

KAGAZ NAGAR, TELANGANA (11 GPs around KAGAZ NAGAR (Telangana)


• Awareness building and IEC at individual and community levels on various themes such as Source Segregation, Environment-
Friendly Alternatives, Types of Plastics, etc.
• Wall Painting on various themes like open-burning, composting, and source segregation.
• SHG Livelihood and Empowerment: 2 Cloth Vending Machine, 2 Tailoring Units (60 Beneficiaries)
• Training and Capacity Building to Safai Mitras, MPWs, schools, colleges, State Officials

Kagaz Nagar, Telangana


Swachhata Hi Seva,2023
S.no. State Total Details Total Dry waste Collected Total No.
No. of of People
Events Sensitized
1. Ganjam, Odisha 7 CleanUp Drives|School Awareness and Human Chain|Swachhata • 613 Kgs 1277
Pledge|Swachhata Rally| • 21940 Kgs collected at the MRF
through daily collection
2. Bastar, 11 Cleanliness Shramdaan-SHGs, School, Community|CleanUp • 727.5 kgs 2476
Chhattisgarh Drives|School Awareness and Human Chain|Swachhata • 5128 Kgs collected at the MRF
Pledge|Swachhata Run|Swachhata Rath|Health Camp|Ratri through daily collection
Chowpal|Felicitation Ceremony
3 Ranchi, 5 CleanUp Drives|School Awareness and Human Chain|Swachhata 115 Kgs 1155
Jharkhand Pledge|Swachhata Drawing Competition|

4 KagazNagar, 22 CleanUp Drives|School Awareness|Swachhata Rally|Swachhata 911 kgs 2398


Telangana Pledge|Swachhata Drawing and Essay Writing Competition|

Overall Impacts
WAY FORWARD
◦ Developing SOPs for project interventions in areas of work- Communications, Procurement; civil work, etc.

◦ Data Recording Formats at the MRFs - Waste Collection- Processing- Sale- Safai Mitra inclusivity, IEC actions

◦ Developing Digitized Monitoring systems for better Transparency & Traceability – Dashboards/Apps

◦ Developing Training Modules on various aspects for strategizing effective PWM Systems.

◦ Developing effective communication and IEC Strategy and Collaterals with reference to establishing PWM systems