Introduction of Anton Completion Tools Centre V3
Introduction of Anton Completion Tools Centre V3
2
I. Completion tool center
We are the world's leading provider of completion technology and products, offering a full range of completion
products for all types of reservoirs and well conditions, with project design, product development, manufacturing
and global after-sales service capabilities.
Completion Technology and
Products Industry Group
3
I. Completion tool center
Tianjin factory covers an area of 100,000 square meters; four 6,000 square meter workshops have been
constructed in the first phase.
Screen processing workshop: mainly producing sand control screens and other products.
Machining workshop: mainly producing accessory tools such as hangers, packers and slip-ons.
Packer workshop: mainly producing rubber cylinder, liquid expansion packer and other products.
Production capacity: annual output of more than 200 sets of completion tools; more than 500 sets of liquid expansion
packers; 150,000 meters of sieve pipe.
4
I. Completion tool center
Business Human
R&D Manufacturing
Development Resource
Department Department
Department Department
Machining workshop
5
I. Completion tool center
Qualifications
• API Q1
• API 5CT
• API 11D1
• API 14A
• API 14L
• ISO 9001:2008 IDT
• ISO 14001:2004 IDT
• OHSAS 18001:2007 IDT
• 105 patents acquired
6
I. Completion tool center
7
I. Completion tool center
Markets and Clients
Anton Completion Tools' customers cover all major oil producing regions in the world, including North America, South America,
Middle East, Africa, Central Asia, Southeast Asia and Russia and China.
8
Contents
9
II. Manufacturing capacity
The screen processing workshop is the main production workshop of the completion tool center, which has the characteristics
of high degree of autonomy and stable production efficiency. The workshop has complete production equipment and covers
the whole production node of screens and sand control tools.
10
II. Manufacturing capacity
2. Machining workshop
2 machining centers, 14 CNC machines; 6 general machines, including lathes, milling machines, pipe threads, etc..
Precision
# Equipment Processing range Num
(mm)
0.01
2 CNC lathe HTC40250n Φ500×4000mm 4
0.01
4 CNC lathe HTC2050i Φ500×3000mm 2
0.02
8 4-axis CNC MC A+2100 2100×1000mm 1
11
II. Manufacturing capacity
12
II. Manufacturing capacity
14
Contents
15
III. Quality control
Quality control of raw materials
All raw materials are inspected by quality control before they arrive at the factory and are warehoused after passing.
Commissioned the fifteenth testing station in Tianjin to conduct material mechanical properties testing to ensure the quality
of raw materials in line with ASTM and ISO standards.
External suppliers need to provide a list of material components and proof of third-party testing, as well as material samples.
16
III. Quality control
Quality control of raw materials
• UT (Ultrasonic Testing)
17
III. Quality control
Testing equipment :
Full dimensional inspection of all parts.
A three-coordinate measuring machine is being purchased
# Name Brand Scope of inspection Origin
Rockwell Hardness
1 HuaYin HRA\HRB\HRC China
Gauge
Material chemical
3 Spectrum analyzer Thermo USA
composition Lead Gage
4 Medium Diameter Gauge Gagemaker API- 5B China
18
III. Quality control
Product inspection :
19
III. Quality control
Quality control procedures Raw material purchase contract
Supplier Qualification
Warehouse logistics
Raw material identification Fine manufacturing Raw material turnover record sheet
First piece inspection Warehouse logistics
All sections
Projection inspection Processing operation records
Process Inspection Performance acceptance Process Monitoring
All sections
Dimensional inspection Finished product inspection records
Manufacturing Department
Appearance Inspection Shipping package marking records
Warehouse logistics
Traceability
Inspection records/reports
Recall
Product sales ledger
Quality records Quality records
Customer contact, Product Recall
20
III. Quality control
Refined production
ANTON Oil has lauched SAP software.
The Tianjin plant went live with 2BizBox software for manufacturing
as plant-side operation management.
21
Contents
22
IV. Flow control tools
23
IV. Flow control tools
Basic parameters:
Size: 3.5”
Maximum OD: 115mm(4.528”)
Minimum ID of sliding inner sleeve: 72mm(2.835”)
The ID of seal bore: 71.5mm(2.813")
Material: 4140
Connecting buckle type: 3 1/2in 9.2ppf VAM TOP PIN X
BOX
Rated pressure: 35Mpa
24
1. AT-SSD Circulation/Production Sleeve
Testing:
Open and close the SSD successfully and smoothly,
meet the requirement of design;
At the pressure of 5MPa, 15MPa, 35MPa, 50MPa*
10mins (upper and below) there are no pressure
drop,
the SSD matched with the design requirement.
The SSD meet the design requirements.
25
IV. Flow control tools
26
IV. Flow control tools
1、Non-elastomeric and elastomeric sliding sleeve:
a. Do you have an API 19AC or ISO 14998 license? Which annexes have you been certified to provide?
Answer: We are applying for API 19ac, have completed the preparation of document, and are applying for approval in April. At the same time,
Anton is one of the standard GB / T35148 writers, for China's petroleum industry, which is equivalent to iso14998 and API 19AC;
b. Please explain Engineering support capability, in manufacturing and in the field.
1. Base support:
have 21 global operation bases and 14 overseas bases, covering major oil and gas operation areas;
2. Personnel support:
have 110 well completion engineers;
International staff, field operation engineer, multi regional support ability,
multilingual personnel, with more than 8 years of working experience;
3. Expert system:
Anton global operation system and operation map have realized information management and 24-hour online technical support;
4. Factory capacity:
Tianjin factory covers an area of 100000 square meters;
Four 6000 ㎡ workshops have been built in phase I;
There is a professional inspection and testing organization with CNAs qualification.
Nondestructive testing, material testing and other capabilities;
It has obtained API Q1, ISO 9001:2008, IDT and other quality management system certification;
5. Production capacity per year: more than 500 sets of completion; 1000 sets Swell Packers; 200,000 m Screen;
27
AT-X/XN Landing Nipple
Anton Completion Services offers a complete line of industry standard Landing Nipples.
These nipples are compatible with industry standard locks made for the selected profile and other standard flow
control accessories.
Nipples are available in standard 4130-45 series alloys, 9 or 13 chrome, Inconel and material to match service
environment.
Features
■ Available in Commodity and Certified types
■ Full line of industry standard profiles and sealbores
■ Available with Selective and No-Go varieties
■ Designed for standard and heavy wall tubing sizes
■ Available in standard and premium thread varieties
■ Compatible with standard slickline flow control accessory tools
28
AT-X/XN Landing Nipple
The Model F Seating Nipple is a top no-go or selective seating nipple that provides for the location of various
wireline flow control devices in the production string.
The Model R Seating Nipple is a bottom no-go seating nipple that provides for the location of various wireline
flow control devices in the production string.
Features
■ Sealbore – consistent with Baker’s standard profile size;
■ Sealbore - contoured and polished to pass chevron packing without damage;
■ Integral locking groove;
■ Available in API and premium threads;
29
AT-ECV/ FB & RB Equalizing Check Valve
The AT-FB & RB Equalizing Check Valves prevent downward flow while allowing upward flow through the
device. These wireline retrievable check valves are run and landed in components with Models F or R profiles.
They are utilized to test tubing, set hydraulic packers and prevent fluids from entering the formation during
intermitted gas lift installation.
Features
►Large flow area
►Fluid bypass for retrieval
►Single-trip installation and removal
►Simple design
►Seal with Backer’s standard size
30
AT-ECV/ FB & RB Equalizing Check Valve
Design:
►Seal with PTFE Seal ring;
►Seal Material:Teflon+Carbon fibre + Supramoly
►Ball seat have a high surface finish
31
AT-ECV/ FB & RB Equalizing Check Valve
Testing:
►AT-RB2 Check Vavle 2.75”;
►AT-SNR Setting Nipple 2.75”
►Testing pressure 5000psi;
► pressure drop less than 50psi;
►Testing the function with running tool;
32
AT-BBP/ FWG Bypass Blanking Plug
Testing:
►AT-BBT Blanking Plug 2.75”;
►AT-SNF Setting Nipple 2.75”
►Testing pressure 5000psi;
► pressure drop less than 50psi;
►Testing the function with C1 running tool and Pulling up with B Probe;
33
IV. Flow control tools
34
IV. Flow control tools
a. Do you have an API 14L license? What is the highest validation grade you have for lock mandrels and for
landing nipples?
Answer:
The number of our API 14L license is 14L-0086.
The grade is V3.
35
IV. Flow control tools
Commercial Questions:
1. Who do you use for premium threading for standard and Vallourec connections? What is the lead time for the
Vallourec threading?
Answer: We can provide VALLOUREC threading, as well as fox, bear and other high-quality thread. The processing
service is mainly provided by Changzhou VAM company, and the thread delivery cycle is 2-3 weeks;
2. Aside from your manufacturing facility do you have other stocking locations? Would you be willing to hold inventory?
Answer: Anton international headquarters office is located in Dubai and has transit storage capacity. In addition, we
have operation bases or warehouse capacity in Iraq, Oman, Kazakhstan, Albania, Chad, Ethiopia, Colombia and
Ecuador;We can keep a certain amount of stock.
3.Are you willing to do consignment inventory?
Answer:Yes, we can do these.
36
IV. Flow control tools
Case1---Job in Ecuaduor
37
IV. Flow control tools
38
Contents
39
V. Other completion tools
40
V. Other completion tools
42
Oriental wisdom, Global sharing